TXX-4979, Interim Deficiency Rept CP-86-45 Re Interaction of non-Category I Structures & Components W/Seismic Category I Structures.Initially Reported on 860606.Evaluation Continuing.Next Rept Anticipated by 861003

From kanterella
Revision as of 11:33, 9 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-45 Re Interaction of non-Category I Structures & Components W/Seismic Category I Structures.Initially Reported on 860606.Evaluation Continuing.Next Rept Anticipated by 861003
ML20212P323
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/22/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E, Johnson G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-45, TXX-4979, NUDOCS 8609030076
Download: ML20212P323 (1)


Text

- -

Log # TXX-4979 ,

File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH O1JVE STREET. L.B. 81

  • IBAILAB. TEXAN 78201 August 22, 1986 cm p i Eh%"l2.*2?.7&% N

f^ ~~

AUG 2 T i966 Mr. Eric H. Johnson, Director . --

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SEISMIC CATEGORY II SYSTEMS AND COMPONENTS SDAR: CP-86-45 (INTERIM REPORT)

Dear Mr. Johnson:

On June 6,1986, we verbally notified your Mr. T.F. Westerman of a possible deficiency involving the interaction of non-Category I structures and components with seismic Category I structures. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted an interim report logged TXX-4893, dated July 3,1986.

The review of documentation related to this issue and the investigation of our projects licensing commitments and those of similar NT0L projects requires additional time to complete. We are continuing our evaluation and anticipate submitting our next report by October 3, 1986.

Very truly yours, W. G. Counsil By: . <. /

G.S. Keeley Manager, Nuclear Li ing JCH/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 ,

8609030076 860822 PDR ADOCK 05000445 S PDR \

A ouvssuos o'r rexAs umsn res es.ncrasc co.urany f