Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 860917.Const of New Ceiling Scheduled for Completion by 861101.Next Rept Anticipated by 861114
ML20215E982
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/03/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-54, TXX-6007, NUDOCS 8610160041
Download: ML20215E982 (2)


Text

1

-% k Log # TXX-6007 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NORTH OIJVE STREET. L.B. 81. DALLAS. TEXAS 78201 October 3, 1986 ana*Afaff.TA Mr. Eric H. Johnson, Director ,

[4 @ M D W M V' Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 007 - 7 N-611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

L_ __

'y

~"

SUBJECT:

COMANCHEPEAKSTEAMELECTRICSTATION(CP5ES)

DOCKET NOS. 50-445 AND 50-446 ORIGINAL DESIGN OF CONTROL ROOM CEILING SDAR: CP-86-54 (Interim Report)

Dear Mr. Johnson:

On August 6,1986, we verbally notified your Mr. I. Barnes of a potentially reportable item involving the design and installation'of the control room ceiling. We have submitted an interim report logged TXX-5017, dated September 17, 1986. We have completed our evaluation and have concluded this issue is reportable pursuant to the provision of 10CFR50.55(e). Our evaluation is summarized in the attachment to this report. We anticipate submitting our next report no later than November 14, 1986.

Very truly yours, W. G. Counsil JCH/amb Attachment c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcements (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 i

h 8610160041 861003 PDR ADOCK 05000445 S PDR 9' . . ... - .., _ . - - . - . -

TXX-6007 October 3, 1986 3 i

Page 2 DESCRIPTION Regulatory Guide 1.29 and the FSAR Section 3.7B.2.8 specifies that Category II and non-seismic components should be designed in such a manner that failure will not adversely affect the functions of safety-related components or cause injury to operators.

During evaluation by the NRC Technical Review Team (TRT), the seismic design of the ceiling elements installed in the control room was investigated. The following matrix was provided to identify the ceiling elements and associated seismic designation:

(1) Heating, Ventilating and Air Conditioning - Seismic Category I (2) Safety-Related Conduits - Seismic Category I (3) Nonsafety-Related Conduits - Seismic Category II (4) Lighting Fixtures - Seismic Category II (5) Sloping Suspended Drywall Ceiling - Non-Seismic (6) Acoustical Suspended Ceiling - Non-Seismic (7) Louvered Suspended Ceiling - Non-Seismic For non-seismic items other than the sloping suspended drywall ceiling, and for nonsafety-related conduits of a diameter of two inches or less, no evidence could be produced confirming that the possible effects of a failure of these items had been considered.

A separate reportable deficiency pursuant to 10CFR50.55(e), SDAR-CP-85-36, was issued on September 6,1985 to specifically address two-inch diameter and smaller non-seismic conduit.

SAFETY IMPLICATIONS In the event the condition had remained undetected, a failure of the control room ceiling elements could adversely affect safety-related systems, components, and operator actions under accident conditions, j CORRECTIVE ACTION The control room ceiling has been removed and a seismically-qualified ceiling is being installed. The construction of the new ceiling is scheduled for completion November 1, 1986.