ML20058M980

From kanterella
Revision as of 04:22, 3 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards SE Accepting Transient Analysis Methodology for Plant
ML20058M980
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/30/1993
From: William Reckley
Office of Nuclear Reactor Regulation
To: Carns N
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20058M085 List:
References
TAC-M79740, NUDOCS 9310070215
Download: ML20058M980 (2)


Text

. - .. -

p1 q

, ,.. September 30,1993 L ,

Docket No. 50-482 Mr..Neil S. Carns President'and Chief Executive Officer .;

Wolf Creek Nuclear Operating Corporation  :

Post Office Box 411 l Burlington, Kansas 66839 1

Dear Mr. Carns:

SUBJECT:

WOLF CREEK NUCLEAR OPERATING CORPORATION - TRANSIENT ANALYSIS l METHODOLOGY FOR WOLF CREEK GENERATING STATION (TAC NO. M79740) j By letter dated February 1,1991, Wolf Creek Nuclear Operating Corporation submitted the report, " Transient Analysis Methodology for the Wolf Creek -

Generating Station." This report and the supplemental information provided by letters.of July 16, 1992, January 15, 1993, and February 25, 1993, present the Wolf Creek Nuclear Operating Corporation's methodology for performing analyses of design basis transients. t The staff, with assistance from a consultant, has reviewed the report and supplemental information and finds the methodology acceptable for use by Wolf l Creek Nuclear Operating Corporation. i Sincerely, f l

Original Signed By 7 William. D. Reckley, Project Manager .

Project Directorate IV-2 .

Division ~of Reactor Projects III/IV/V .

Office of Nuclear Reactor Regulation-l

Enclosure:

DISTRIBUTION: 7 Safety Evaluation Docket File SBlack 1 NRC PDR EPeyton .j cc w/ enclosure: Local PDR OGC See next page PDIV-2 Reading ACRS (10) i EAdensam WJohnson, RGN-IV  !

JRoe -BJones WReckley

. office PDIV-2/LA PDIV-2/RM PDIV-2/D {

c== EIeM WReIkYeynb'- SBlach c:te 9pA /93 g/3o /93 9/^-@/93 / / / / I copy T (e's/No / Ten /No Yes/No) Yes/No Yes/No. ) I Document Name: b:\M79740.SE u V g i*

9310070215 930930 E PDR ADOCK 05000482' i P PDRv

^

i a'. ,

Mr. Neil S. Carns September 30, 1993 cc w/ enclosures:

Jay Silberg, Esq. Mr. Otto Maynard Shaw, Pittman, Potts & Trowbridge Vice President, Plant Operations c 2300 N Street, N.W. Wolf Creek Nuclear Operating Corporation 9

.Washington, D.C. 20037 P. O. Box 411 Burlington, Kansas 66839 Mr. C. John Renken Policy and Federal Department Regional Administrator, Region IV Missouri Public Service Commission U.S. Nuclear Regulatory Commission P. O. Box 360 611 Ryan Plaza Drive, Suite 1000 ,

Jefferson City, Missouri 65102 Arlington, Texas 76011 t Regional Administrator, Region III Mr. Kevin J. Moles '

U.S. Nuclear Regulatory Commission Manager Regulatory Services '

799 Roosevelt Road Wolf Creek Nuclear Operating Corporation Glen Ellyn, Illinois 60137 P. O. Box 411 Burlington, Kansas 66839 Senior Resident Inspector i U.S. Nuclear Regulatory Commission P. O. Box 311 '

Burlington, Kansas 66839 Mr. Robert Elliot, Chief Engineer y Utilities Division Kansas Corporation Commission i 1500 SW Arrowhead Road Topeka, Kansas 66604-4027 Office of the Governor State of Kansas -

Topeka, Kansas 66612 Attorney General 1st Floor - The Statehouse Topeka, Kansas 66612  ;

County Clerk I Coffey County Courthouse '

Burlington, Kansas 66839 Mr. Gerald Allen Public Health Physicist .

Bureau of Environmental Health Services  !

Division of Health

  • Kansas Departrent of Health and Environment ,

109 SW Ninth

~ Topeka, Kansas 66612 I

i E

h