Responds to NRC Re Deviations Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11.Corrective Actions:Mods During Current Refueling Outage to Be Completed as Scheduled & Review of LOCA Procedures Completed
ML20083M920
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/07/1983
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20083M865 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.2, TASK-TM 0CAN018302, CAN18302, NUDOCS 8302010497
Download: ML20083M920 (2)


Text

,

ARKANSAS POWER & !.iGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 (501) 371-4000 January 7, 1983

$ $2 Y OCAN018302 I IT  !

Mr. W. C. Seidle, Chief N  !. ~

Reactor Proj;ct Branch #2 lbd U. S. Nuclear Regulatory Commission "

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 NUREG 0737 Item II.B.2, Plant Shielding, IE Inspection 82-14/82-11 Gentlemen:

By letter dated October 25,1982,(OCAN108221) NRC transmitted a " Notice of Deviation" relative to NUREG 0737, " Clarification of TMI Action Plan Requirements",

Item II.B.2, " Design Review of Plant Shielding and Environmental Qualification of Equipment for Spaces / Systems." Prior to receipt of the " Notice of Deviation", this issue had been investigated by AP&L and addressed by our letter of September 29,1.982,(0CAN098219) from Mr. J. R. Marshall to Mr. W.

C. Seidle. As agreed upon with members of your staff, this letter was referenced in our formal response to the " Notice of Deviation" transmitted via letter dated November 24,1982,('0CAN118221) from Marshall to Seidle.

In a subsequent telephone call with Mr. Bill Johnson of your staff, AP&L was requested to provide a status of committents contained in our [[letter::0CAN098210, Suppl 820802 Response to IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Bolted Closure Leaks Not Complete.Results of Review Will Be Provided by 821108|September 29, 1982, letter]]. These commitments are discussed below.

Our [[letter::0CAN098210, Suppl 820802 Response to IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Bolted Closure Leaks Not Complete.Results of Review Will Be Provided by 821108|September 29, 1982, letter]] contained two specific commitments. First, AP&L committed to consider plant modifications during the current refueling outage to divert reactor coolant pump seal return to the quench tank to allow isolation of the seal return line without affecting seal reliability.

A Design Change Package (DCP 81-1066) to accomplish this modification has been approved for installation during the current outage. Barring unexpected difficulties, this modification will be completed as scheduled.

8302010497 830127 PDR ADOCK 05000 W M8 EMBER MIDDLE SOUTH UTILITIES SYSTEM

. o January 7, 1983 The second commitment was to review the Loss of Coolant Accident procedures (1202.06 and 2202.06) to determine if additional provisions and/or cautions

should be added. This review was corpleted on October 14, 1982. The review concluded that no additional rodifications, beyond those made by the

, date of the review, were required.

i Veryp.g truly yours, #

4 John R. Marshall Manager, Licensing JPM:0RH l