ML20088A042

From kanterella
Revision as of 11:38, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Listing of NUREG-0737 Action Items Requiring NRC Approval,Per 840302 Request.Action Items II.F.2 & II.K.3.31 Will Require Addl Submittals,Per Util 830310 & s. Final Resolution of Issues May Not Be Reached by Sept 1984
ML20088A042
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/06/1984
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-TM NUDOCS 8404100453
Download: ML20088A042 (9)


Text

  • ~

Malling Address A11DIma Power Compcny 600 North 18th Street Post Ofhce Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

Senior Vr:e President Flintridge Building AlabamaPower the southern electncsystem April 4, 1984 Docket Nos. 50-348 50-364 4

Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Yarga Joseph M. Farley Nuclear Plant - Units 1 and 2 Completion of NUREG-0737 Items Gentlemen:

Your letter of March 2,1984 requested that Alabama Power Company identify any potential NUREG-0737 problems or items that may not be resolved by September 1984. Attachments 1 and 2 provide a listing with status of those NUREG-0737 items for Units 1 and 2 respectively for which NRC approval of Alabama Power Company position? has not been received. Not included in these listings are items I.C.1, I.D.1 and I.D.2 which have been made part of the NUREG-0737, Supplement 1 actions and items II.B.2.3 for Unit 1 and II.B.2.4 for Unit 2 whose requirements were suspended by 10CFR50.49 on June 30, 1982. It is noted that items II.F.2 and II.K.3.31 will require additional submittals by Alabama Power Company as stated in letters of March 10, 1983 and February 10, 1984, respectively. There is a potential that final resolution on these two issues may not be reached by September 1984.

If you have any questions, please advise.

Yours truly, 840410045305000 840406 4 . L. C1ayto J r.

hDRADOCK FLCJr/ JAR:grs-D30

. Attachments (

cc: Mr. R. A. Thomas Mr. J. P. 0'Reilly h

Mr.'E. A. Reeves

'Mr. W. H. Bradford

<[ikt

c Page 1 Attachment 1 UNIT 1 NUREG-0737 ITEMS ACTION ITEMS- SUBM DATE TAC # COMMENTS

1. -I.A.2.1.Immediate 01-14-81 I.A.2.1.4 closed

. upgrading ~of R0 & SR0 02-01-82

. training and qualifications.

2 I.A.2.3 Administration 01-14-81 of training programs.

13 I.A.3.1 Revise scope and 06-26-80 criteria for licensing 01-14-81

-exams. 02-09-81 08-06-81 10-06-81 04-16-82 02-24-83 4.- II.B.3.2 Post-accident 14-81 44439 sampling modifications. 02-09-81 08-18-82 04-01-83 5 II.B.4.2 Implement 02-09-81 training for mitigating core damage.

6 II.D.1 Relief and Safety 01-14-81 44579 Valve test requirements. 02-09-81 02-13-81 02-23-81 04-01-82 06-04-82 07-01-82 11-04-82 b

7 II.D.3 Valve position 12-15-80

-indication.

8 II.E.1.2 Auxiliary' 12-15-80

-feedwater~ system 01-14-81 initiation and flow. 02-09-81 07-01-81 10-09-81 10-22-81 04-16-82 06-04-82 12-12-83

9.1 II.E.3.1 Emergency. power 12-15-80

.for pressurizer heaters-Technical Specification.

Page 2

-Attachment 1 UNIT 1 NUREG-0737 ITEMS ACTION ITEMS SUBM DATE TAC # COMMENTS 10 II .E .4.1 Dedi cated . 01-14-81 Closed per hydrogen penetrations. NUREG-0748 on 10-30-81.

11. II.E.4.2 Containment- 12-15-80 isolation dependability. 01-14-81 02-13 09-09-81 09-23-81 12 II~ F.2 Instrumenfation

. 12-31-79 45132 Awaiting NRC

~ for detection of _

03-14-80 approval of a system Inadequate Core Cooling- 12-15-80 for operation before 01-14-81 submitting a 02-09-81 schedule to the NRC.

06-24-81 06-29-81 10-06-81 12-22-81 08-03-82 02-01-83 03-10-83

13. II.G.1 Power supplies 12-15-80 for pressur.izer relief 01-14-81 valves, block valves and level indicators.

14 -II.K.2.13 Therrel. 01-14-81 46886 mechanical report. 05-20-81 12-22-81

- 15. _ II .K.3.5 Auto t' rip of 01-14-81:

RCP's. 02-09-81 06-30-81 12-22-81 04-22-83 12-22-83 04-03-84

~16 II.K.3.11 Justify use of 06-26-80 cartain PORV. 01-14-811

07

.t

+.

Paga 3 Attachment 1 .

. UNIT 1 NUREG-0737 ITEMS ACTION ITEMS SUBM DATE TAC # ' COMMENTS

[17.-II.K.3.30S'BLOCA 01-14-81 45824 Awaiting NRC SER methods. 12-22-81 approval of 03-26-82 Westinghouse 06-04-82 N0 TRUMP code '

'01-07-83 (scheduled to be issued in April 1984). This SER will provide final resolution of- this issue.

-18. .II.K.3.31 Compliance 01-14-81 48163 Within one year of

'with 10CFR50.46 06-04-82 receipt of the NRC 01-07-83 SER referenced in

02-10-84 item II.K.3.30, WOG generic studies that-

, demonstrate the conservatism of ~the .

present WFLASH SB LOCA analyses will be completed. This will resolve this issue.

19.- III.A.1.2' Upgrade: 02-13-81' 45943

-Emergency Support. 02-23-81 46014 Facilities. 04-06-81 46086-19-81' 06-04-82 h 20. III .A.2.2 ' Meteorologi cal 02-09-81 46302 i-- -Data. 06-25-81 01'28-82 03-09-82 06-04 07-01-82 08-31-82

' 21. -1II .D .1.1' Prima ry 12-15-80 coolant outside 1 containment - Technical ~

a-'

l Speci fication.

' 22'. : LIII.D.3.4 Control' Room

~

106-26-80 Closed per

- habi.tability.-

06-04-82 NUREG-0748 on 12-12 03-31-83.

~

i

Page 1 Attachment 2 UNIT 2 NUREG-0737 ITEMS t 'ACTIO'N ITEMS SUBM DATE TAC # COMMENTS

1. . I.A.1.2 Shift Supervisor 10-24-79 responsibilities. 12-31-79.

08-22-80 01-14-81

2. 'I.A.2.1 Immediate 07-15-80 upgrade of RO & SRO 08-01-80 training and 01-14-81 qualifications.
3. I.A.2.3 Administration 07-15-80 of training programs. 08-01-80 01-14-81 L4 I.A.3.1 Revise scope and 07-15-80 criteria for licensing 08-01-80 exams. 01-14-81 02-09-81 08-06-81 10-06-81 04-16-82 02-24-83

~

5. I.B.1.2 Evaluation of 08-06-80 crganization and 08-08-80

. management. 01-14-81 .

6. I.C.2 Shift and relief 10-24 turnover procedures. 12-31 06-26-80

~08-06-80 01-14-81

7. ~I.C.3 Shift supervisor 06-20-80 responsibility. 01-14-81

.8. 1.C.4 Control Room 06-20-80 access. 01-14-81

9. 'I.C.7 NSSS vendor review 08-19-80 procedures. 01-14 02-09-81

Page 2 Attachment 2 UNIT 2 NUREG-0737 ITEMS ACTION ITEMS SUBM DATE TAC # COMMENTS 10, I.C.8 Pilot monitoring 06-30-80 of selected emergency 01-14-81 procedures for NT0Ls.

11 I.G.1 Training during 09-11-80 low power testing. 01-14-81 05-18-81

12. II.B.2.1 Plant 08-01-80 shielding: radiation 09-22-80 shielding review. 01-14-81 02-09-81 02-13-81 13 II.B.3 Post-accident 08-01-80 44440 sampling. 01-14-81 02-09-81 02-13-81 08-18-82 11-30-82 04-01-83 12-12-83 I
14. II.B.4.2 Complete 07-29-80 training for mitigating 08-06-80 core damage. 09-24-80 09-25-80

-- 01-14-81 02-09-81 15 II.D.1 Relief and 10-24-79 44580 safety valve test 07-17-80 requi rements . 07-23-80 01-14-81 02-09-81 02-23-81 06-25-81 09-30-81 04-01-82 06-04-82 07-01-82 11-04-82

Page 3 Attachment 2

~ UNIT 2 NUREG-0737 ITEMS ACTION ITEMS SUBM DATE TAC # COMMENTS 1

16. II.D.3 Valve position 08-06-80

. indication. 01-14-81

-17 II.E.1.1 Auxiliary 06-20-80 feedwater system 01-14-81 evaluati,on.

18. II.E.1.2 Auxiliary 08-01-80 feedwater system. 08-06-80 initiation and flow. 12-04-80 01-14-81 1

02-09-81 07-01-81 10-09-81 06-04-82 12-12-83'

- 19.- II.E.3.1' Emergency power 01-14-81 for pressurizer heaters.

'20 II.E.4.1 Dedicated 01-14-81 hydrogen penetrations.

21.-. II.E.4.2 Containment 01-14-81 isolation dependability. 02-13-81 12-20-83 22.- II.F.1.1' Accident 07-24-80 monitoring 09-?2-80 instrumentation

_ procedures.

23.- II.F.2 Instrumentation 06-26-80 Awaiting NRC for detection of 07-17 approval of a system

-inadequate core cooling 07-24-80 for operation before 08-01-80 submitting a 08-06-80 schedule to the NRC.

08-19-80 01-14-81 02-09 02-13-81 03-23-81 06-24-81 06-29-81 10-06-81 02-01-83 03-10-83

Paga 4 Attachment 2 UNIT 2 MUREG-0737 ITEMS 3pTION' ITEMS SUBM DATE TAC # COMMENTS

'24 II.G.1 Power supplies 01-14-81 for pressurizer relief valves, block valves, and level indicators.

'25 II.K.1 IE Bulletins. 06-26-80 01-14-81 2 6. - II.K.2.13' Thermal 01-14-81 46887 mechanical report. 05-20-81 12-22-81 27 II.K.3.5 Auto trip of 01-14-81 RCP's. 06-09-81 06-30-81 12-22-81 04-22-83 12-22-83 04-03-84 1

h 28 II.K.3.11 Justification - 01-14-81 of use of certain PORVs.

29. II.K.3.17 ECCS outages. 01-14-81 02-09-81 02-13-81
30. II.K.3.30 SB LOCA 12-22-81 45825 Awaiting NRC SER methods. . 01-25-82 -approval of

.03-24 Westinghouse NO 03-26-82 TRUMP code 06-04-82 (scheduled to be 01-07-83 issued in April 1984). This SER will provide final resolution of this issue.

/E: ,

..a*

Page 5 Attachment 2

. UNIT 2 NUREG-0737 ITEMS-ACTION ITEMS SUBM DATE TAC # COMMENTS

'31. II.K.3.31 P'lant-Specific 01-14-81 48164 Within one year of Analysis ~(Unit 2) 06-04-82 receipt of the NRC 01-07-83' SER referenced in 02-10-84 item II.K.3.30, WOG generic studies that demonstrate the conservatism of the present WFLASH SB LOCA analysis will be completed.

This will resolve this issue.

~32 III.A.1.1 Emergency ~ '07-14-80 preparedness, short 11-07-80 term.. 01-14-81 .

02-09-81 33 . III.A.1.2 Upgrade 08-01-80 45944 emergency support _02-13-81 46015 facilities. 02-23-81 46087 04-06-81 05-19-81 06-04-82 08-31-82

34 III .A.2.2 'Meteorol ogi cal 02-09-81 46303 data. 06-04-82 07-01-82 08-31-82

-35.7 .III.D.1; Primary coolant 08-20-80 outside containment. 12-08-80 02-09-81 09-08-81 02-15-82

.36. -111.D-3.4 . Control Room- 07-17-80 habitability. 06-04-82 12-12-83