ML20132A804

From kanterella
Revision as of 07:43, 10 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Repts 50-269/84-16,50-270/84-15 & 50-287/84-26.Response Will Be Completed,Reviewed & Submitted No Later than 850201
ML20132A804
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/18/1985
From: Tucker H
DUKE POWER CO.
To: Oreilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8507230258
Download: ML20132A804 (1)


Text

__ - -

DUKE POWER GOMPANY P.O. BOX 33180 CIKARLOTTE, N.C. 28242 HALH. TUCKER TELEPHONE vna enesmany (704) 373-4531

- . - - 85 LWNy A89.39lH Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Subject:

Oconee Nuclear Station IE Inspection Report Nos. 50-269/84-16 50-270/84-15 50-287/84-26

Dear Sir:

-The subject Inspection Reports were transmitted by J. A. Olshinski through a December 21, 1984 letter, which required a response to the cited items of non-compliance to be submitted by January 18, 1985. However, a response is incomplete at this time. It is expected that a response will be completed, reviewed, and submitted to you no later than February 1, 1985.

Very truly yours,

&cd k 4 &

Hal B. Tucker SGG: sib Attachment cc: Mr. J. C. Bryant NRC. Resident Inspector Oconee Nuclear Station 85072go gj@go!69 5" F "'

IEo /