Discusses Third 10-year Interval ISI Program Plan & Associated Relief Requests for BVPS-1 Submitted by Dlc on 970917 & 980618.Informs That NRC Has Adopted Ineel Recommendations in TER INEEL-98-00893.Forwards SE & TER
ML20199F510
Person / Time
Site: Beaver Valley
Issue date: 12/29/1998
From: Capra R
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20199F517 List:
References
TAC-M99673, NUDOCS 9901210340
Download: ML20199F510 (3)


Text

_ _ _ ____ _ _ - _____ _ _ _ _ _ _ _ _ __-__ _______ _-______

, Mr J. E. Cross December 29, 1998 Pr:sid:nt-G:n:r: tion Group Duqu:snm Light Comp:ny Post Office Box 4 Shippingport, PA 15077

SUBJECT:

SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO.1 .

(BVPS-1), INSERVICE INSPECTION (ISI) RELIEF REQUESTS ASSOCIATED WITH THE THIRD 10-YEAR ISI INTERVAL (TAC NO. M99673)

Dear Mr. Cross:

By letter dated September 17,1997, as supplemented June 18,1998, Duquesne Ught Company (DLC) submitted the third 10-year interval ISI program plan and associated relief requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with technical '

assistance from its contractor, the Idaho National Engineering Environmental Laboratory (INEEL), has reviewed and evaluated the relief requests. The applicable edition of Section XI of the American Society of Mechanical Engineers (ASME) Code for BVPS-1 third 10-year ISI interval is the 1989 edition. As described in the enclosed safety evaluation (SE), the NRC staff adopts the INEEL recommendations in the technical evaluation report (TER), which is attached to the SE. The NRC staff has granted relief request Nos.1-TYP-3-83.140-1,1-TYP-3-85.70-1, and 1-TYP-3-RH-E-1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determination that the requirements of the Code are impractical. The alteratives in relief request Nos.1-TYP-3-B-G-1,1-TYP-3-APP-l-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, and 1-TYP-3-N-524 are authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level of quality and safety. The alternatives in relief request Nos.1-TYP-3-B3.120-1 and 1-TYP C6.10-1 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) si:1ce compliance with the code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The relief granted is authorized by law and will not endanger the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee if the Code requirements were imposed on the facility.

Sincerely,

/s/

Robert A. Capra, Director 9901210340 981229 Project Directorate 1-2 PDR ADOCK 05000334 Division of Reactor Projects - t/11 G PDR Office of Nuclear Reactor Regulation Docket No. 50-334 }

l

Enclosure:

Safety Evaluation cc w/encI: See next page . . , 'A l DISTRIBUTION  ;

d ( '.I ( h1 '

Docket File MO'Brien PEr;eigh, RGN I PUBLIC OGC PPatnah.

PDI-2 Reading ACRS GBagchi y JZwolinski GHill(2)  ; .- .

- W RCapra GShear  !

DBrinkman THarris (E-mail SE)

OFFICE PDI-2/PMN A PQl-2/PM PDl[2kb DI-2/D NAME DBrinkmah:rb Mdikri Ma q RCapra" DATE n h 9/98 /L/Ti/98 8 / /98 IE /M/98 OFFICIAL RECORD COPY t' I DOCUMENT NAME: BV99673.REL

~ -

f-c an%

p 1 UNITED STATES

  • } NUCLEARwasmorow, REGULATORY COMMISSION

.,"% o.c. meewom December 29, 1998 {

Mr. J. E. Cross President-Generation Group Duquesne Ught Company Post Omco Box 4 Shippingport, PA 15077

SUBJECT:

SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO.

(BVPS-1), INSERVICE INSPECTION (ISI) REUEF REQUESTS ANiOCIATED WITH THE THIRD 10 YEAR ISI INTERVAL (TAC NO. M99673)

Dear Mr. Cross:

By letter dated September 17,1997, as supplemented June 18,1998, Duquesne Company (DLC) submitted the third 10-year intervsl ISI program plan and associate requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with techni assistance frora its contractor, the Idaho National Engineering Environmental La (INEEL), has reviewed and eva!uated the relief requests. The applicable edition of of the American Society of Mechanical Engineers (ASME) Code for BVPS 1 thir imenmi!s the 1989 s,dition. As described in the enclosed safety evaluation (SE) t

> adopta the INEEL recommendations in the technical eva!ustion report (TER), which to the SE. The NRC staff has granted relief request Nos.1-TYP-3-B3.140-1,1 TYP-3 1 and 1-TYP 3-RH-E 1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determinatio

?

\ 14 requirements o.~l..e Code are impractical. The alteratives in relief request Nos 1-T G-1,1 TYP-3 APP-l 1,1 TYP-3-UT-1,1-TYP 3 N 509,1-TYP-3-N-521, and 1-TYP-3 authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level o quality and safety. The altamatives in relief request Nos.1-TYP-3 B3.1201 and 1-TYP 3-C6.101 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) since compliance with th would rcsult in hardship or unusual difficulty without a compensating -increase - - =.: in the lev defense and security and is otherw!ss in the public interest Nrder; upon the 'icensee if the Code requirements were imposed on the facility. _

Sincerely, w a.C W Robert A. Capra, Director

-.Z .----

T Project Directorate I2 ~' ~ _ _ . . _ -

Division of ReactorProjects-W Omco of Nuclear Reactor Regulation Docket No. 50-334 Er'.csure: U.'ety Evaluation cc w4nc!: See next page

\

J. E. Cross  ;

Duquesne Ught Company Beaver Valley Power Station, Units 1 & 2 1 i

cc:

Jay E. Silberg, Esquire Shaw, Pittman, Potts & Trowbridge Bureau of Radiation Protection 2300 N Street, NW. Pennsylvania Department of Washington, DC 20037 EnvironmentalResources ATTN: MichaelP. Murphy Director-Safetyand Uconsing -

Post Office Box 2063 Department (BV-A) Harrisburg, PA 17120 Duquesne Ught Company Beaver Valley Power Station Mayor of the Borough of PO Box 4 Shippingport Shippingport, PA 15077 Post Office Box 3 Shippingport, PA 15077 Commissioner Roy M. Smith West Virginia Department of Labor Regional Administrator, Region I Building 3, Room 319 U.S. Nuclear Regulatory Commission 4

Caphol Complex 475 Allendale Road Charleston, WV 25305 King of Prussia, PA 19406 Director, Utilities Department Resident inspector Public Utilities Commission U.S. Nuclear Regulatory Commission 180 East Broad Street Post Office Box 298 Columbus, OH 43266-0573 Shippingport,PA 15077 1 i '

Director, Pennsylvania Emergency ManagementAgency Duquesne Ught Company Post Office Box 3321 BeaverValley Power Station '

Harrisburg, PA 17105-3321 -

PO Box 4 Shippingport, PA 15077 Ohio EPA DERR ATTN: S. C. Jain, Senior Vice President ATTN: Zack A. Clayton Nuclear Services (BV A)

Post Office Box 104g Columbus, OH 43266-0149 Mr. J. A. Hultz, Manager Projects & Support Services Dr. Judith Johnsrud First Energy National Energy Committee 76 South Main Street Sierra Club Akron,OH 44308 433 Orlando Avenue State College, PA 16803

_ _ __ .:^ . -. : - = ~ ~ ~ ~

Duquesne Ught Company BeaverValley PowerStation PO Box 4 i 1

Shippingport, PA 15077 ATTN: Kevin L Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV SOSB 7)

-. _.