PM-86-251, Monthly Operating Rept for Aug 1986

From kanterella
Revision as of 00:09, 6 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1986
ML20207D576
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 08/31/1986
From: Kelly D, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-86-251, NUDOCS 8612310089
Download: ML20207D576 (4)


Text

-. - '-

.. .~, 1 -.

,;.6- . .

SHOREHA'! 1;UCLEAR P0k'ER STATION h

  • - y. AVERAGE DAILY UNIT P0k'ER LEVEL DOCKET NO. 50-322 e

UNIT 1 DATE 9/4/86 i

COMPLETED BY D. Kelly TELEPHONE (516)929-8300

. MONTH Auoune 1986 DAY AVERAGE DAILY P0k'ER LEVEL DAY AVERAGE DAILY P0k'ER LEVEL (Mk'e-Net ) (Mk'e-Net )

1 0 17 o .

2 o 18 o .

-3 o 19 0 4 o 20 o 5 o 21 _.. o I 6 o 22 _ o _

7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 10 11 0 27 1 0 28 0 12 13 0 29 0 14 0 30 0 15 0 31 0 f

l 16 0 i

SPF 51.005.01-5, Rev. O i

i fSI f"612310089 860831 PDR ADOCK 05000322

\ I(

, R PDR

F .

. p. A

  • es .

,t -

SHORERAM NUCLEAR POWER STATION $

OPERATING DATA REPORT DOCKET NO. 50-322 UNIT 1 DATE 9/4/86 i COMPLETED BYD. Kelly TELEPHONE (516)929-8300 OPERATINO STATUS

~

1. Reporting Period: 8/86 Gross Hours in Reporting Period 143.3
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): NA
4. Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Number of Hours Reactor wa s Critical. . . . . . . . . 117.7 117.7 117.7
6. Reac to r Rese rve Shutdown Hours. . . . . . . . . . . . . . . . 25.6 25.6 25.6
7. Hours Generator on Line....................... 24.8 24.8 24.8
8. Unit Re s e rve Shutd own Hours . . . . . . . . . . . . . . . . . . . 0 0 0-
9. Cros s The rmal Energy Generat ed (MWH). . . . . . . . .". 5800 5800 5800
10. Gross Electrical Energy Generated (MWH)....... 456 456 , 456
11. Net Electrical Energy Generated (MWH)......... 250 ~ 250 ' - ~ ~ ~~ 25 0~~ -
12. Reactor Service Factor........................ N/A
13. Reactor Availability Factor................... N/A
14. Uni t Se rvic e Fa c t o r. . . . . . . . . . . . . . . . . . . . . . . . . . . N/A
15. Unit Availability Factor...................... N/A
16. Unit Capacity Factor (Using MDC). . . . . . . . . . . . .. N/A
17. Unit Capacity Factor (Using Design MWe)....... N/A
18. Unit Forced Outage Rate....................... N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):

Post 5% Power Ascension Test Program Outage, 9/1/86 to 1/1/87

.20. If Shut Down at end of Report Period, Esticated Date of Startup: 1/1/87

21. Units in Test Status (Prior to Commercial Operation): FORECAST ,

ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 8/26/86 COMMERCIAL OPERATION 9/1/87 SPF 51.045.01-6, Rev. O

T4.

S110REllAM N!! CLEAR POWER STATION 5 C UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-3?? '

st UNIT NAME 1 DATE 9/4/86 ,

COMPLETED BY D. Kelly TELEPIIONE (516)929-8300 REPORT 1:0NT!! August 1986 MET!!OD OF TYPE SilUTTINC DOWN F: FORCED DURATION jTi!E REACTOR OR kEDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS MO. DATE S: SCllEDULED (1100RS) REASON (1) 1 360830 S 3.7 E-Operator 1- Centro 11ed Shutdown training criticals H-Post Five 'l- Controlled Shutdown Total outage hours plus the hourn 2 860831 S 75.4 the generator was on line doesn't percent power equal the gross hours in the Ascension reporting period because of-

' Test Program Power Ascension testing without Outage the generator on.line.

SUMMARY

Completed Five Percant Power Ascension Testing - - - - . . . .

SPe si.cos.oi-7, Rev. e

,, r' LONG ISLAND LIGHTING COMPANY

_w. uum,# . w,.w m..w, ,

SHOREHAM NUCLE AR POWE R ST AT'ON . P.O. Box 628 = W ADING RIVE R, NEW YORK 11792 TE L. (516) 929 8300 September 4, 1986 PM-86-251 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station. August Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours, f

I 4 W.E. St ger, Jr.

Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 TE2A F C 8682.2

- --