1
=
)
SHOREHAM NUCLEAR POWER STATION i
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.50-322 UNIT 1
1 DATE 10/1/87 COMPLETED BYJ. Dreyfuss TELEPHONE (516)929-8300 MONTH September 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
^
1 0
17 0
2 0
13 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13-0 29 0
14 0
30 0
15 0
31 N/A 16 0
SPF 51.005.01-5 Rev. 2
,/
/
gesg8u8mjir
' \\h
'U R
0 s
3 S
s 8
T u
N f
9 E
y 2
M 2
e 9
MO 2
7 r
)
3 8
D 6
C
/
1
/
1 0
4 5
S 5
/
J
(
N 9
O Y
E I
o T
E B
N T
N I
T O
C N
A D
H A
T U
D E
P E
T E
E K
E L
V C
L E
I O
P T
T D
M C
O E
C R
R e
O n
C o
N 7
8 S
9 N
1 O
)
NI r
n 2
OT e
w
(
I C b
R o
TU m
NOR d
AD e
t W
E T E t
F ORW u
S R n
O DOO h
e S
TP R R S
D GC E E O NAG d
W W H
H I EN e
L O O T
T TRI l
P P N
E T C
l O
M UEU o
R D M
HHD r
A N t
STE E A T
R h
n L
R o
t C S O
n C
U N P
o N W E
m O
R M D f
)
A T o
1 H U
(
E H n
R S N
n o
O on i
O H T
%i w t
S 5 t o S I A
a N
E ad r
U t rt u
R s eu d
oph POS
~
e h
)
t NS OR r
I U o
TO f
AH 0
2 n
R(
7 U
w D
o d
tu h
D s
DE EL d
ECU e
PRD n
YOE i
TFH a
C m
S
- S e
F r
S tna 6
l 0
E P
6 T
0 A
7 D
8 i
Y R
A O
3 M
N M
U S
I
.g SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT 1
DATE 10/1/87:
s COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300
~
a>
OPERATING STATUS 1..
Reporting Period:,'9/87 Gross hours-in Reporting Period ' 720 2.-
Currently Authorized Power Level (MWt): 121.8 Hax. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844 3.- Power Level to which Restricted (if any)
(MWe-Net): N/A 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative
- 5.. Number of Hours ' Reac tor-was Critical...........
0 267 524.7 6.
Reactor Reserve Shutdown Hours................._
.720 6195
.9148.6
- 7.. Hours Generator on Line........................
8.1 Unit Res e rve Shu tdown Hours.....................
0 8
32.8 0
0 0
9.
Gross Thereal Energy Generated (MWH)...........
0 719 6490
- 10. Cross Electrical Energy Generated (MVH)........
0 124 580
- 11. Net Electrical Energy Generated (MUH)..........
-0 65 31 5
- 12. Reactor Service Factor.........................
N/A N/A N/A
.13. Reactor Availability Factor....................
N/A N/A N/A
- 14. Unit Service Factor............................
N/A N/A N /A
-15. Unit Availability Factor.........-..............
N/A N/A N/A
- 16. Unit Capacity Factor (Using MDC)...............
N/A N/A
__N/A 17.' Unit Capacity Factor (Using' Design MWe)...'.....
N/A N/A N/A
- 18. Unit Forced Outage Rate.................'.......
N/A N/A N/A
.19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Post 5% Operations Shutdown, 7/87
- 20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 R/?6/R6 COMMERCIAL OPERATION 7 /11/ gg SPF 51.005.01-6 Rev. 2
.e 1
Y ~~ ^
- ~
W U D
a.
e sS oSeI n n a
h.
I pe V
epc r
i f
l W
e rt nN W
P.
y a e o a S
gu E
E a E. Wr s c i
tc l
y o
tr e c r
o c
n S
n t
nbdo n
u im c
c r
g
/
t l
p S
r h
ge d
g M t f:'
u a
r o
z ia y
s n D
l v
s su a e x h
nf e
t c
l A
C W r
a e
~
C 3
A I M
m nl e
ag
- y a
t M i
{
al gf o
n io a
7 N'
e s yl e,
u y
s n w
0 rt i
r r
t t ihci 0
i i Wa s
clotph u a m q
ct r
u a
e sy ntrrT y
e s
e.
t a
oT N
n i
n fe u o R
cf, u o
d O c
n pet h l
s eNuSs hrhn s
s a
e e ei ua c
lnl p
t t c
r Sa l
i
- Iei, l
d nhl o
o na e
wgorS s r r a
R s
n ep urPRe eg eR he e
e a c e o si c
x pmi w
r eio o
p f
rdn n
e s
o ea rNi t
r c
tu On l a
i c a pt c
e l t A
I d t
n ei e
c w o
r nm u
eha n a
ir tsi s
s ipn o c ei fh on c s t t P
t o
s o r hs w c
ra e u e c
t m
R o
Pm r
e r
la u
c n
o a r ni r
tzS c
G d
e a
s S
S s
~
IG C
en t
t 9
er c
1c 1
g j
[
j
\\
.. s
~7
[ g g'O '
LONG ISLAND LIGHTING COM PANY SHOREHAM NUCLE AR POWER ST ATION e P.O. BOX 628 + WADING RIVER NEW YORK 11792 l
.f TE L,1516) 929 8300 i
' October 1, 1987 PM-87-242 Director,' Office of Resource Management l
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a
copy of the Shoreham Nuclear Power Station's Septermber
' Monthly.
Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
I Very truly yours, Wb W.E. Stets r.
Plant Manager WES/pa
. Enclosure cc:
William T. Russell, Regional Administrator Clay Warren, Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 DESIGNA D ORIGITAL Certified B g/./
3 f C p(.n.a.?
_ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _. _ _