Text
___ __ _. _ _ _ _ _
SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT P017ER LEVEL DOCKET No. 50-322 UNIT 1
DATE 8/3/87 4
COMPLETED BY J. Dreyfuss TELEPil0NE (516)929-8300 MONTH July 1987 4
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
l 10 0
26 0
11 0
27 0
12 0
28 0
1 13 0
29 0
l 14 0
30 0
15 0
31 0
16 0
SPF 51.005.01-5 Rev. 2 1
/!/
B709030165 870731 I
DR ADOCK 050 2
L
l l
~,
o SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT 1
DATE 8/3/87 COMPLETED BY J. Dreyfuss TELi ' ~ o E (516)929-8300
~
OPERATING STATUS l.
Reporting Period: 07/87 Gross hours in Reporting Feriod 744 i
2.
Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any)
(MWe-Net): N/A 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of Hours Reactor was Critical...........
0 267 524.7 6.
Reactor Reserve Shutdown Hours.................
744 4731 7684 A 7.
Hours Generator on Line........................
0 8
32.8 8.
Unit Reserve Shutdown Hours....................
0 0
0 9.
Gross Thermal Energy Generated (HWH)...........
0 719 6490
- 10. Gross Electrical Energy Generated (MWH)........
0 124 580
- 11. Net Electrict.1 Energy Generated (MWH)..........
0 65 315
- 12. Reactor Service Factor.........................
N/A
- 13. Reactor Availability Factor....................
N/A
- 14. Unit Service Factor............................
N/A
- 15. Unit Availability Factor.......................
N/A
- 16. Unit Capacity Factor (Using MDC)...............
N/A
- 17. Unit Capacity Factor (Using Design MWe)...'.....
N/A
- 18. Unit Forced Outage Rate........................
N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Post 5% Operation Shutdown 7/87
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 8/26/86 COMMERCIAL OPERATION 7/11/88 SPF 51.005.01-6 Rev. 2
0 0
s 3
S s
8 T
u NE f
9 y
2 M
2 7
e 9
M O
2 8
r
)
3
/
D 6
C
/
1 3
1 S
0
/
5 N
5 8
J
(
O Y
E I
o T
E B
N T
N I
T O
C N
A D
H A
' T U
D E
P E
T E
E K
E L
V C
L E
I O
P T
T D
M C
O E
C R
R OC n
S w
N o
O
)
7 d
NI 2
8 t
(
9 u
I C R
1 h
TU NOR S
AD W
E TE y
F ORW d
l SR u
O DOO e
RR J
TP l
D GC l
EE O NAG o
WW H
H I EN r
OO T
T TRI t
PP N
E T
C n
O MUEU o
RD M
HHD C
R L
R l
CS O
UN P
NW E
O R
)
AT 1
(
s EH n
RS N
on O
O
%i w HT S
5t o SI A
ad N
E t rt U
R s eu o ph POS
)
NS OR I U TO AH R(
4 U
4 D
7 D
- S S
F S
66d "j 0
t E
' W "O E T
0 A
7 D
8 i
. s Y
RA O
M 3
N M
U S
W 414s 4:k-b> MM MAen. - st;y%+>
<e,-
(O{
2
?
LONG ISLAND LIGHTING COM PANY I
h w no-..a n~4 SHORE HAM NUCLE AR POWE R ST ATION = P.O. BOX 628
- W ADING HlVE R. NEW YORK 11792 v. 01 4-TE L. (516) 929 8300 August 6, 1987 PM-87-191 Director, Office of Resource Management U.S. Nuclear Regulatory Commission l
Washington, D.C.
20555
Dear Sir:
i In accordance with Technical Specifications Section 6.9.1.8,.
i enclosed is a copy of the Shoreham Nuclear Power Station's July i
Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
Very truly y urs, i
wA,-
7 W.E. Steiger, Jr.
Plant Manager WES/pa Enclosure cc:
William T. Russell, Regional Administrator Clay Warren Senior Resident Inspector
)
Institute of Nuclear Power Operations, Records Center American Nuclear Insurers i
SR-A43.700 l