.d .

g- "

SHOREHAM NUCLEAR POWER STATION AVERACE DAILY UNIT POWER LEVEL DOCKET NO. 50-322 UNIT 1

~

DATE 10/1/86 i

COMPLETED BY D. Kelly MONTH September 1986

~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 -.

3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 0 25 0 9..

10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 o 31 _

'16 o SPF 51.205.01 5, Rev. 0 a1A 8701060162 860930 2 PDR ADOCK 0500 R

') ~ *:

SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322

' UNIT 1 DATE 10/1/86 i

COMPLETED BYD. Kelly TELEPHONE (516)929-8300

- OPERATING STATUS-720

1. Reporting Period: 9/86 Gross Hours in Reporting Period
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr-t,o Date Cumulative

5. Number of Hours Reactor was Critical.......... 0 117.7 117.7 6.' Re ac tor Re se rve Shutdown Hours. . . . . . . . . . . . . . . . 720 745.6 745.6
7. Hours Generator on Line'....................... 0 24.8 24.8 4.
8. Unit Re se rve Shutd own Hours. . . . . . . . . . . . . . . . . . . 0 0- n
9. Gros s The rmal Energy Generat ed (MWH). . . . . . . . . . 0 5.8x10" 5 Rvin3
10. Gross Electrical Energy Generated (HWH)....... 0 456 456
11. Net Electrical Energy Generated (MWH)......... 0 250 ?so
12. Reactor Service Factor........................ N/A
13. Reactor Availability Factor...........~........ N/A
14. Uni t ' S e rvic e Fa c t o r. . . . . . . . . . . . . . . . . . . . . . . . . . . N/A
15. Unit Availability Factor...................... N/A
16. Unit Capacity Factor (Using MDC).............. L,
17. Unit Capacity Factor (Using Design MWe)....... N/A
18. Unit Forced Outage Rate....................... N/A 14 Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):

Post 5% Power Ascension Test Program Outage, 9/1/86 to 1/1/87

20. If Shut Down at end of Report Period, Estimated Date of Startup: 1/1/87
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 8/26/86 COMMERCIAL OPERATION 9/1/87 SPF $1 005.01-6, Rev. $

.e -

-w -?9 y 9 y w. yrw-- - ,e---w w,.

]. ..

SHOREHAM NUCLEAR POWER STATION .,

UNIT SHUTDOWNS . AND POWEst REDUCTIONS DOCKET No. 50-322 UNIT NAME1 DATE 10/1/86 i

COMPLETED BY D. Kelly --

q

  • TELEPHONE (516)929-8300 REPORT MONTH Sentembet 1986

' METHOD OF TYPE SHUTTING DOWN l

F: FORCED DURATION THE REACTOR OR REASON (1) REDUCING POWER (2)' CORRECTIVE ACTIONS / COMMENTS

, NO. DATE S: SCHEDULED (HOURS) 2 860831 5 720 H-Post 5% 1- Controlled Shutdown l '

Power Ascension Test progra It

! Outage.

l 1

1 l

i SUMNARY: Post 5% Power Ascension Test Program continued during the month.'

SPF 51.995.91-7, Rev. 9

, T .-<

e.,1

<%Ms=-M.venfu swu,y 5 s.strg I E,g f LONG ISLAND LIGHTING COMPANY c+=#m sv.w - w.ume.c, SHOREH AM NOCLE AR POWER STATION P O. BOX 628

  • WADING RIVER, NEW YORK 11792 TE L. (516) 929 8300 October 3, 1986 PM-86-270 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station September Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly ours, W.E. St ger, Jr.

Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 f0).J I'

FC 8682.2