SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT I
DATE 11/2/87 COMPLETED BYJ. Dreyfuss TELEPHONE (516)929-8300
~
OPERATING STATUS 1.
Reporting Period: 10/87 Gross hours in Reporting Period 745 2.
Currently Authorized Power Level (HWt): 121.8 Max. Depend. Capacity (HWe-Net): 839 Design Electrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any)
(MWe-Net): N/A 4
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of Hours Reactor was Critical...........
0 267 524.7 6.
Reactor Reserve Shutdown Hours.................
745 6940 9893.6 7.
Hours Generator on Line........................
0 8
32.8 8.
Unit Reserve Shutdown Hours....................
0 0
0 9.
Gross Thermal Energy Generated (MWH)...........
0 719 6490
- 10. Gross Electrical Energy Generated (MWH)........
0 124 580
- 11. Net Electrical Energy Generated (MWH)..........
0 65 315
- 12. Reactor Service Factor.........................
N/A N/A N/A
- 13. Reactor Availability Factor....................
N/A N/A N/A
- 14. Unit Service Factor............................
N/A N/A N/A
- 15. Unit Availability Factor.......................
N/A N/A N/A N/A N/A
- 16. Unit Capacity Factor (Using MDC)...............
N/A e
- 17. Unit Capacity Factor (Using Design MWe)........
N/A N/A N/A
- 18. Unit Forced Outage Rate........................
N/A N/A N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Post 5% Operations Shutddvn, 7/87
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
N/A
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY o/1/R6 R/26/86 C0KMERCI AL OPERATIOh
,/11/88
\\.
J'}
SPT 51.005.01-6 Rev. 2 h\\
B712070232 871031
(
PDR ADDCK 05000322 R
1 q
)
1 SHOREHAM NUCLEAR POWER STATION I
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
, 322 UNIT l'
DATE 11/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 HONTH October 1987 DAY AVERAGE DAILY WER LEVEL DAY AVERAGE DAILY POWE8 LEVEL (MWe-Net)
I n
17 0
2 n
18 0
3 n
19 0
4 n
20 0
5 n
21 0
6 n
22 0
7 n
23' 0
8 n
24 0
9 n
25 0
10 o
26 0
11 n
27 0
12 n
28 0
13 n
29 0
14-n 30 0
~
15 o
31 0
16 n
SPF 51.005.01-5 Rev. 2
0 S
s 3
T s
8 N
u E
f 9
f 2
7 y
2 9
9 2
8 e
9 0
3
/
r
)
C I
2 D
6
/
0
/
1 S
5 1
5 N
1 J
(
O Y
E I
.o T
E B
N T
N I
T O
C N
A D
H A
T U
D E
P E
T E
E K
E L
V C
L E
I O
P T
T D
M C
O E
C RR e
O n
C o
N 7
S N
8 O
9
)
1 n
NI 2
w OT
(
I C r
R o
TU e
NOR d
AD b
W E
t TE o
F ORW u
O DOO h
SR t
c TP S
RR O
D GC EE O NAG d
WW H
H I EN e
l OO T
T TRI l
PP N
E T
C O
M UEU or RD M
HHD t
R n
L R
o CS O
C UN P
h t
NW E
n O
R o
)
m AT l
(
EH s
f n
o RS N
on O
O
%i w n
HT S
5 t o o
SI A
N E
ad i
t rt t
U R
s eu a
o ph r
POS u
d
)
r NS o
OR f
I U TO 5
n AH R(
w 4
7 o
U d
D t
u hs D
d DE e
EL n
ECU i
PRD a
YOE m
TFH S
e C
r
- S F
n o
S i
t 6
a 0
t E
6 S
T 0
A 7
D 8
i YRA O
3 M
N M
U S
e (E(O LONG ISLAND LIGHTING COM PANY
/&16f/CA40/4#!M SHORE M AM NUCt.E AR POWE R ST ATION
- P O BO X 678
1987 PM-67-261 Director, Office of Resource Management U.S.
Nuclear Regulatory Commission Washington D.C.
20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.6.
enclosed is a
copy of the Shoreham Nuclear Power Station's October Monthly Operating Report which summarines the operating statistics and shutdown e):perience of the Plant.
If you have any questions. please contact us.
Very truly yours, du W.E. Steigerp Jr.
Plant Mana.dr WES/p:
Enclosure cc:
William T.
Russell, Regional Administrator Senior Resident Inspector Clay Warren Institute of Nuclear Power Operations. Records Center American Nuclear Insurers SR-A43.700 l
/o
\\
n/
oS
- o s
$51 i
S gU I C N t. 8.' ?
m__________