PM-86-294, Monthly Operating Rept for Oct 1986
| ML20212L261 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 10/31/1986 |
| From: | Kelly D, Steiger W LONG ISLAND LIGHTING CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PM-86-294, NUDOCS 8701290393 | |
| Download: ML20212L261 (4) | |
Text
f a
SHOREHAM NUCLEAR POWER STATION AVEkAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT 1
DATE 11/3/86 COMPLETED BY D. Kelly TELEPHONE (516)929-8300 MONTH onenber 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 o
18 0
3 o
19 0
4 o
20 0
5 0
21 0
6 o
22 0
7 o
23 0
8 o
24 0
9 o
25 0
10 o
26 0
11 0
27 0
l 12 0
28 0
l 13 0
29 0
14 0
30 0
1 15 0
31 0
16 n
SPF 51.005.01-5 Rev. 2 i
8701290393 861031
}
PDR ADOCK 0500 2
)/
p
(
R
8 SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT 1
DATE 11/3/86 COMPLETED BY D. Kelly TELEPHONE (516)9298300 OPERATING STATUS 1.
Reporting Period: 10/86 Gross hours in Reporting Period 744 2.
Currently Authorized Power Level (MWt):121.8 Max. Depend. Capacity (NWe-Net): 839 Design Electrical Rating (MWe-Net): 844
^
3.
Power Level to which Restricted (if any)
(MWe-Net): NA 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of Hours Reactor was Critical...........
0 117.7 117.7 6.
Reactor Reserve Shutdown Hours.................
744 1.489.6 1.489.6 7.
Hours Generator on Line........................
0 24.8 24.8 8.
Unit Reserve Shutdown Hours....................
0 0
0 9.
Gross Thermal Energy Generated (MWH)...........
0 5.8x103 5.8X103
- 10. Gross Electrical Energy Generated (MWH)........
0 456.
456.
- 11. Net Electrical Energy Generated (MWH)..........
0 250 250
- 12. Reactor Service Factor.........................-
NA
- 13. Reactor Availability Factor....................
NA
- 14. Unit Service Factor............................
NA
- 15. Unit Availability Factor.......................
NA
- 16. Unit Capacity Factor (Using MDC)...............
NA
- 17. Unit Capacity Factor (Using Design MWe)...'.....
NA
- 18. Unit Forced Outage Rate........................
NA
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Post 5% Power Ascension Test Program Out, age, 9/1/86 to 1/1/87
- 20. If Shut Down at end of Report Period, Estimated Date of Startup: 1/1/87
- 21. Units 'in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/R6 R/26/86 COMMERCIAL OPERATION g/1/g7 SPF 51.005.01-6 Rev. 2
SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-322
)
UNIT 1
DATE 11/3/86 COMPLETED BY D. Kelly TELEPHONE (516)929-8300 REPORT MONTH October 1986 METHOD OF TYPE SHUTTING DOWN l
F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS /C0f0fENTS l
2 860831 S
744 H-Post 5% Power 1-Controlled Shutdown Ascension Test Program Outage
SUMMARY
- Post 5% Power Ascension Test Program Outage continued during the month.
SPF 51.005.01-7 Rev. 2 0
)
s-p%WrP9 6.%"4*rpW:+% W o'vWWMS* M'M '
9 gg LONG ISLAND LIGHTING COMPANY 1 +wwws> ; ww,r es e.., %
$HOREH AM NUCLE AR POWER ST ATION
- P O. BOX 628 = W ADING RIVER. NEW YORK 11792 TE L. (bl6) 929 8300 November 5, 1986 PM-86-294 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a
copy of the Shoreham Nuclear Power Station October Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
Very truly yours, W.E.
St-i er, Jr.
Plant Manager WES/km Enclosure cc:
Dr. Thomas Murley, Regional Administrator John Berry Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 3* O F C-8682.2