b

. Apptndix 12.6

. . , Page 1 of 1 SHOREHAM NUCLEAR POWFF STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT 1 DATE 6/1/88 COMPLETED BY T. Polis TELEPHONE _(516)929-8300 MONTH May 1988 DAY AVERAGE DAILY l'0KER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mk'e-Ne t ) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 o 13 0 29 0 14 0 30 0 15 0 31 o 16 o SPP 51.005.01-5 Fev. 3 71{ggg $$80 2 SP 51.005.01 Re ii

.g' Appendix 12.7

- + * ,

Page 1 of 1 f

SH_0REHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 l

UNIT 1 I l

DATE 6/1/88 COMPLETED BY T. Polis TELEPHONE (516)929-8300 OPERATING STATUS ,

1. Reporting Period: 5/88 Grcss hours in Reporting Period 744
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): _g19, Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A
4. heasons for Restriction (if any): N/A This conth Yr to Date Cuculative
5. Number of Hours Reactor was Critical........... O r. sos 7
6. Reactor Reserve Shutdown Hours................. 7 4 /, 164R 16.699 A
7. Heurs Generator on L1ne........................ O O 19.R
8. Unit Reserve Shutdcwn Hours.................... 0 0 0
9. Gross Thermal Energy Gene rat ed (MWE) . . . . . . . . . . . 0 0 6490
10. Gross Electrical Energy Generated (MWH)........ 0 0 SRn
11. Net Electrical Energy Generated (MWH).......... 0 0 315
12. Reactor Service Factor......................... N/A N/A N/A
13. Reactor Availability Factor..................... N/A N/A N/A
14. Unit Service Factor............................ N/A N/A N/A l 15. Unit Availability Factor....................... N/A N/A N/A
16. Unit Capacity Factor (Using P3C)............... N/A N/A N/A
17. Unit Capacity Facter (Using Design MWe)........ N/A ,,, N / A N/A
18. Unit Forced Outage Rate........................ N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Post 5% Operat .ons Shutdown, Start Date 7/87 l

l

20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Centercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/8s 2/Is/Rs INITIAL ELECTRICITY 9/1/86 R/?6/R6 COMMERCIAL OPERATION *
  • To be determined upon issuance of an NRC Full Power Operatin ; e License SPF 51.005.01-6 Rev. 3 SP 51.005.01 Rev. 3 Page 21

1 Appendix 12'.8 ,

Page I o f ,1 SHORFifAM NUCLEAR FOWilR STATION '

UNIT Sig:1DOW'iS AND POWER REPUC'1 IONS DOCKET No.50-322 .-

UNIT 1 DATE 6/1/88 COMPLETED BY T. Polis TELEPi!0NE(516)929-8300 PFPGkT NONTil Mav 1988 METilOD OF TYPE FI:UTTING DOWN F: FORCEI DURATION Tile REACTOR OR NO. DATE S: SCIIEDU L '.D (l!01 RS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS /CCt2iENTS 3 870606 S 744 Post 5% Controlled Sliutdown None Sperations S'.- aitdown SDT1.PY :

SPF 51.005.01-7 Rev. 3 SP 51.005.01 Rev. 3 Page 22

r-V '

. - - . - ~ ~ , ,

e i B i LONG ISLAND LIGHTING COM PANY libww maw g w _~ o a ,ca .. . wag SHORE H AM NUCLE AR POWE R ST ATION a P.O BOX 628. W ADING RIVE R. NEW YORK 11797 T E L. (516) 929 8300 June 2, 1988 PM-88-158 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station's May Monthly Operating Report which summarises the operating et,at-istics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours, W.A$fl s W.E. Stei o , Jr.

Plant Manager WES/ps Enclosure ec: William T. Russell, Regional Administrator Frank Crescenso, Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 s}l ryfl3