PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station
ML20094S254
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/30/1991
From: Calone L, Keelty W
LONG ISLAND LIGHTING CO.
To:
NRC
References
PM-91-075, PM-91-75, NUDOCS 9204140285
Download: ML20094S254 (4)


Text

y c /Eg*O LONG ISLAND LIGHTING COM PANY b IN"Al:MSh&:Ms'

$HOREH AM NUCt E AH POWL R ST AT #ON

  • P O. BOX 628 + W ADING HIVE H NEW Y OhK 11792 T E L 1516) 929 8300 May 1, 1991 FM 91-075 Director, Office of Im ource Management O.S. Nuclear Regulatory Commission ,

Wash $ngton, D.C. 20555 -

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station's April 1991 Monthly Operating Report which summarises the operat,ing statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

O' Sinp)erely , n

)i d

%uhM(<

Q Leonard J. Celone Plant Manager WM:amo Enclosure cc: Thomas T. Martin, Regional Administrator Instituta of Nuc) war Power Operations, Record Center American Nuc3c. 1surers

-)4f 1

9204140205 910430 ADOCK 05000322 /

PDR R PDR / ,

i C-8 6 8 2. 2

Appendix 12.6 Page 1 of 1 SHOREHAM N11 CLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 1

UNIT ___

DATE 05/01/91 COMPLETED BY W. Keelty TELEPHONE (;1 M o?9-9300 MONTH Anril 1941 -

DAY AVERACE DAILY I JWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) (MWe-Net) s 1 0 17 0 2 0 18 _

n 3 0 19 o 4 0 20 n 5 0 21 n ___

6- 0 22 o t

7 0 23 o 8 0 24 n ,

9 ,,

0 25 n 10 0 26 n 11 O a 27 n 12 4 28 n 13 n 29 n

, 14 n 30 n 15 o 31 _

16 o SPF 51.005.01-5 Rev. 4 I

SP 51.005.6i Rev. 4 Page 20

4 Appendfx 12.7 Page_1 of 1

.,T-

.- 'SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. - 50 322 UNIT- 1 DATE nV01/01 COMPLETED BY W.' -

Keelty TELEPHONE (516) 429 8300 OPERATING STATUS .

1. Reporting Period: 04/91 Gross hours in Reporting Period 720
2. Currently Authorized Power Level (MWt): 2436 Max. Depend. Capacity (MWe-Net): H39 Desfgn Electrical Rating (MWe-Net):
3. Power Level to which Restricted (if any) (MWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr to Date ' Cumulative

5. Number of Hours Reactor was Critical. . . . . . . . . . . O n 9?7.1
6. Reactor Reserve Shutdown Hours.................  ??n 2RRn 4?,7?;.6
7. Hours Generator on Line........................ O n -1?,R
8. Unit Reserve Shutdown Hours.................... D n n
9. Gross Thermal Energy Generated (MWH)........... O n ?ln;A
10. Gross Electrical Energy Cenerated (MWH)........ O o 590
11. Net Electrical Energy Generated (MWH).......... n n als
12. Reactor Service Factor......................... N/A ,,, N /A - 9 /A
13. Reactor Availability Factor.................... N_/A N /A N/A 1/p Unit Service Factor............................

N/A N/A N /n

15. Unit Availa'a ility Factor. . . . . . . . . . . . . . .......

2 N/A N/A- N /A -

16. linit Capacity Facto r (Usir.; MDC) . . . . . . . . . . . . . . . N/A N/A N /A

-17.. Unit Capacity Factor (Using 'esign MWe)........ N/n N/A N /A

18. Unit Forced Outage Rate........................ N /A N /n y /n

-19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Dur E on of Each):

i

20. If. Shut Down.at end of Report Period.. Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Lommercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85  ?/15/85 INITIAL ELECTRICITY 9/01/86 8/26/86 COMMERCIAL OPERATION N/A M/A_ _

SPF 51.005.01-6 Rev. 4 l

l SP 51.005.01 Rev. 4 ,

l Page 21

.4

' App::ndix .17.8 SHOREHAM NUCLEAR POWER STATION TTNIT SHliTDOk'NS AND POk'ER REDUCTIONS DOCKET No. c;o_q77 I

UNIT DATE 05/01/91 Fl. Keelty COMPLETED BY TELEPFONE (516) 929-8300 REPORT MONTH Ar>ril 1991 METHOD OF TYPE SHUTTING DOkW F: FORCED DURATION THE REACTOR OR (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS NO. DATE S: SCHEDULED 3 870606 S 720 nost 5% controlled shutchm None2 Operations Shutd%m

~

+

l

SUMMARY

SPF 51.005.01-7 Rev. 4

  • SP 51.005.01 Rev. 4 Page 22 5