.s SHOREHA'! NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-322
,, UNIT
- 1 DATE 1/7/86 i
COMPLETED BY D. Kelly TELEPH01.T (516) 929-8300 December 1985 MONTH DAY AVERACE DAILY P0kT.R LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
SPF 51.005.01-5, Rev. O fi esO4020aa4 e60iai PDR ADOCK 05000322 l
R PDR g
O g
SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322 UNIT
- 1 DATE 1/7/86 i
COMPLETED BY D. Kelly TELEPHONE (516)929-8300 OPERATING STATUS 1.
Reporting Period:12/85 Cross Hours in Reporting Period 0
2.
Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any) (MWe-Net):
N/A 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Nu=ber of Hours Rea ctor wa s Critical..........
0 0
0 6.
Reac tor Rese rve Shutdown Hours................
0 0
0 7.
Hours Generator on Line.......................
0 0
0 8.
Unit Re se rve Shut d own Hours...................
0 0
0 9.
Gros s The rral Ene rgy Generat e d (MWH)..........
0 0
0
- 10. Gross Electrical Energy Generated (MWH).......
0 0
0
- 11. Net Electrical Energy Generated (MWH).........
0 0
0
- 12. Reactor Service Factor........................
N/A
- 13. Reactor Availability Factor...................
N/A
- 14. Uni t S e rvi c e Fa c t o r............ ~..............
N/A
- 15. Uni t Ava ila bili ty Fa ct or......................
N/A
- 16. Unit Capa city Factor (Using MDC)..............
N/A
- 17. Unit Capacity Factor (Using Design MWe).......
N/A
- 18. Unit Forced Outage Rate.......................
N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
N/A
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 9/tq/gs 9/is/gg INITIAL ELECTRICITY 9/i /pg COMMERCIAL OPERATION g /i /gg SPF 51.005.01-6, Rev. 6
e J'
S' Sil0REllAM NUCLEAR POWER STATION UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET No. 50-322 UNIT NAME
- 1 DATE 1/7/86 COMPLETED BY D. Keliv l
TELEPHONE (516)929-8300 REPORT HONTil December 1985 NETilOD OF SilUTTING DOWN TYPE F: FORCED DURATION Tile REACTOR OR NO.
DATE S: SCllEDULED (ll0URS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS None All Environmental Qualification Modifications are complete. The plant is now in full compliance with the license conditions which required the qualification of electrical equipment by November 30, 1985.
SUHMARY:
SPF 51.995.61-7, key, p
F
- 4Ce 4 %TWWxCrs%:d ef v L 1 f
, fig !
LONG ISLAND LIGHTING COMPANY SHORE H AM NUCLE AR POWER ST ATf 0N
- P O. Box 628 WAOING RIVE R, NEW YORK 11792 m-,a.#% <4 n -.. :wc
- ww.
T E L. (516) 929 8300 b
January 8, 1981 PM-86-003 Director, Office of Resource Management U. S.
Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a
copy of the Shoreham Nuclear Power Station December Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have eny questions, please contact us.
Very truly yours,
,A
' b. E.
Steiger, Jr.
W Plant Manager WES/km Enclosure ec:
Dr. Thomas Murley, Regional Administrator John Berry Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700
.e VC 8682.2