Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station
ML20070V361
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 03/31/1991
From: Calone L, Keelty W
LONG ISLAND LIGHTING CO.
To:
NRC
References
PM-91-058, PM-91-58, NUDOCS 9104110160
Download: ML20070V361 (4)


Text

_ . . . . . . , - -

l e a f*

)

, [JMCs/fft$fMf#E4"O LONG ISLAND LIGHTING COM PANY SHORE H AM NUCL E AR POnt H ST AT DN P O. tiOx 628 W ADiNG HIVE R NE ' O M F. 11794 Ti, ,,M 929 8300 April 1, 1991 PM 91-058 i

i 1

Director, Office of Resource Management U.S. Nuclear Regulatory Commission l

I Washington, D.C. 20555 f

l 1

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station's March 1991 Monthly Operating Report which summarices the operating statistics and shutdown experience of the Flant.

If you have any questions, picase contact us.

Singeroly, y n K Ld'rs v Leonard J. alone Plant Manager WK:amo Enclosure ec: Thomas T. Martin, Regional Administ ator Institute of Nuclear Power Operations, Record Center American Nuclear Insurers 1(0002.

L rc as2,2 9104110160 910331 I PDR ADOCK 05000322 '

R _ _ _

PDR ,

Appendix 12.6 Paga 1 of 1 SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-122 UNIT 1 DATE 04/01/91 COMPLETED BY W. Keelty TELEPil0NE (516) 929-8300 MONTil Starch 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY l'0WER LEVEL (MWe-Net) (MWe-Net)

O 17 n 2 0 18 o 3 0 _

19 n 4 0 20 n 5 0 21 n

6 0 22 n 7 0 23 0 8 0
24 0 9 0 25 0 10 0 26 0 11 0 27 -0 12 0 28 0

, 13 0 29 0 14 0 30 0 15 0 31 0 16 0 SPF 51.005.01-5 Rev. 4 SP 51.005.01 Rev. 4 Page 20

Appendin-12.7

  • ' Page 1 of 1 1

-SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT I DATE 04/01/91 l

COMPLETED BY W. Keelty l

TELEPHONE (516) 920-8300 1

OPERATING STATUS

1. Reporting Period 03/91 Gross hours in Reporting Period '744
2. Currently Authorized Power Level (MWt): 2436 Max. Depend. Capacity (HWe-Net) = 830 Design Electrical Rating (MWe-Net): '
3. Power Level to which Restricted (if any)- (MWe-Net): N/A
4. Reasons for Restriction (if any):'

This month Yr to Date Cumulative

5. Number of Hours Reactor was Critical. . . . . . . . . . . O o 527.3
6. Reactor Reserve Shutdown Hours. . . . . . . . . . . . . . . . . 744 -216n- 62.005.6 0 .o 34.6
7. Hours Generator on Line........................- u
8. Unit Reserve Shutdown Hours.................... 0 0 e 3u a u ""
9. Cross Thermal Energy Generated (MWH)........... U 1) i 10. Gross Electrical Energy Generated _(MWH)........

T) 0 580 l 11. Net-Electrical Energy Generated (MWH).......... O. 0 -315

12. Reactor Service Factor......................... N/A N/A N/A l-l 13. Reactor Availability-Factor...................._ - N/A N/A N/A l 14. Unit Service Factor............................ N/A- N/A N/A

! 15. Unic Availability Fac tor. . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A

16. Unir capacity Factor (Using MDC)...........;... N/A- N/A- N/A J-
17. I'.iit Capacity F0ctor (Using Design MWe) . . . . . . . . N/A- N/A U/A l

IP Unit Forced Outage Rate...... . . . . . . . .......... N/A N/A- -h/A 1! . Shutdowns Scheduled Over Next 6 Months ~(Type', Date, and Dufation of Each) -

i

20. I Shut _Down at end of Report _ Period, Estimated Date of Startup: N/A,
21. Units in Test Status (Prior to Commercial Operation): _

FORECAST. ACHIEVED INITIAL CRITICALITY 4 2/13/85 '2/15/85 INITIAL ELECTRICITY o/01/86 8/26/86-COMMERCIAL OPERATION N/A' -N/A SPF 51,00L*i-6 Rev. 4 SP:51.005.01 Rev. 4

.Page 21

' - - - _ - .,ye-r--

  • g .,g.w.y ---%,w g. ~- y,%.4 ++ p, y .,mg, .,9g+, ,eg6 m. g y- gp g*vg e q

Appendix 17.E Page I of I SHOREHAM NUCLEAR POWER STATION liNIT SFUTDOWNS AND POWER FEDUCTIONS 50-322 DOCKET No.

ITNIT 1 l

DATE 04/01/01 COMPLETED BY E' Keelty l TELEPPONE (516) 929-8300 March 1941 REPORT MONTH METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS NO. DATE S: SCHEDULED (HOURS) REASON (1) 3 870606 S 744 Post 5%

Operations Shutdown 1

SITMMARY:

SPF 51.005.01-7 Rev. 4

- SP 51.005.01 Rev. 4

' Page 22 e 8

<