PM-86-019, Monthly Operating Rept for Jan 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1986
ML20203E480
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/31/1986
From: Kelly D, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-86-019, PM-86-19, NUDOCS 8604240236
Download: ML20203E480 (4)


Text

~

SHOREHA'! NUCLEAR POWER STATION AVERACE DAILY UNIT POWER LEVEL DOCKET NO. 50-322

)

,,. UNIT 1

DATE 2/5/86 1

1 COMPLETED BY D. Kelly TELEPHONE (516)929-8300 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 n

2 o

18 n

3 o

19 n

4 o

20 n

5 o

21 n

6 0

22 o

7 o

23 0

8 o

24 o

9 o

25 o

10 0

26 o

11 o

27 o

12 o

28 n

29 13 n

n 30 14 n

n 15 31 o

n 16 o

SPF 51 025.Ol-5, Rev. O kk h

5E2+

SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO.50-322 UNIT i

DATE 2/5/86 t

COMPLETED BYn vn11v TELEPHONE (stat 929-8300 OPERATING STATUS 1.

Reporting Period: 1/86 Gross Hours in Reporting Period 0

2.

Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 l

Design Electrical Rating (MWe-Net): 844 3.

Power Level to which Restricted (if any) (MWe-Net): NA 4

Reasons for Restriction (if any):

This month Yr to Date Cumulative 5.

Nu=ber of Hours Rea ctor wa s Cr* tical..........

0 0

0 6.

Reac tor Rese rve Shutdown Hours................

0 0

0 7.

Hours Generator on Line.......................

0 0

0 S.

Unit Re se rve Shutdown Hours...................

0 0

0 9.

Gros s The rmal Ene rgy Generat ed (MWH)..........

0 0

0

10. Gross Electrical Energy Generated (MWH).......

0 0

0

11. Net Electrical Energy Generated (MRH).........

0 0

0

12. Reactor Service Face::........................

NA

13. Reactor Availabilicy Factor...................

NA

14. Uni t S e rvi c e Fa c t o r...........................

NA

15. Unit Availability Factor......................

NA

16. Unit Ca pa city Factor (Using MDC)..............

NA

17. Unit Capacity Factor (Using Design MWe).......

NA

18. Unit Forced Outage Rate.......................

NA

19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup:

ya

21. Units in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY 7/ta/gs 9/is/gs INITIAL ELECTRICITY 1/1/gg COMMERCIAL OPERATION n/t/gg SPF 51.005 01-6, Rev. 6

._=

i I

S110REllAM NUCLEAR POWER STATION UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-322 UNIT NAME I

DATE 2/s/86 COMPLETED BYD Kelly TELEPHONE g )979_81oo REPORT HONTH January 1986 i

METHOD OF SiluTTING DOWN TYPE F: FORCED DURATION Tile REACTOR OR NO.

DATE S: SCilEDULED (Il0URS)

REASON (1)

REDUCINC POWER (2)

CORRECTIVE ACTIONS /CONMENTS NONE l

i Su m Y:

Work on the reference leg modification continued thrcagh the month of January.

SPF 51 995.$1-7, key. $

o

  • y:y),qtre.~.W K'W.s % f h e

+3 2

gg LONG ISLAND LIGHTING COMPANY SHOREH AM NUCLE AR POWE R ST ATION = P O. BOX 628

i.

m,

.r.- > %. ww.vw,,

TE L. (516) 929 8300-l February 5, 1986 PM-86-019 Of' ice of Resource Manetement Director.

f 1

U. S.

Nuclear Regulatory Commission Washington, D. C.

20555 i

Dear Sir:

In accordance with Techn:.ca1 Specifications Section 6.9.1.8, enclosed is a

copy of the Shoreham Nuclear Power Station January Monthly Report which summarizes the coerating statistics and shutdown experience of the Plant.

1 If you have any cuestions, please contact us.

Very truly yours, W. E.

Stelaer, Jr.

Plant Manager WES/km l

Enclosure 4

ec:

Dr. Thomas Murley, Regional Administrator J

John Berry Senior Resident Inspector l

Institute of Nuclear Power Operations, Records Center l

American Nuclear Insurers SR-A43.700 1

4 1

d f

I f? '

6 I I F C 8682.2 l