SHOREHA'! NUCLEAR POWER STATION AVERACE DAILY UNIT POWER LEVEL DOCKET NO. 50-322
)
,,. UNIT 1
DATE 2/5/86 1
1 COMPLETED BY D. Kelly TELEPHONE (516)929-8300 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 n
2 o
18 n
3 o
19 n
4 o
20 n
5 o
21 n
6 0
22 o
7 o
23 0
8 o
24 o
9 o
25 o
10 0
26 o
11 o
27 o
12 o
28 n
29 13 n
n 30 14 n
n 15 31 o
n 16 o
SPF 51 025.Ol-5, Rev. O kk h
5E2+
SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO.50-322 UNIT i
DATE 2/5/86 t
COMPLETED BYn vn11v TELEPHONE (stat 929-8300 OPERATING STATUS 1.
Reporting Period: 1/86 Gross Hours in Reporting Period 0
2.
Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 l
Design Electrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any) (MWe-Net): NA 4
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Nu=ber of Hours Rea ctor wa s Cr* tical..........
0 0
0 6.
Reac tor Rese rve Shutdown Hours................
0 0
0 7.
Hours Generator on Line.......................
0 0
0 S.
Unit Re se rve Shutdown Hours...................
0 0
0 9.
Gros s The rmal Ene rgy Generat ed (MWH)..........
0 0
0
- 10. Gross Electrical Energy Generated (MWH).......
0 0
0
- 11. Net Electrical Energy Generated (MRH).........
0 0
0
- 12. Reactor Service Face::........................
NA
- 13. Reactor Availabilicy Factor...................
NA
- 14. Uni t S e rvi c e Fa c t o r...........................
NA
- 15. Unit Availability Factor......................
NA
- 16. Unit Ca pa city Factor (Using MDC)..............
NA
- 17. Unit Capacity Factor (Using Design MWe).......
NA
- 18. Unit Forced Outage Rate.......................
NA
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
ya
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 7/ta/gs 9/is/gs INITIAL ELECTRICITY 1/1/gg COMMERCIAL OPERATION n/t/gg SPF 51.005 01-6, Rev. 6
._=
i I
S110REllAM NUCLEAR POWER STATION UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-322 UNIT NAME I
DATE 2/s/86 COMPLETED BYD Kelly TELEPHONE g )979_81oo REPORT HONTH January 1986 i
METHOD OF SiluTTING DOWN TYPE F: FORCED DURATION Tile REACTOR OR NO.
DATE S: SCilEDULED (Il0URS)
REASON (1)
REDUCINC POWER (2)
CORRECTIVE ACTIONS /CONMENTS NONE l
i Su m Y:
Work on the reference leg modification continued thrcagh the month of January.
SPF 51 995.$1-7, key. $
o
- y:y),qtre.~.W K'W.s % f h e
+3 2
gg LONG ISLAND LIGHTING COMPANY SHOREH AM NUCLE AR POWE R ST ATION = P O. BOX 628
- W ADING RIVE R, NEW YORK 11792 l
i.
m,
.r.- > %. ww.vw,,
TE L. (516) 929 8300-l February 5, 1986 PM-86-019 Of' ice of Resource Manetement Director.
f 1
U. S.
Nuclear Regulatory Commission Washington, D. C.
20555 i
Dear Sir:
In accordance with Techn:.ca1 Specifications Section 6.9.1.8, enclosed is a
copy of the Shoreham Nuclear Power Station January Monthly Report which summarizes the coerating statistics and shutdown experience of the Plant.
1 If you have any cuestions, please contact us.
Very truly yours, W. E.
Stelaer, Jr.
Plant Manager WES/km l
Enclosure 4
ec:
Dr. Thomas Murley, Regional Administrator J
John Berry Senior Resident Inspector l
Institute of Nuclear Power Operations, Records Center l
American Nuclear Insurers SR-A43.700 1
4 1
d f
I f? '
6 I I F C 8682.2 l
. _.., _. _ -...... _ - _ -. - _. -., ~.. _ _ _ -... ~... _, -.... _. _ ~ _ _.,
_. _ _.,. _ _ _ _ _ _., _ _ _.