. t

,s S110REHAM I!UCLEAR POWER STATION i

AVERAGE DAILY UNIT P0b'ER LEVEL DOCYIT NO. 50-179 UNIT 1 DATE 6/30/86 i

COMPLETED BY D. Kelly TELEPHO:,*E (516) 929-8300 M3STil June 1986 DAY AVERACE DAILY PO'JR LEVEL DAY AVERAGE DAILY P0b'ER LEVEL (Mb'e-Ne t ) (MWe-Net) 1 o 17 0 2 0 18 o 3 0 19 0 _

4 0 20 0 5 0 21 -

0 6 0 22 0 .

7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 0 27 0 11 0 28 0 12 13 0 29 0 0 30 0 14 15 0 31 16 0 SPF 51.0'5.01-5, Rev. f.

0609100444 060630 .a

/b d PDR ADOCK 05000322 \ \

R pop

i SHOREHAM NUCLEAR POWER STATION n .

OPERATING DATA REPORT DOCKET NO.50-322 UNIT 1 DATE 6/30/86 i

COMPLETED BYD. Kelly TELEPHONE (516)929-8300, OPERATING STATUS

1. Reporting Period: 6/86 Gross Hours in Reporting Period 0
2. Currently Authorized Power Level (MWt):_121.8 Max. Depend. Capacity (MWe-Net): 839 Design Elcetrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A 4 Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Number of flours Reactor was Critical. . ... . . . . . 0 0 0
6. Reactor Reserve Shutdown llours................ 0 0 0
7. llours Generator on Line....................... 0 0 0
8. Uni t Re se rve Shutd own llours. . . . . . . . . . . . . . . . . . . 0 0 0
9. Cros s The rmal EnerEy Generated (MWH).. . ..... r.1 0 0 0

, 10. Gross Electrical Energy Generated (MWH)....... 0 0 0

11. Net Electrical Energy Generated (MWil)......... 0 0 0
12. Reactor Service Factor........................ N/A
13. Reactor Availability Factor...................N/A
14. Unit Service Factor............................ N/A
15. Unit Availability Factor...................... N/A
16. Unit Capacity Tactor (Using MDC)..............__N/A
17. Unit Capacity Factor (Using Design MWe)......._ N/A
18. Unit Forced Outage Rate....................... N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY _2/13/85 2/15/85 INITI AL ELECTRIC 11Y 8/1/86 ,

COMMERCIAL OPERATION 12/1/86 SPT $1.005.01-6, Rev. O

it

\.

I i( --

Sif0REllAM NUCLEAR POW.R STATION ,

UNIT SiluTDOWNS AND POWER REDUCTICNS

- DOCKET No. 50-322 j UNIT NAME 1 d

i DATE 6/30/86 COMPLETED BY D. Kelly l

~* TELEPil0NE (516)929-8300 REroxT ::0:mt J,m, rou

.t MET!IOD OF TYPE SilUTTI!K: DOWN F: FORCED DURATION ,TiiE REACTOR OR CORRECTIVE ACTIONS / COMMENTS JO. DATE S: SCl!EDULED (HOURS) REASON (1) REDUCING POWER (2) a NONE

SUMMARY

Preparations for startup continued during the month of June - - - - -.

SPF 51.005.01-7, Rev. @

~. .

75

, . . _ , , SHORE HAM NUCLE AR POWE R ST ATION = P O BOX 628

  • W ADING RIVE R. NEW YORK 11792 T E L. (516) 929 8300 July 1, 1986 PM-86-184 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station June Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

> Very truly yours, f

e,sn g

< .'E. Steig~erI Jr.

Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 f[$

, . . . , ,