,s S110REHAM I!UCLEAR POWER STATION i
AVERAGE DAILY UNIT P0b'ER LEVEL DOCYIT NO. 50-179 UNIT 1
DATE 6/30/86 i
COMPLETED BY D. Kelly TELEPHO:,*E (516) 929-8300 M3STil June 1986 DAY AVERACE DAILY PO'JR LEVEL DAY AVERAGE DAILY P0b'ER LEVEL (Mb'e-Ne t )
(MWe-Net) 17 0
1 o
2 0
18 o
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
SPF 51.0'5.01-5, Rev. f.
d 0609100444 060630
/b PDR ADOCK 05000322
.a
\\
\\
R pop
SHOREHAM NUCLEAR POWER STATION i
n OPERATING DATA REPORT DOCKET NO.50-322 UNIT 1
DATE 6/30/86 i
COMPLETED BYD. Kelly TELEPHONE (516)929-8300, OPERATING STATUS 1.
Reporting Period: 6/86 Gross Hours in Reporting Period 0
2.
Currently Authorized Power Level (MWt):_121.8 Max. Depend. Capacity (MWe-Net): 839 Design Elcetrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any) (MWe-Net): N/A 4
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of flours Reactor was Critical..........
0 0
0 6.
Reactor Reserve Shutdown llours................
0 0
0 7.
llours Generator on Line.......................
0 0
0 8.
Uni t Re se rve Shutd own llours...................
0 0
0 9.
Cros s The rmal EnerEy Generated (MWH)........ r.1 0
0 0
- 10. Gross Electrical Energy Generated (MWH).......
0 0
0
- 11. Net Electrical Energy Generated (MWil).........
0 0
0
- 12. Reactor Service Factor........................
N/A
- 13. Reactor Availability Factor...................N/A
- 14. Unit Service Factor............................
N/A
- 15. Unit Availability Factor......................
N/A
- 16. Unit Capacity Tactor (Using MDC)..............__N/A
- 17. Unit Capacity Factor (Using Design MWe)......._
N/A
- 18. Unit Forced Outage Rate.......................
N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
N/A
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY
_2/13/85 2/15/85 INITI AL ELECTRIC 11Y 8/1/86 COMMERCIAL OPERATION 12/1/86 SPT $1.005.01-6, Rev. O
it I
i
\\.
(
Sif0REllAM NUCLEAR POW.R STATION UNIT SiluTDOWNS AND POWER REDUCTICNS DOCKET No. 50-322 j
UNIT NAME 1
d i
DATE 6/30/86 l
COMPLETED BY D. Kelly TELEPil0NE (516)929-8300
~*
REroxT ::0:mt J,m, rou
.t MET!IOD OF SilUTTI!K: DOWN TYPE F: FORCED DURATION
,TiiE REACTOR OR JO.
DATE S: SCl!EDULED (HOURS)
REASON (1) REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS a
NONE Preparations for startup continued during the month of June
SUMMARY
SPF 51.005.01-7, Rev. @
~.
75 SHORE HAM NUCLE AR POWE R ST ATION = P O BOX 628
- W ADING RIVE R. NEW YORK 11792 T E L. (516) 929 8300 July 1, 1986 PM-86-184 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station June Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
Very truly yours, fe,sn g
.'E. Steig~erI Jr.
Plant Manager WES/km Enclosure cc:
Dr. Thomas Murley, Regional Administrator John Berry