Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 02/28/1986
From: Kelly D, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-86-060, PM-86-60, NUDOCS 8605140153
Download: ML20210Q628 (4)


Text

.

. .o

~

SHOREHA'1fiUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-322 1

,, UNIT DATI 3/6/86 i

COMPLETED BY D. Kelly TELEPH01.E(516)929-8300

,.;, :TH Febre:ry 1986 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (We-Ne t )

1 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 ,

22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 l

14 0 30 15 0 31 16 0 SPF 51 605.61- 5, Rev. 0 860514015 860228 PDR R ADOCK 05000322 PDR

(=

l l

SHORERAM NUCLEAR POWER STATION )

l OPERATING DATA REPORT DOCKET NO. 50-322

,, UNIT 1 w

DATE 3/6/86 i

COMPLETED BY D. Kelly TELEPHONE (516)929-8300 OPERATING STATUS Reporting Period: 2/86 Gross Hours in Reporting Period 0 1.

2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 344
3. Power Level to which Restricted (if any) (MWc-Net): NA
4. Reasons fer Restriction (if any):

This nonth Yr to Date Cuuulative O

5. Number of Hours Reactor was Critical.......... o o U 0 0
6. Reac tor Rese rve Shutdown Hours. . . . . . . . . . . . . . . .
7. Hours Generator on Line....................... 0 0 0 S. Unit Re se rve Shutd own Hours. . . . . . . . . . . . . . . . . . . 0 0 o
9. Gros s The rcal Ene rgy Generat ed (MWH). . . . . . . . . . 0 0 0
10. Gross Electrical Energy Generated (MWH)....... 0 0 0
11. Net Electrical Energy Generated (MWH)......... 0 0 0
12. Reactor Service Factor........................ NA
13. Reactor Availability Factor................... NA
14. Uni t S e rvic e Fa c t o r. . . . . . . . . . . . . . . . . . . . . . . . . . . NA
15. Unit Availability Factor...................... NA
16. Unit Capacity Fact or (Using MDC). . . . . .. . . . . . . . NA
17. Unit Capacity Factor (Using Design MWe)....... NA
18. Unit Forced Outage Rate....................... NA
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup: NA
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 4/1/86 C0KKERCIAL OPERATION 12/1/86 SPF 51.025.01-6, Rev. e i

1 l

l 4

9 4

) e Sil0REllAM NUCLEAR POWER STATION UNIT SituTDOWNS AND POWER REDUCTIONS 50-322 DOCKET NO.

I UNIT NAME DATE 3/6/86 COMPLETED BY D. Kelly

?

TELEPHONE (516)929-8300 REPORT HONTH February 1986 METHOD OF SHUTTING DOWN TYPE DURATION TI(E REACTOR OR F: FORCED C0kRECTIVE ACTIONS / COMMENTS (HOURS) REASON (1) REDUCING POWER (2)

NO. DATE S: SCilEDULED None l

SUMMARY

Participated in FEMA graded Emergency Plan drill and completed reference leg modification.

SPF 51.995 91-7, key. p

k s -

~

.y , ~nn,c~, ..nn..

f /E_g ) LONG ISLAND LIGHTING COMPANY

.--w*s e o s. .,_+'<u,,

SHOREH AM NUCLE AR POWE R ST ATION

  • P.O. BOX 628 WADING RIVE R, NEW YORK 11792 TE L (516) 929 8300 March 10, 1986 PM-86-060 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear S'r:

In arcordance with Technical Specifications Section E.9.1.8, enclo sed is a cooy of the Shoreham Nuclear Power Station February Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any cuestions, please contact us.

Very truly yours, W. E. Steiger, -J r .

Plant Manager WES/km Enclosure ec: Dr. . Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers ,