Monthly Operating Rept for Dec 1988
ML20196A511
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/31/1987
From: Polis T, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC
References
PM-88-003, PM-88-3, NUDOCS 8802050077
Download: ML20196A511 (4)


Text

____ _ ____ ____ _

, C -

SHOREHAM NUCLEAR POWER STATION

_ AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT, 1 DATEl1Y4/88 COMPLETED BY T. Polis TELEPHONE (516)929-8300 MONTH December 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 .

22 0 7 0 23 0 8 0 24 0 9 0 25 0  !

10 0 26 0 11 0 27 0 12 0 28 0 13 o 29 0 14 0 30 0 15 o l 31 0 16 n SPF 51.005.01-5 Rev. 2 8802050077 871231 PDR R

ADOCK 05000322 b PDR

\g g g

SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT 1 DATE 1/4/88 COMPLETED BY T. Polis TELEPHONE (516)929-8300 OPERATING STATUS

l. Reporting Period: 12/87 Gross hours in Reporting Period 744
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Number of Hours Reactor was Critical........... 0 267 524.7.__
6. Reactor Reserve Shutdown Hours................. 744 8404 11357.6
7. Hours Generator on Line........................ 0 8 32.8
8. Unit Reserve Shutdown Hours.................... 0 0 0
9. Gross Thermal Energy Generated (MWH)........... 0 719 6490
10. Gross Electrical Energy Generated (MW')........

d 0 124 sRn

11. Net Electrical Energy Generated (MWH).......... 0 65 115
12. Reactor Service Factor......................... N/A N/A N/A '
13. Reactor Availability Factor.................... N/A N/A N/A
14. Unit Service Factor............................ N/A N/A N/A
15. Unit Availability Factor....................... N/A N/A N/A
16. Unit Capacity Factor (Using MDC)............... N/A N/A N/A
17. Unit Capacity Factor (Using Design MWe)...'..... N/A N/A N/A
18. Unit Forced Outage Rate........................__,N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)*

i Post 5% Operations Shutdown, Start date'7/87 1

20. If Shut Down at end of Report Period, Estimated Date of Startep: N/A
21. Units in Test Status (Prior to Commerqial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 _

INITIAL ELECTRICITY _111136 8/76/86 COMMERCIAL OPERATION 7/11/RR SPF 51.005.01-6 Rev. 2 i

/

4

)

SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS '

DOCKET No. 50-322 UNIT 1 DATE 1/4 /88 COMPLETED BY T. Polis TELEPHONE (51M929-8300 REPORT MONTH necemhnr 1987 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS 3 870600 S 744 Post 5% . Controlled Shutdown None Operations Shur.down

SUMMARY

$PF 51.005.01-7 Rev. 2 h

e 1

.; .. e 4e/ - , _ . . . - .-

1 s

  1. 44"O L*/41://

LONG ISLAND LIGHTING COM PANY 3

L. s. , ,_ SHOREH AM NUCLE AR POWE R ST ATION a P O. 80 x 678 = W A DING RIV E R. N EW YO R K.11792 T E L. (516) 929 8300 January 5, 1988 PM-88-003 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station's December Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours, 7.[Ih W.E. St41ger, Jr.

Plant Manager WES/pz Enclosure cc: William T. Russell, Regional Administrator Frank Crescenzo, Resident Inspecter Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 OM j gici * '

..... ,,