..g SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL 50-322 DOCKET NO.
1
. UNIT DATE 4-2-86 l
COMPLETED BY D. Kelly TELEPHONE (516)929-8300 MONTH March 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 i
0 1
37 0
0 2
18 0
0 3
39 0
0 20 4
0 0
5 21 0
0 6
22 0
7 0
23 0
0 24 8
0 9
0 25 0
0 26 10 0
0 27 11 0
12 0
28 0
13 0
29 14 0
30 0
j 15 0
31 0
16 0
SPF 51.005.01-5, Rev. O d
gu-8606230017 860331 PDR ADOCK 05000322
\\I R
PDR i}
W
s.'
SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322 UNIT 1
DATE 4-2-86 i
COMPLETED BY D. Kelly TELEPHONE (516)929-8300 OPERATING STATUS 1.
Reporting Period: 3/86 Gross Hours in Reporting Period 0
2.
Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 819 Design Electrical Rating (MWe-Net):
844 3.
Power Level to which Restricted (if any) (MWe-Net): NA 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Nu=ber of Hours Reactor was Critical..........
0 0
0
~
6.
Reac tor Re se rve Shutdown Hours................
O 0
0 7.
Hours Generator on Line.......................
0 0
0 8.
Unit Re se rve Shut d own Hours...................
0 0
0 9.
Cros s The rmal Ene rgy Generated (MWH)..........
0 0
0
- 10. Gross Electrical Energy Generated (MWH).......
0 0
0
- 11. Net Electrical Energy Generated (MWH).........
0 0
0
- 12. Reactor Service Factor........................
NA i
- 13. Reactor Availability Factor...................
NA
- 14. Uni t S e rvic e Fa c t o r...........................
NA
- 15. Unit Availability Factor......................
NA
- 16. Unit Ca pacity Factor (Using HDC)..............
NA
- 17. Unit Capacity Factor (Using Design MWe).......
NA
- 18. Unit Forced Outage Rate.......................
NA
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
NA
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 5/1/86 COMMERCIAL OPERATION 12/1/86 SPF 51.005.91-6, Rev. 6 r
__m
~
~
9 4
+
I 4
Sil0REllAM NUCLEAR POWER STATION UNIT SituTDOWNS AND POWER HEDUCTIONS 50-322 DOCKET NO.
UNIT NAME I
DATE 4-2-86 COMPLETED By D. Kelly
?
TELEPHONE (516)929-8300 March 1986 REPORT HONTH l
1 i
MET 110D OF SilUTTING DOWN j
TYPE F: FORCED DURATION Tite REACTOR OR NO.
DATE S: SCllEDULED (110URS)
REASON (1)
REDUCINC POWER (2)
CORRECTIVE ACTIONS / COMMENTS i
None Su m y: Outage activities are completed.
SPF 51.995 91-7, key. 9
,LL-,
==
Em*, w.,w. u e rmu m 5 40REH AM NUCLE AR POWER ST ATION
- P.O. BOX 628
- WADING RIVE R. NEW YORK 11792 TE L. (516) 929 8300 April 2, 1986 PM-86-085 Director, Office of Resource Management U.S.
Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
In accordance with Technical Specifications Section
- 6. 9.1. 8, enclosed is a copy of the Shoreham Nuclear Power Station March Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
Very trul
- yours, W
=
W.E.
S eiger, Jr.
Plant Manager WES/km Enclosure ec: