SHOREHAM NUCLEAR POWER STATION AVERACE DAILY UNIT POWER LEVEL DOCKET No.
50-322 UNIT 1
DATE 7/1/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 MONTH June 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 o
17 0
2 0
18 0
3 o
19 0
4 61 s 20 0
5 ts 21 0
6 o
22 0
7 n
23 0
8 I
n 24 0
9 o
25 0
10 n
26 0
11 n
27 0
12 n
28 0
13 n
29 0
14 q
30 0
15 n
31 N /A 16 n
SPF 51.005.01-5 Rev. 2 8708190402 870630 PDR ADOCK 05000322 b
R paa g(g
.. **.~.
t l
SHOREllAM NUCLEAR POWER STATION OPERATING DATA REPORT l
DOCKET No. 50-322 l
l UN17 1
DATE 7/1/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 OPERATING STATUS 1.
Reporting Period: 6/87 Gross hours in Reporting Period 720
\\
2.
Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any)
(MWe-Net): N/A 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of flours Reactor was Critical........... 127 267 524.7 6.
Reactor Reserve Shutdown Hours.................
593 3987 6940.6 7.
Hours Generator on Line........................
8 8
32.8 8.
Unit Reserve Shutdown Hours....................
0 0
0 9.
Gross Thermal Energy Generated (MWil)...........
390 719 6490
- 10. Gr'oss Electrical Energy Generated (MWil)........
124 124 580
- 11. Net Electrical Energy Generated (MWH)..........
65 65 315
- 12. Reactor Service Factor.........................
N/A
- 13. Reactor Availability Factor............
....... N/A
- 14. Unit Service Factor...........
................N/A
- 15. Unit Availability Factor.......................
N/A
- 16. Unit Capacity f actor (Using MDC)............... N/A
- 17. Unit Capacity Factor (Using Design MWe)........
N/A
- 18. Unit Forced Outage Rote........................
N/A
- 19. Shutdowns Scheduled Over Next 6 Months (7ype, Date, and Duration of Each):
Post 5% Operations Shutdown 7/87
- 20. If Shut Down at end of Report Period, Estimated Date of Startup:
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACillEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 8/26/86 COMMERCIAL OPERATION 7/11/88 SPF 51.005.01-6 Rev. 2
0 s
0 S
s 3
T u
8 N
f E
y 9
M 2
7 e
2 M
2 8
r 9
O 3
1
/
D
)
C 1
6
/
0
/
1 S
5 7
J 5
N
(
O Y
E I
.o T
E B
N T
N I
T O
C N
A D
H A
- T U
D E
P E
T E
E K
E L
V C
L E
I O
P T
T D
M C
O E
C R
R O
C S
7 n
N 8
w O
9
)
o NI 1
2 d
(
t I C e
R u
TU n
NOR h
AD u
W E
S TE J
F ORW SR O DOO d
TP e
RR D
GC l
EE O NAG l
WW H
H I EN o
OO T
T TRI r
PP N
E T
C t
O M UEU n
RD M
HHD o
AN STE C
EA T
R L
R 1
CS O
UN P
NW E
O R
)
AT 1
(
's EH
% n R S 5 o n O
C iw HT S
t t o S I A
s ad N
E ort U
R P eu
- ph HOS
)
NS OR I U TO AH 3
R(
9 U
5 D
S
- S F
S f
0 E
6 T
0 A
7 D
8 YR A
O M
N 3
M U
S l
];,.
L y.
3n=-,,-
.3 f
E,g k LONG ISLAND LIGHTING COM PANY-SHORE H AM NUCL E AR POWE R ST ATION
- P.O. BO A 678
- W ADING Hive R, NEW YORK 11792
,4wr,*, > 9 e - o wwe n,,,,
T E L (516) 929 8300 July 14, 1987 PM-87-175 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station's June Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
)
Very truly yours, Yh d.E. Stei er, r.
Plant Manager WES/pa Enclosure cc: