Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARPM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station ML20042G7151990-04-30030 April 1990 Monthly Operating Rept for Apr 1990 for Shoreham Nuclear Power Station.W/900504 Ltr ML20006E3961990-01-31031 January 1990 Monthly Operating Rept for Jan 1990 for Shoreham Nuclear Power Station Unit 1.W/900206 Ltr ML19327A7131989-09-30030 September 1989 Monthly Operating Rept for Sept 1989 for Shoreham Nuclear Power Station Unit 1.W/891006 Ltr PM-89-174, Monthly Operating Rept for Aug 1989 for Shoreham Nuclear Power Station1989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for Shoreham Nuclear Power Station PM-89-148, Monthly Operating Rept for Jul 1989 for Shoreham1989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for Shoreham PM-89-128, Monthly Operating Rept for June 1989 for Shoreham Nuclear Power Station1989-06-30030 June 1989 Monthly Operating Rept for June 1989 for Shoreham Nuclear Power Station PM-89-109, Monthly Operating Rept for May 1989 for Shoreham Nuclear Power Station1989-05-31031 May 1989 Monthly Operating Rept for May 1989 for Shoreham Nuclear Power Station PM-89-089, Monthly Operating Rept for Apr 1989 for Shoreham Nuclear Power Plant1989-04-30030 April 1989 Monthly Operating Rept for Apr 1989 for Shoreham Nuclear Power Plant PM-89-061, Monthly Operating Rept for Mar 1989 for Shoreham Nuclear Power Station1989-03-31031 March 1989 Monthly Operating Rept for Mar 1989 for Shoreham Nuclear Power Station PM-89-037, Monthly Operating Rept for Feb 1989 for Shoreham Nuclear Power Station1989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for Shoreham Nuclear Power Station PM-89-019, Monthly Operating Rept for Jan 1989 for Shoreham Nuclear Power Station1989-01-31031 January 1989 Monthly Operating Rept for Jan 1989 for Shoreham Nuclear Power Station PM-88-233, Monthly Operating Rept for Oct 1988 for Shoreham Nuclear Power Station Unit 11988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for Shoreham Nuclear Power Station Unit 1 PM-88-226, Monthly Operating Rept for Sept 1988 for Shoreham Nuclear Station Unit 11988-09-30030 September 1988 Monthly Operating Rept for Sept 1988 for Shoreham Nuclear Station Unit 1 PM-88-208, Monthly Operating Rept for Aug 1988 for Shoreham1988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Shoreham PM-88-173, Monthly Operating Rept for June 1988 for Shoreham Nuclear Power Plant1988-06-30030 June 1988 Monthly Operating Rept for June 1988 for Shoreham Nuclear Power Plant PM-88-158, Monthly Operating Rept for May 1988 for Shoreham Nuclear Power Station1988-05-31031 May 1988 Monthly Operating Rept for May 1988 for Shoreham Nuclear Power Station PM-88-030, Monthly Operating Rept for Jan 19881988-01-31031 January 1988 Monthly Operating Rept for Jan 1988 PM-88-003, Monthly Operating Rept for Dec 19881987-12-31031 December 1987 Monthly Operating Rept for Dec 1988 PM-87-261, Monthly Operating Rept for Oct 19871987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 PM-87-242, Monthly Operating Rept for Sept 19871987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 PM-87-220, Monthly Operating Rept for Aug 19871987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 PM-87-191, Monthly Operating Rept for Jul 19871987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 PM-87-175, Monthly Operating Rept for June 19871987-06-30030 June 1987 Monthly Operating Rept for June 1987 PM-87-156, Monthly Operating Rept for May 19871987-05-31031 May 1987 Monthly Operating Rept for May 1987 PM-87-109, Monthly Operating Rept for Apr 19871987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 PM-87-072, Monthly Operating Rept for Mar 19871987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 PM-87-046, Monthly Operating Rept for Feb 19871987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 PM-87-021, Monthly Operating Rept for Jan 19871987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 PM-87-001, Monthly Operating Rept for Dec 19861986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 PM-86-318, Monthly Operating Rept for Nov 19861986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 PM-86-294, Monthly Operating Rept for Oct 19861986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 PM-86-270, Monthly Operating Rept for Sept 19861986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 PM-86-251, Monthly Operating Rept for Aug 19861986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 PM-86-213, Monthly Operating Rept for Jul 19861986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 PM-86-184, Monthly Operating Rept for June 19861986-06-30030 June 1986 Monthly Operating Rept for June 1986 PM-86-159, Monthly Operating Rept for May 19861986-05-31031 May 1986 Monthly Operating Rept for May 1986 PM-86-128, Monthly Operating Rept for Apr 19861986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 PM-86-085, Monthly Operating Rept for Mar 19861986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 PM-86-060, Monthly Operating Rept for Feb 19861986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 PM-86-019, Monthly Operating Rept for Jan 19861986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 PM-86-003, Monthly Operating Rept for Dec 19851985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 PM-85-280, Monthly Operating Rept for Nov 19851985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 1991-07-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20135D8011996-11-26026 November 1996 Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced ML20080G4691995-01-26026 January 1995 Record of Telcon W/Nrc & Licensees 950126 to Clarify Position Re Dispositioning of Exempt Sources Listed in Section 6.3.3 of Shoreham Termination Survey Final Rept Dtd Oct 1994 ML20069F0001994-01-24024 January 1994 Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20057F2261993-09-30030 September 1993 Safety Evaluation Supporting Exemption Request from Requirements of 10CFR50.54(q) for License NPF-82 ML20056C7181993-07-14014 July 1993 SE Supporting Amend 10 to License NPF-82 ML20045B3551993-06-11011 June 1993 LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20044C1181993-02-28028 February 1993 Shoreham Nuclear Power Station Updated Decommissioning Plan. ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20128B9641992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20114A6311992-07-28028 July 1992 Shoreham Decommissioning Plan ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar PM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station ML20024G7171991-04-22022 April 1991 LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr SNRC-1806, Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 19901991-04-15015 April 1991 Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 1990 PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 19901990-12-31031 December 1990 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990 SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,19901990-12-31031 December 1990 Shoreham Nuclear Power Station Annual Operating Rept,1990 SNRC-1799, Lilco 1990 Annual Rept1990-12-31031 December 1990 Lilco 1990 Annual Rept ML20069Q3901990-12-31031 December 1990 Shoreham Nuclear Power Station Decommissioning Plan. (Filed in Category P) ML20028H0231990-09-28028 September 1990 LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr ML20056A2001990-07-31031 July 1990 Safety Evaluation Supporting Amend 6 to License NPF-82 PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station ML20055E3911990-06-25025 June 1990 Safety Evaluation Supporting Amend 5 to License NPF-82 PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 1997-05-01
[Table view] |