Monthly Operating Rept for Dec 1985
ML20210G059
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/31/1985
From: Kelly D, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-86-003, PM-86-3, NUDOCS 8604020334
Download: ML20210G059 (4)


Text

.s SHOREHA'! NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-322

,, UNIT #1 DATE 1/7/86 i

COMPLETED BY D. Kelly TELEPH01.T (516) 929-8300 MONTH December 1985 DAY AVERACE DAILY P0kT.R LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0  !

1 0 17 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 SPF 51.005.01-5, Rev. O esO4020aa4 e60iai PDR ADOCK 05000322 PDR fi l R g

O g

SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322

,, UNIT #1 DATE 1/7/86 i

COMPLETED BY D. Kelly TELEPHONE (516)929-8300 OPERATING STATUS

1. Reporting Period:12/85 Cross Hours in Reporting Period 0
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Nu=ber of Hours Rea ctor wa s Critical. . . . . . . . . . 0 0 0
6. Reac tor Rese rve Shutdown Hours. . . . . . . . . . . . . . . . 0 0 0
7. Hours Generator on Line....................... 0 0 0
8. Unit Re se rve Shut d own Hours. . . . . . . . . . . . . . . . . . . 0 0 0
9. Gros s The rral Ene rgy Generat e d (MWH). . . . . . . . . . 0 0 0
10. Gross Electrical Energy Generated (MWH)....... 0 0 0
11. Net Electrical Energy Generated (MWH)......... 0 0 0
12. Reactor Service Factor........................ N/A
13. Reactor Availability Factor................... N/A
14. Uni t S e rvi c e Fa c t o r. . . . . . . . . . . . ~. . . . . . . . . . . . . . . N/A
15. Uni t Ava ila bili ty Fa ct or. . . . . . . . . . . . . . . . . . . . . . N/A
16. Unit Capa city Factor (Using MDC). . . . . . . . . . . . . . N/A
17. Unit Capacity Factor (Using Design MWe)....... N/A
18. Unit Forced Outage Rate....................... N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 9/tq/gs 9/is/gg INITIAL ELECTRICITY 9/i /pg COMMERCIAL OPERATION g /i /gg SPF 51.005.01-6, Rev. 6

e J'

' ' S' Sil0REllAM NUCLEAR POWER STATION UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET No. 50-322 UNIT NAME #1 DATE 1/7/86 COMPLETED BY D. Keliv l

TELEPHONE (516)929-8300 REPORT HONTil December 1985 NETilOD OF TYPE SilUTTING DOWN F: FORCED DURATION Tile REACTOR OR REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS NO. DATE S: SCllEDULED (ll0URS) REASON (1)

None All Environmental Qualification Modifications are complete. The plant is now in full compliance

. with the license conditions which required the qualification of electrical equipment by November 30, 1985.

SUHMARY:

SPF 51.995.61-7, key, p

F

  • 4Ce 4 %TWWxCrs%:d ef v L 1

, fig ! LONG ISLAND LIGHTING COMPANY f SHORE H AM NUCLE AR POWER ST ATf 0N

  • P O. Box 628 WAOING RIVE R, NEW YORK 11792 m-,a.#% <4 n -.. :wc
  • ww.

T E L. (516) 929 8300 b

January 8, 1981 PM-86-003 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station December Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have eny questions, please contact us.

Very truly yours,

,A

' b .W E. Steiger, Jr.

Plant Manager WES/km Enclosure ec: Dr. Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700