ML20215M056
| ML20215M056 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/15/1987 |
| From: | Roberts E EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY |
| To: | Carrington M Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20215M061 | List: |
| References | |
| CON-FIN-D-6001 EWR-126-87, GL-83-28, NUDOCS 8706260261 | |
| Download: ML20215M056 (1) | |
Text
' '
- ON
/NEA ideho Nethmet Engineering Laboratory May 15, 1987 Mr. M. Carrington, Project Manager Office of Nuclear Reactor Regulation l U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO GENERIC LETTER 83-28, ITEM 2.2.2--VENDOR INTERFACE PROGRAMS FOR ALL OTHER SAFETY-RELATED COMPONENTS: PERRY-1," EGG-NTA-7627, MAY 1987 (FIN D6001) - EWR-126-87 j l
l Ref: NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For l OLs (Project 2)" (D6001) !
Dear Mr. Carrington:
l Transmitted herewith is the above subject report.
The report documents INEL's evaluation of the licensee actions in response i to NRC Generic Letter 83-28, Item 2.2.2--Vendor' Interface Programs for All !
Other Safety-Related Components. Based on the licensee submittal, we l conclude that the plant does not conform to the generic letter on this ,
item. The licensee should establish interfaces with the vendors of major I safety-related components.
Very truly yours, E. W N / g/i u =.
E. W. Roberts, Manager NRC Headquarters Support ACU:gp
Enclosure:
As Stated cc: G. L. Jones, DOE-ID D. Lasher, SICB (2)
J. O. Zane, EG&G Idaho, Inc. (w/o Encl .) 4 P
h EGsG w . ,,,.. ntre acckvme pike suite tro Rockvme, no 20esz