Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan
ML20217C172
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/07/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20217C175 List:
References
50-482-99-09, NUDOCS 9910130181
Download: ML20217C172 (5)


See also: IR 05000482/1999009

Text

--

.

q. j d# "%c, UNITED STATES

3 *. . NUCLEAR REGULATORY COMMISSION

REGloN IV

g* g e 611 RYAN PLAZA DRIVE, sulTE 400

,,,g ARLINGTON, TEXAS 760118064

October 7, 1999

Otto L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

- P.O. Box 411

)

Burlington, Kansas 66839

SUBJECT: NRC INSPECTION REPORT NO. 50-482/99-09

Dear Mr. Maynard:

This refers to the inspection conducted on August 30 through September 3,1999, at the Wolf

Creek Generating Station facility. The purpose of the inspection was to perform the routine

operational status inspection of the emergency preparedness program and to resolve questions

about the revised emergency plan. The enclosed report presents the results of this inspection.

It is our understanding that during the inspection exit meeting conducted on September 3,

1999, Wolf Creek management stated that Wolf Creek Nuclear Operating Corporation would

revise the station emergency plan to resolve the differences identified between the plan and 10

CFR Part 50, Appendix E, and would provide to the NRC a proposed date for completion of the

plan revision. Please confirm this regulatory commitment in writing within 30 days of the date of

this letter,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely, ,

-

c.

f. (S. (

Gail M. Good, Chief

Plant Support Branch

Division of Reactor Safety

Docket No.: 50-482

License No.: NPF-42

Enclosure:

NRC Inspection Report No.

50-482/99-09

9910130181 991007

PDR ADOCK 05000482

G PDR

F. :

.*

l- Wolf Creek Nuclear Operating Corporation -2- ,

I

cc w/ enclosure:

i Chief Operating Officer -

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

'

.Burlington, Kansas 66839

Jay Silberg, Esq,

_

Shaw, Pittman, Potts & Trowbridge

2300 N Street, NW

Washington, DC 20037

' Supervisor Licensing

Wolf Creek Nuclear Operating Corp.

g - . P.O. Box 411 -

Burlington, Kansas 66839

Chief Engineer-

,

Utilities Division -

l

. Kansas Corporation Commission

1500 SW Arrowhead Rd.

L Topeka, Kansas 66604-4027

Office of the Governor

State of Kansas

! Topeka, Kansas 66612

Attorney General l

Judicial Center -

301 S.W.10th

2nd Floor

' Topeka, Kansas 66612-1597

,

County Clerk

Coffey County Courthouse

110 South 6th Street

Burlington, Kansas 66839-1798

l

Vick L. Cooper, Chief ,

I Radiation Control Program )

l Kansas Department of Health

! ~ and Environment -

Bureau of Air and Radiation

Forbes Field Building 283

Topeka, Kansas 66620

l

L i

I

!

E,,

.

'

..._

i4

I f f

! .: . ,.

' "

< r

-l Wolf Creek Nuclear Operating Corporation -3-

.,.

'

Frank Moussa '

l: '

' Division of Emergency Preparedness

' 2800 SW Topeka Blvd '

Topeka, Kansas 66611-1287

l

r-

_

'M

,\

l

l

l

i

'

'

l

i

1

-

1

u

L

y

!- ?:

p

,6

l- Wolf Creek Nuclear Operating Corporation -4-

E-Mail report to T. Frye (TJF)

E-Mail report to D.' Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)-

l

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE35)

bec distrib. by RIV:

Regional Administrator Wolf Creek Resident inspector

DRP Director. SRI (Wolf Creek, RIV)

DRS Director RIV File

Branch Chief (DRP/B) RITS Coordinator

Project Engineer (DRP/B) Branch Chief (DRP/TSS)

.. DRS Action item (Goines)(99-G-

l

'

i

,

l

DOCUMENT NAME: R:_WC\WC909RP.PJE.WPD -

To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy witti,g. closures "N" = No copy

RIV:PSB PSB E PSB E.,C1DRS\P48 / E Q:DRP\B dM

Peer Review - HAFreemaW.iih

/ /99

PJElkmann 8)i$MGoodW'WDJohnson

9 /49/99V6I &n';)/3a /99 f }h"

? /2 7/99  ? /A9 /99

OFFICIAL RECORD COPY /L/67/g

I

,

1200'J6

L

1

i

Q

!~

l

.

Wolf Creek Nuclear Operating Corporation -4-

i

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL) l

- E-Mail report to NRR Event Tracking System (IPAS) I

E-Mail report to Document Control Desk (DOCDESK) i

"

bec to DCD (IE35)

bec distrib. by RIV: ,

, Regional Administrator ' . Wolf Creek Resident inspector I

DRP Director SRI (Wolf Creek, RIV) ')

DRS Director RIV File

Branch Chief (DRP/B) RITS Coordinator

Project Engineer (DRP/B) Branch Chief (DRP/TSS)  !

DRS Action item (Goines)(99-G- 1

1

'

i

4

)

! DOCUMENT NAME: R: WC\WC909RP.PJE.WPD

_

( To receive copy of document, Indicate in box: "c" = copy without enclosures "E" = Copy withacciosures 'N' = No copy

l RIV:PSB PSB E PSB E ,CfDRS\P48 / E G:DRP\B dj()

'

Peer Review - HAFreemaff.Hh PJElkmann d)EfUMGoodW'WDJohnsonf h

/ /99 9 /2 7/99 7 /34 /99 9 /d/99 V6%"0 9/32/99 j

OFFICIAL RECORD COPY /C#f, i

l

l

l

1

l.  ;

L.