ML20235F543

From kanterella
Revision as of 18:04, 27 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That WENX-86-12, Evaluation of Up to 10% Steam Generator Tube Plugging on CN Almaraz Units 1 & 2, Provided on 870922 in Response to Questions Re 870602 Proposed Tech Spec Change Increasing Steam Generator Tube Plugging Limit
ML20235F543
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/23/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-62283, TAC-62284, NUDOCS 8709290188
Download: ML20235F543 (1)


Text

h p

g b Abbama Power Company lt , ' 600 North 18th Street

!- . Post Office Box 2641

l. /' Birmingham, Alabama 35291-0400 F ' Telephone 205 250-1835 R. P. Mcdonald .

m i; Senior Vice President Alabama Power- 1 the southern electrc t,$lern 1

September 23, 1987 10CFR50.g.: 'I Doi.ket.' % , 348 gt c:  !

50-364 N N :o CD c")  !

i , <

LU. S. . Nuclear Regulatory Commi ssion

' ATTN:,Occument Control! Desk

> $ i

y p .

' Washington, D. C. 20555 ,

7 Gentlemen:

Joseph M. Farley Nuclear P.lant - Units 1 and 2 Steam Generator Tube Plugging Limit j Technical Specification Change l l

By letter dated June 2,1987, Alabama Power Company submitted .a proposed technical specification change that would increase the steam generator tube

. plugging limit to 10 percent. Several questions were raised by the NRC

.concerning this license amendment request and were subsequently addressed by ,

Alabama Power. Company letters ~ dated August 18 and September 16, 1987. In i the September 16 letter, Alabama Power Company made reference to an l evaluation performed by Westinghouse for plant Almaraz Units 1 and 2 in l which Westinghouse stated that no effect would be expected in the small ,

break.LOCA analysis for certain plugging levels. The NRC requested in l subsequent conversations that this report be made available to them. The i evaluation WENX-86-12, March 1986 entitled, "An Evaluation of Up to 10% l Steam Generator Tube Plugging on CN Almaraz Units 1 and 2," has been i

" provided .to the NRC by Westinghouse letter dated September 22, 1987. I i

If there are any further questions, please advise, i Respectf ully , ubmitted, 8709290188 870923 PDR ADOCK 05000348'- <

) '

/

/

P PDR f:/  !

R. P. Mcdonald j RPM /BHW: dst-D-T.S.7 cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford

\

\%

8

_ ':_____-_-._-__.--_______ _ __ .__