Letter Sequence Other |
|---|
|
|
MONTHYEARML20209D0391986-06-30030 June 1986 Demonstration of Conformance of Jm Farley Units to App K & 10CFR50.46 for Large Break Locas Project stage: Other ML20209D0261986-08-25025 August 1986 Proposed Tech Specs,Increasing Steam Generator Tube Plugging Limit to 10% & Changing Heat Flux Hot Channel Factor Limit Project stage: Other ML20209D0011986-08-25025 August 1986 Application for Amends to Licenses NPF-2 & NPF-8,changing Tech Specs to Increase Steam Generator Tube Plugging Limit to 10% & Heat Flux Hot Channel Factor Limit.Fee Paid Project stage: Request ND-86-0018, Forwards Responses to Questions Re Util 860825 Tech Spec Change Request Concerning Steam Generator Tube Plugging1986-10-13013 October 1986 Forwards Responses to Questions Re Util 860825 Tech Spec Change Request Concerning Steam Generator Tube Plugging Project stage: Other IR 05000348/19860211986-11-13013 November 1986 Insp Repts 50-348/86-21 & 50-364/86-21 on 861016-20.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp Program Review,Procedures Review,Observations of Work Activities & Nonwelding & Welding Activities for Piping Project stage: Request ML20214S2331987-02-28028 February 1987 Demonstration of Conformance of Jm Farley Units 1 & 2 to App K & 10CFR50.46 for Large Break Loca Project stage: Other ML20214S2101987-06-0202 June 1987 Proposed Tech Specs,Increasing Steam Generator Tube Plugging Limit to 10% & Incresing Fq Coefficient to 2.32 for Greater than 50% & to 4.64 for Less than or Equal to 50% Rated Thermal Power Project stage: Other ML20214S1791987-06-0202 June 1987 Resubmits Application for Amends to Licenses NPF-2 & NPF-8, Increasing Steam Generator Tube Plugging Limit to 10% & Increasing Fq Coeficient to 2.32 for Greater than 50% & 4.64 for Less than or Equal to 50% Rated Thermal Power Project stage: Request ML20237G1781987-08-18018 August 1987 Forwards Response to NRC Questions Re Util 870602 Proposed Steam Generator Tube Plugging Limit & Heat Flux Hot Channel Factor Tech Spec Changes Project stage: Other ML20234C5351987-09-16016 September 1987 Forwards Supplemental Response to NRC 870910 Request for Further Clarification of Util 870818 Response to NRC Questions Re Util Proposed Tech Spec Change to Increase Steam Generator Tube Plugging Limit to 10% Project stage: Supplement ML20235V4511987-09-22022 September 1987 Insp Repts 50-348/87-20 & 50-364/87-20 on 870908-11.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Radiological Emergency Preparedness Exercise.Concerns Re Challenge of Exercise Noted Project stage: Request ML20235F5431987-09-23023 September 1987 Advises That WENX-86-12, Evaluation of Up to 10% Steam Generator Tube Plugging on CN Almaraz Units 1 & 2, Provided on 870922 in Response to Questions Re 870602 Proposed Tech Spec Change Increasing Steam Generator Tube Plugging Limit Project stage: Other ML20236F1691987-10-26026 October 1987 Amends 73 & 65 to Licenses NPF-2 & NPF-8,respectively, Changing Tech Specs to Increase Steam Generator Tube Plugging from 5% to 10% & to Increase Slightly Increase Heat Flux Hot Channel Factor Coefficient Project stage: Other ML20236F1871987-10-26026 October 1987 Safety Evaluation Supporting Amends 73 & 65 to Licenses NPF-2 & NPF-8,respectively Project stage: Approval 1987-02-28
[Table View] |
Text
hp g
b Abbama Power Company lt
' 600 North 18th Street
. Post Office Box 2641 l.
' Telephone 205 250-1835
/'
Birmingham, Alabama 35291-0400 F
m R. P. Mcdonald.
Alabama Power-1 i;
Senior Vice President the southern electrc t,$lern 10CFR50.g.:
1 September 23, 1987
'I Doi.ket.' %, 348 gt c:
50-364 N $
N :o CD c")
i LU. S.. Nuclear Regulatory Commi ssion i
y
' ATTN:,Occument Control! Desk p
' Washington, D. C. 20555 7
Gentlemen:
Joseph M. Farley Nuclear P.lant - Units 1 and 2 Steam Generator Tube Plugging Limit j
Technical Specification Change l
l By letter dated June 2,1987, Alabama Power Company submitted.a proposed technical specification change that would increase the steam generator tube
. plugging limit to 10 percent. Several questions were raised by the NRC
.concerning this license amendment request and were subsequently addressed by Alabama Power. Company letters ~ dated August 18 and September 16, 1987.
In i
the September 16 letter, Alabama Power Company made reference to an l
evaluation performed by Westinghouse for plant Almaraz Units 1 and 2 in l
which Westinghouse stated that no effect would be expected in the small break.LOCA analysis for certain plugging levels. The NRC requested in l
subsequent conversations that this report be made available to them. The i
evaluation WENX-86-12, March 1986 entitled, "An Evaluation of Up to 10%
l Steam Generator Tube Plugging on CN Almaraz Units 1 and 2,"
has been i
provided.to the NRC by Westinghouse letter dated September 22, 1987.
I i
If there are any further questions, please advise, i
- ubmitted, Respectf ully,
8709290188 870923
)
/'
PDR ADOCK 05000348'-
/
f:/
P PDR R. P. Mcdonald j
RPM /BHW: dst-D-T.S.7 cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford
\\
\\%
8
__.__