ML20235F738

From kanterella
Revision as of 17:31, 27 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Davis-Besse Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Sys Satisfies Requirements of NUREG-0654/FEMA-REP-1,Rev 1 & FEMA-43
ML20235F738
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/14/1987
From: Mcloughlin D
Federal Emergency Management Agency
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20235F740 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8709290299
Download: ML20235F738 (1)


Text

-_

U1urley-Letter only: Stello e u4 Taylor Rehm

' g%?\ Federal Emergency lWnaigement Agency 1 5 Murray Washington, D.C. 20472 i # Jordan A.Bert Davis SEP l 41987 Mr. Victor Stello, Jr.

Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stello:

The Federal Emergency Management Agency (FEMA) has completed an analysis of the prompt alert and notification system for the Davis 4 esse Nuclear Power Station located in Oak Harbor, Ohio. 'Ihis review has been completed pursuant to Title 44 CFR, Part 350; selected evaluative criteria and Appendix 3 in NUREG-0654gEMA-REP-1, Revision 1; and FEMA-43, the " Standard Guide for the Evaluation of Alert and Notification Systems for Nuclear Pwer Plants" (nw published as FEMA-REP-10).

The enclosed report, entitled " Davis-Besse Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedness Alert and Notification System Quality Assurance Verification" sunmarizes the engineering design review; incorporates the results of the pub ic telephone survey conducted immediately following full activation of the alert and notification system on May 21, 1985; and confirms the adequacy of the applicable evaluative criteria frcn NUREG-0654gEMA-REP-1, l Revision 1, and FEMA-43.

l Based on the engineering design review and the results of the public telephone survey, FEMA has deterinined that the alert and notification system installed around the Davis-Besse Nuclear Power Station satisfies the requirements of NUREG-0654g EMA-REP-1, Revision 1, and FEMA-43. Therefore, there is nw l teasonable assurance that the system is adequate to promptly alert and notify

! the public in the event of a radiological energency at the site. A full review of the offsite plans and preparedness site-specific to the Davis 4 esse Nuclear Pcuer Station will be ccrnpleted by PEMA at a later date.

Sincerely, L

Dave McLoughlin Deputy Associate Director State and Local Programs and Support Enclosure h9290299e7o934 p ADOCK 05000346 PDR