ML20235F738
| ML20235F738 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/14/1987 |
| From: | Mcloughlin D Federal Emergency Management Agency |
| To: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| Shared Package | |
| ML20235F740 | List: |
| References | |
| RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8709290299 | |
| Download: ML20235F738 (1) | |
Text
-_
U1urley-Letter only: Stello e u4 Taylor
' g%?\\ Federal Emergency lWnaigement Agency Rehm 1
5 Washington, D.C. 20472 Murray i
Jordan A.Bert Davis SEP l 41987 Mr. Victor Stello, Jr.
Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stello:
The Federal Emergency Management Agency (FEMA) has completed an analysis of the prompt alert and notification system for the Davis 4 esse Nuclear Power Station located in Oak Harbor, Ohio. 'Ihis review has been completed pursuant to Title 44 CFR, Part 350; selected evaluative criteria and Appendix 3 in NUREG-0654gEMA-REP-1, Revision 1; and FEMA-43, the " Standard Guide for the Evaluation of Alert and Notification Systems for Nuclear Pwer Plants" (nw published as FEMA-REP-10).
The enclosed report, entitled " Davis-Besse Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedness Alert and Notification System Quality Assurance Verification" sunmarizes the engineering design review; incorporates the results of the pub ic telephone survey conducted immediately following full activation of the alert and notification system on May 21, 1985; and confirms the adequacy of the applicable evaluative criteria frcn NUREG-0654gEMA-REP-1, l
Revision 1, and FEMA-43.
l Based on the engineering design review and the results of the public telephone survey, FEMA has deterinined that the alert and notification system installed around the Davis-Besse Nuclear Power Station satisfies the requirements of NUREG-0654g EMA-REP-1, Revision 1, and FEMA-43. Therefore, there is nw l
teasonable assurance that the system is adequate to promptly alert and notify the public in the event of a radiological energency at the site. A full review of the offsite plans and preparedness site-specific to the Davis 4 esse Nuclear Pcuer Station will be ccrnpleted by PEMA at a later date.
Sincerely, L
Dave McLoughlin Deputy Associate Director State and Local Programs and Support Enclosure h9290299e7o934 p
ADOCK 05000346 PDR q
u.
Y~3D
'\\
o _ -_ _ _
J