Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20081D3031994-08-11011 August 1994 Rev 2 to SEI-27, ISI & Test Program ML20116K2341993-09-26026 September 1993 ISI Program Plan for 1993-2003 Interval ML20104A8291992-09-0303 September 1992 Rev 5 to Surveillance Test Procedure SS-ST-SI-3015, Safety Injection Tank Discharge Check Valves Test ML20099B9621992-07-29029 July 1992 Cycle 14 Low Power Physics & Power Ascension Test Program ML20056C4291992-06-0505 June 1992 Rev 1 to Surveillance Test Procedure IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X ML20056C4301992-06-0505 June 1992 Rev 1 to Surveillance Test Procedure IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 ML20097B1921992-05-18018 May 1992 Draft Chemistry Manual Procedure CMP-6 ML20097B2021991-11-27027 November 1991 Draft Rev 1 to Radioactive Matls Control Procedure RW-200, Process Control Program ML20094N4551991-08-13013 August 1991 Rev 2 to C-E Rept 602977-MPS-5EFPR-002, Test Procedure Guideline for Out-of-Plant Testing of PORV Block Valves at Fort Calhoun Station Omaha Public Power District ML20059N5991990-10-0101 October 1990 Rev 5 to Fort Calhoun Station 1,Inservice Insp Program Plan for 1983-1993 Interval ML20042G9731990-02-21021 February 1990 Standing Order Procedure S.O.-M-10, Tool Accountability. ML20044A8041989-09-15015 September 1989 Rev 8 to Standing Order Procedure SO-G-70, Chemical Control. ML20236D0761988-07-0808 July 1988 Production Engineering Div Procedure QP-3, Calculation Preparation,Review & Approval ML20151L1841988-07-0101 July 1988 Inservice Insp Program Plan for 1983-93 Interval ML20236D0841988-06-30030 June 1988 Gse Design Procedure B-9, Technical Calculation Production Checking & Approval ML20236D0871988-05-31031 May 1988 Generating Station Engineering Administrative Procedure A-11, Calculation Completion & Control ML20196L4361988-04-30030 April 1988 Rev 4 to Administrative Procedure A-5, Procurement of Matl & Labor ML20196L4471988-02-29029 February 1988 Rev 2 to Design Procedure B-7, Evaluation of Bids ML20237C0291987-12-31031 December 1987 Rev 3 to Fort Calhoun Station,Unit 1,Inservice Insp Program Plan for 1983-1993 Interval ML20236D0911987-11-30030 November 1987 Generating Station Engineering Design Procedure B-10, Multidisciplinary Design Review ML20236H1821987-10-21021 October 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 11 to EPIP-OSC-14, Shift Supervisor/Site Director Actions & Rev 6 to EPIP-OSC-15, Control Room Communicator ML20237J9701987-08-0303 August 1987 Public Version of Revs to Emergency Plan Implementing Procedures,Including Rev 13 to EPIP-OSC-2-1, Emergency Plan Activation & Notifications & Rev 6 to EPIP-PI-1-34, Personal Respiratory Protections ML20236M2871987-07-31031 July 1987 Annual Exercise Jul 1987 ML20196L4431987-06-30030 June 1987 Rev 6 to Design Procedure B-5, Control of Matl & Equipment for Gse Engineered Mods at Fort Calhoun Station ML20215E6991987-06-0404 June 1987 Public Version of Emergency Plan Implementing Procedures, Including Rev 12 to EPIP-OSC-2-1, Emergency Plan Activation & Notifications & Rev 5 to EPIP-OSC-15-1, Control Room Communication ML20215J2091987-04-21021 April 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EPIP-OSC-14, Shift Supervisor/Site Director Actions & Rev 9 to EPIP-EOF-18, Offsite Radiological Surveys ML20215H8491987-04-16016 April 1987 Public Version of Revs to Emergency Plan Implementing Procedures,Including Rev 10 to EPIP-OSC-2, Emergency Plan Activation & Notifications & EPIP-EOF-17, Initiation of Public Warning ML20209A7511987-03-19019 March 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EPIP-RR-7, Recovery Decontamination & Rev 5 to EPIP-PI-1, Public Info (Crisis Communication Plan). W/870423 Release Memo ML20205B8881987-03-17017 March 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to EPIP-OSC-16, Emergency Team, Rev 10 to EPIP-EOF-6, Onsite/Offsite Dose Assessment & Rev 3 to EPIP-TSC-8, Emergency Core Damage ML20210D2571987-01-19019 January 1987 Public Version of Emergency Plan Implementing Procedures, Including EPIP-OSC-8-1, Medical Assistance. EPIP-RR-9-1, Reentry & Recovery Equipment..., EPIP-RR-77-1, Call List Caller & EPIP-RR-12-1, Emergency Recovery.. ML20207E7991986-12-15015 December 1986 Public Version of Emergency Plan Implementing Procedures, Including EPIP-RR-19, Emergency Recovery Organization Operations Support Manager & EPIP-RR-26, Emergency Recovery Organization Environ Survey & Analysis Supervisor ML20214U2281986-09-0808 September 1986 Public Version of Emergency Plan Implementing Procedures EPIP-OSC-14, Shift Supervisor/Site Director Actions, EPIP-OSC-15, Control Room Communicator & EPIP-OSC-16, Emergency Team ML20206H7061986-05-30030 May 1986 Public Version of Revs to Emergency Plan Implementing Procedures,Including EPIP-OSC-3-1, Notification of Unusual Event Actions & EPIP-OSC-4-1, Alert Event Actions. W/860623 Release Memo ML20154H8121986-02-17017 February 1986 Public Version of Revised Emergency Plan Implementng Procedures,Including Revised Table of Contents & Rev 4 to EPIP-EOF-7 Re Protective Action Guidelines ML20129F0341985-06-13013 June 1985 Public Version of Rev 2 to Emergency Plan Implementing Procedure EPIP-OSC-12, Accidental Actuation of Early Warning Siren Sys ML20102C4141985-03-0101 March 1985 Procedures Generation Package ML20106D4051984-08-31031 August 1984 Offsite Dose Calculation Manual ML20112C2401984-08-31031 August 1984 Revised Pages to Offsite Dose Calculation Manual,Fort Calhoun Station Unit 1 ML20087L5351984-03-19019 March 1984 Revised Pages to Inservice Insp Program Submitted 830926 1997-09-21
[Table view] |