ATTACHMENT 2 PED Quality Procedure QP-3 Calculation Preparation, Review and Approval p
I 1
l l
l l
l 8903220449 890315 PDR ADOCK 05000285 t _ f_ _ _ _ ____ PDC _____ __ _ _ _ _
_ _ ~
~ _..
v
._........,3,1 s_
y, 1
g.
' OMAHA PUBLIC POWER DISTRIC'T T4[h' "4
PRODUCTION ENGINEERING DIVISION ENGINEERING MANUAL Document: PED Ouality Procedure OP-3 Title :
Calculation Preparation. Review, and Aegroval Revision: rorereng Date: L.1 -88 i
l
/b$ U f % /- W
,u M l
Preph'rer Independent Reviewer i
i
/-rmnLA, 6IvM
/ $ 2 Y $ b W 7AA Manager '- PED trical'/Date Manager - PED Mechanical /Date
~
~
7ld
%W 1 ss d'
A fianager - PED Nuclear /Date Ma er - T U Civil /Date
//
~
I I
s.a c A ;a n u.a xe Manager - FED Engineering /Date Manager - PED Nuclear Design /Date j
fy,.,..
SVrvices
/h )&
f ($xW 2k/d, R,$.
'I'IB6 Manager - PED Station /Date Kanager - PED Production Design /Date a Engineering
$N/Wn 7///PP AI4
$dd 1/7lf Manjpfer - PED Nuclear Projects /Date Manager-PEfAdministrativp/Date~~
Services 1 t*
Divisfon Manager - PED QP-3.1 (3 total pages) l 1
i
uar:
- rm. -emax. ;;.m :
,.a ;w.., t. -
3, ;, ---- - g,g,_-
,, g,.;;;.7 ;-- gy, ; -;------- --
4 j
.,N%
f
[e 'g4gd t
o /'
Record of Revisions l
Document Number:
Title:
Calculation Preparation. Review, and Approval a
Revision I
Description of Revision i Prepared By Interim Initial Release ri r c o n e e r 1
J
.a QP-3.2 a
i
y -,. --
-- - ~ -.n.,
n.a..sawwwaamm.-a :
)
f.
i PED Quality-Procedure
{,
'lgp QP-3 l
Calculation Preparation. Rtview'& Acoroval l
1.0 Puroose 1-l This procedure establishes the requirements and responsibilities for this preparation, review and approval of all calculations prepared by PED.
This procedure adopts and modifies existing GSE procedures A-ll and B-9 as interim procedures to be followed-while a unique PED procedure is developed.
2.0 References 2.1 GSE Administrative Procedure A-ll, Revision 5/88 2.2 GSE Design Procedure B-9, Revision 3/87 3.0 Responsibilities The responsibilities as delineated in the above noted procedures apply as written..
All references to GSE & GSE pos-ition titles should be interpreted as meaning PED and the corresponding PED position title.
4.0 General Requirements - Not Applicable q.
,rg 5.0 Instructions All PED calculations shall meet the requirements of existing GSE Procedures A-11 and B-9 as referenced above with the following modifications:
5.1 Reference to Form B-2-2 in Paragraph 2.4 of Procedure B-9 should be modified to reference Form A-11-1.
5.2 Calculations prepared to support modification design packages are to receive an independent design verification inconjunction with the design package utilizing PED QP-ll.
Calculations prepared as part of a study can receive an independent design verification utilizing a modified MOR in accordance with PED QP-11.
Rev. Interim Date:
07-01-88 QP-3.3 m
%)$
4 I
_ _ - _ _