ML20236D076

From kanterella
Jump to navigation Jump to search
Production Engineering Div Procedure QP-3, Calculation Preparation,Review & Approval
ML20236D076
Person / Time
Site: Fort Calhoun 
Issue date: 07/08/1988
From: Livingston B
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20236D071 List:
References
QP-3.1, NUDOCS 8903220449
Download: ML20236D076 (4)


Text

. _ _ _ _ _ _ _ _ _ - _.. -.

  1. 9 i

P i

ATTACHMENT 2 PED Quality Procedure QP-3 Calculation Preparation, Review and Approval p

I 1

l l

l l

l 8903220449 890315 PDR ADOCK 05000285 t _ f_ _ _ _ ____ PDC _____ __ _ _ _ _

_ _ ~

~ _..

v

._........,3,1 s_

y, 1

g.

' OMAHA PUBLIC POWER DISTRIC'T T4[h' "4

PRODUCTION ENGINEERING DIVISION ENGINEERING MANUAL Document: PED Ouality Procedure OP-3 Title :

Calculation Preparation. Review, and Aegroval Revision: rorereng Date: L.1 -88 i

l

/b$ U f % /- W

,u M l

Preph'rer Independent Reviewer i

i

/-rmnLA, 6IvM

/ $ 2 Y $ b W 7AA Manager '- PED trical'/Date Manager - PED Mechanical /Date

~

~

7ld

%W 1 ss d'

A fianager - PED Nuclear /Date Ma er - T U Civil /Date

//

~

I I

s.a c A ;a n u.a xe Manager - FED Engineering /Date Manager - PED Nuclear Design /Date j

fy,.,..

SVrvices

/h )&

f ($xW 2k/d, R,$.

'I'IB6 Manager - PED Station /Date Kanager - PED Production Design /Date a Engineering

$N/Wn 7///PP AI4

$dd 1/7lf Manjpfer - PED Nuclear Projects /Date Manager-PEfAdministrativp/Date~~

Services 1 t*

Divisfon Manager - PED QP-3.1 (3 total pages) l 1

i

uar:

- rm. -emax. ;;.m :

,.a ;w.., t. -

3, ;, ---- - g,g,_-

,, g,.;;;.7 ;-- gy, ; -;------- --

4 j

.,N%

f

[e 'g4gd t

o /'

Record of Revisions l

Document Number:

OP-3

Title:

Calculation Preparation. Review, and Approval a

Revision I

Description of Revision i Prepared By Interim Initial Release ri r c o n e e r 1

J

.a QP-3.2 a

i

y -,. --

-- - ~ -.n.,

n.a..sawwwaamm.-a :

)

f.

i PED Quality-Procedure

{,

'lgp QP-3 l

Calculation Preparation. Rtview'& Acoroval l

1.0 Puroose 1-l This procedure establishes the requirements and responsibilities for this preparation, review and approval of all calculations prepared by PED.

This procedure adopts and modifies existing GSE procedures A-ll and B-9 as interim procedures to be followed-while a unique PED procedure is developed.

2.0 References 2.1 GSE Administrative Procedure A-ll, Revision 5/88 2.2 GSE Design Procedure B-9, Revision 3/87 3.0 Responsibilities The responsibilities as delineated in the above noted procedures apply as written..

All references to GSE & GSE pos-ition titles should be interpreted as meaning PED and the corresponding PED position title.

4.0 General Requirements - Not Applicable q.

,rg 5.0 Instructions All PED calculations shall meet the requirements of existing GSE Procedures A-11 and B-9 as referenced above with the following modifications:

5.1 Reference to Form B-2-2 in Paragraph 2.4 of Procedure B-9 should be modified to reference Form A-11-1.

5.2 Calculations prepared to support modification design packages are to receive an independent design verification inconjunction with the design package utilizing PED QP-ll.

Calculations prepared as part of a study can receive an independent design verification utilizing a modified MOR in accordance with PED QP-11.

Rev. Interim Date:

07-01-88 QP-3.3 m

%)$

4 I

_ _ - _ _