I 1
FORT CALHOUN STATION UNIT NO.
1 PROCEDURES GENERATION PACKAGE I
l l
l l
l I
8503060335 850301ADOCK 05000285 l
PDR PDR F
l
.n. _,,_ _, _,,...., -, _ _... _ _. _ _ _ _,,, _.,.. _ ~,. _. _. _,,, _ - -.,.,. _,, _.., - _ _.
PROCEDURES GENERATION PACKAGE Table of Contents Total Pages Part 1 INTRODUCTION.................
7 Part 2 PLANT SPECIFIC TECHNICAL GUIDELINES......
5 Part 3 E0P WRITERS GUIDE'...............
45 Part 4 E0P VERIFICATION PROGRAM...........
28 Part 5 E0P VALIDATION PROGRAM............
33 s
Part 6 E0P TRAINING PROGRAM.............
6
6 G
PROCEDURES GENERATION PACKAGE PART 1 INTRODUCTION e",
e
PROCEDURES GENERATION PACKAGE INTRODUCTION
1.0 INTRODUCTION
1.1 Purpose The purpose of this Procedures Generation package (PGP) is to provide a description of the process used to upgrade the Emergency Operating Procedures (E0P's) at the Fort Calhoun Station Unit No.
1.
This process incorporates Plant-Specific Technical Guidelines, Writers Guide, Verification Program, Validation Program, and Training Program.
1.2 Scope The E0P upgrade process is documented in response to Item 7.2.b.
Supplement 1 of NUREG-0737, " Requirements for Emergency Response Capability," as contained in the Commission's confirmatory letter from Mr. James R. Miller to W. C. Jones dated February 22, 1984.
The guidance presented in NUREG-0899, "Guicelines for the Prepara-tion of Emergency Operating Procedures, " was used in developing the upgrade process. NUREG-0899 also provides guidance on the recommendations of NUREG-0737, Item I.C.1 " Emergency Operating Procedures." In addition INP0 Guidelines82-013, 82-016,82-017, 83-004,83-006, and 83-007 were utilized in the development of the Procedures Generation Package. -_ _
PROCEDURES GENERATION PACKAGE INTRODUCTION
1.0 INTRODUCTION
1.1 Purpose The purpose of this Procedures Generation package (PGP) is to provide a description of the process used to upgrade the Emergency Operating Procedures (E0P's) at the Fort Calhoun Station Unit No.
1.
This process incorporates Plant-Specific Technical Guidelines, Writers Guide, Verification Program, Validation Program, and Training Program.
1.2 Scope The E0P upgrade proces: is documented in response to Item 7.2.b, Supplement 1 of NUREG-0737, " Requirements for Emergency Response Capability," as contained in the Commission's confirmatory letter from Mr. James R. Miller to W. C. Jones dated February 22, 1984.
The guidance presented in NUREG-0899, " Guidelines for the Prepara-tion of Emergency Operating Procedures, " was used in developing the upgrade process. NUREG-0899 also provides guidance on the recommendations of NUREG-0737, Item I.C.1 " Emergency Oper ' ting Procedures." In addition INP0 Guidelines82-013, 82-016,82-017, 83-004,83-006, and 83-007 were utilized in the development of the Procedures Generation Package..
The parts of this package dealing with the Plant-Specific Technical Guidelines, E0P Writers Guide, E0P Verification Program, E0P Validation Program, and E0P Training Program are written as autono-mous sections. The various PGP parts may be revised prior to incorporation into the Nuclear Production Division procedure network. This revision process would not alter or diminish the integrity of the development process but would incorporate lessons learned in the execution of the upgrade program.
1.3 Background
Following the accident at Three Mile Island (TMI), NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short Term Recommendations" was issued. The Combustion Engineering Owners Group (CE0G) developed CEN-128, " Response of Combustion Engineering Nuclear Supply System to Transients and Accidents" using best estimate analysis techniques.
The guidance of NUREG-0578 was integrated into and expanded by NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." NUREG-0737, " Clarification of TMI Action Plan Require-ments", was issued to improve the recommendations of NUREG-0660.
Item I.C.1 of NUREG-0737 recommends that the events analyzed for E0P's include multiple failures, that guidelines be prepared to conTr.unicate designer information to the procedure writers, and that E0P's include function oriented procedures as well as event orient-ed procedures. __
Omaha Public Power District personnel have been actively partici-pating for several years in the CEOG program to develop generic Emergency Procedure Guidelines (EPG's). The generic EPG's were submitted to the NRC in a report entitled, " Combustion Engineering Emergency Procedure Guidelines," CEN-152, Revision 01, dated November 22, 1982. CEN-152, Revision 02 was submitted to the NRC on May 8, 1984 and will be used as the basis for the Fort Calhoun Station Unit No. 1 upgraded E0P's. This report contains the revised version of the EPG's, a description of the guideline characteristics and features, the methodology used to develop and validate the guidelines, and information on plant-specific imple-mentation. The NRC has not officially accepted the revised CE0G EPG's for implementation in plant-specific E0P's at the time of this submittal. NRC acceptance of CEN-152, Revision 02 is expected in the near future along with a safety evaluation report identi-fying technical and administrative issues requiring future resolu-tion.
In response to Item I.C.1 of NUREG-0737, as clarified in Supplement 1 and as required in Item 7.2.b this Procedures Generation Package is submitted.
Implementation of the first set of E0P's as describ-ed in this package is scheduled to be complete prior tu the Cycle 10 startup.
2.0 UPGRADE PROCESS This section provides a summary of the program for upgrading Emergency Operating Procedures at Fort Calhoun Station Unit No. I based on the Combustion Engineering Owners Group Emergency Procedure Guidelines.
2.1 Procedure Network E0P's are only one of the many types of procedures within the plant's procedure network. This network is considered by the E0P project team during the upgrade process to ensure consistency between E0P's and other plant procedures. When necessary, changes to existing plant procedures are processed as part of this program.
To distinguish E0P's from other plant procedures, an emergency is defined as an incident severe enough to necessitate a reactor trip
- either automatically or manually initiated. Events which are more serious than normal transients but not severe enough to require a reactor trip or for which the reactor is already shut-down, shall be included in a new set of procedures called Abnormal Operating Procedures (A0P's). This procedure set will contain many procedures which were previously designated as emergency proce-dures.
Emergency events can be divided into two types.
For the first type, the operator can determine the general type of event by diagnosing its symptom set from control room indications, knowledge of the plant, and recent operating history.
For events where a diagnosis is possible, guidance has been developed and sequenced to effectively mitigate that symptom set (e.g., LOCA, steam generator tube rupture). Since these types of events have been well analyzed and understood, it is possible to write emergency procedures to optimize the recovery (i.e., minimize release of radiation, reduce risk of core damage).
4
In the second type of emergency, the operator is urable to diagnose a specific symptom set. This may be due to errors in symptom assessment by the operator, multiple failures in the plant, the occurrence of an event not previously analyzed, instrumentation failures, or a combination of the aforementioned.
For these events, guidance has been developed which is based upon the satis-fying of safety functions (e.g., RCS inventory control, RCS pres-sure control) and not on recovery from a specific symptom set.
Emergency Operating Procedures (E0P's) provide guidance for both types of emergencies. Therefor, af ter a reactor trip, the operator can refer to a procedure which will provide correct, safe guidance regardless of whether a specific symptom set is identified. E0P's written to treat specific symptom sets are called Optimal Recovery Procedures. The E0P which provides guidance for undiagnosed events is called the Functional Recovery Procedure. The following list identifies the Fort Calhoun Station network of E0P's:
Electrical Emergency E0P-03:
Loss of Coolant Accident E0P-04:
Steam Generator Tube Rupture E0P-05:
Uncontrolled Heat Extraction E0P-06:
Functional Recovery The Reactor Trip Immediate Actions, located in E0P-01, are per-formed follnwing all reactor trips to evaluate the status of critical safety functions and provide contingency actions to improve the status of those safety functions in jeopardy. The Reactor Trip Immediate Actions provide a secondary function in that while evaluating the status of safety functions, elements of event -
}
i diagnosis are also in progress.
Following the Reactor Trip Immedi-ate Actions, further diagnostic actions occur, if necessary, in which the operator attempts to identify a specific symptom set corresponding to the event in progress.
If the diagnosis of one event can be made then that optimal recovery E0P is implemented.
If the diagnosis of the event is not possible then the functional recovery E0P is implemented. A check of the status of each safety functica continues to be performed on a regular time interval when entering any other E0P from E0P-01.
2.2 Process Description The upgrading of E0P's is a process consisting of several steps.
The process steps are: (1) preparation of a plant-specific writers guide and development of plant-specific technical guidelines, (2) procedure writing and verification, (3) procedure validation, (4) training of the operators, and (5) implementation of the upgraded E0P's. The process elements taken collectively are a description of the methods used to convert the generic CEOG EPG's to Fort Calhoun Station Unit No. 1 E0P's. These elements are described more fully in this PGP.
The E0P writer must take a multitude of facets into account when generating E0P's. The CE0G EPG's and supporting information identify the plant objectives to be met, the systems required, the required level of performance, the required operator actions, and the strategy with which the actions are to be carried out. Addi-tional strategies, functions, tasks, and analyses are needed to prepare the E0P's.
Integration of the E0P process elements is based on operating experience, engineering, writing methods, shift staffing, plant design features, and operating characteristics.
While integrating the process elements, subsystem and component details are added to the E0P.
1 Finally, after the E0P's are written and verified, ths E0P's must be validated. Appropriate accident scenarios, including multiple failures, shall be developed to adequately test the E0P's and E0P -
operator interaction during emergency conditions.
Following successful validation, all o p rators will be trained on the upgraded E0P's prior to assip iment in the control room with the E0P's implemented.
I J
PROCEDURES GENERATION PACKAGE PART 2 PLANT - SPECIFIC TECHNICAL GUIDELINES 9
9 e
e b
k
_m._--._
_.r_,
Fort Calhoun Station Unit No. 1 Plant Specific Technical Guidelines E0PTG Rev. 00 Page 1 of 5
Fort Calhoun Station Plant Specific Technical Guidelines Table of Contents Section Page
1.0 INTRODUCTION
3 1.1 Purpose......................
3 1.2 Scope.......................
3 1.3 Applicability...................
3 2.0 PLANT SPECIFIC TECHNICAL GUIDELINES............
3 2.1 Source Documents..................
4 2.2 Draft E0P's....................
4 2.3 Final E0P's....................
5 E0PTG Rev. 00 Page 2 of 5 t
1.0 INTRODUCTION
1.1 Purpose This document provides the guidelines and the process for the development of the Fort Calhoun Station Unit No. 1 upgraded Emergency Operating Procedures (E0P's) and their revision.
1.2 Scope Because of the similarity between Fort Calhoun Station Unit No. 1 and the generic plant used for the Combustion Engineering Owner's Group (CEOG) Emergency Procedure Guidelines (EPG's), the generic guidelines incorporating plant specific source documents and engineering reviews will be used to upgrade the existing Fort Calhoun Station Emergency Procedures.
1.3 Applicability These guidelines apply to initial E0P implementation and subsequent revisions of the Fort Calhoun Station E0P's.
2.0 PLANT SPECIFIC TECHNICAL GUIDELINES This section describes the upgrade process that will be used to convert theCE0GEPG's(CEN-152,Rev.02)andothersourcedocumentsindicated below to the plant specific Technical Guidelines required by NUREG 0737, Supplement 1, item 7.2.b.(i).
The applicability of the EPG's to Fort Calhoun Station has been ensured through District participation in the CE0G workshops in which the philosophy, methodology, and technical content were developed.
In addi-tion, as part of the Detailed Control Room Design Review the EPG's were E0PTG Rev. 00 Page 3 of 5
]
verified and validated by the performance of a task analysis, an Information Control Characteristics Review, and Fort Calhoun Station control room walk-throughs.
2.1 Source Documents E0P writers will use the following source documents to prepare upgraded E0P's:
Fort Calhoun Station Unit No. 1 Writers Guide CE0G Emergency Procedure Guidelines (CEN-152, Rev.
02 for initial upgrade or most current revision for subsequentupgrades)
Fort Calhoun Station Unit No. 1 USAR Fort Calhoun Station Unit No. 1 Emergency Procedures (existing)
Fort Calhoun Station Unit No.1 Operating Procedures Fort Calhoun Station Unit No. 1 Administrative Procedures Fort Calhoun Station Unit No. 1 Radiological Emergency Response Plan and Emergency Plan Implementing Procedures As-built plant drawings Licensing commitment letters related to E0P's 2.2 Draft E0P's The E0P writer will review the source documents and then construct draft E0Ps using the following additional guidance; the Verification Program provides the means for documenting these steps.
E0PTG Rev. 00 Page 4 of 5
If it is determined that a generic step is com-patible with Fort Calhoun Station, then the step will be ccpied into the E0P's using the appropriate format instruction.
When a generic step requires a plant specific value, it will be determined and put into the E0P.
When a generic step indicates the need for plant-specific details, then the information will be added to the E0P's.
When the generic guidelines fail to address systems or actions that are unique to Fort Calhoun Station, then steps will be included to encompass the neces-sary actions.
If a generic step specifies an action that cannot be performed at Fort Calhoun Station, then the step will be deleted or modified.
Generic steps will be reworded to conform to Fort Calhoun Station standard terminology.
Generic steps may be rearranged to streamline the procedure provided the technical intent remains unchanged.
2.3 Final E0P's After the draft E0P's are prepared, verification and validation processes will be performed as described in the following sections.
At the conclusion of the verification and validation, the E0P's will be approved and implemented. Revisions will be processed as required in accordance with administrative control procedures.
Any deviation or addition to the CE0G EPG's which constitute an unreviewed safet.v question will be reviewed by the Plant Review Committee and the Safety Audit Review Committee and submitted to the NRC prior to implementation.
E0PTG Rev. 00 Page 5 of 5
e e
PROCEDURES GENERATION PACKAGE PART 3 E0P WRITERS GUIDE l
l
~.
+
1 i
l I
)
e
Fort Calhoun Station Unit No. 1 Emergency Operating Procedure Writers Guide i
E0PWG Rev. 00 l
Page 1 of 45
Fort Calhoun Station Emergency Operating Procedure Writers Guide Table of Contents Section Page
1.0 INTRODUCTION
6 1.1 Purpose......................
6 1.2 Scope.......................
6 2.0 E0P DESIGNATION AND NUMBERING...............
6 2.1 Procedure Cover Sheet...............
6 2.2 Title Page.....................
7 2.3 Procedure Designation...............
8 2.4 Procedure Numbering................
8 2.5 Procedure Revision htmbering............
8 2.6 Page Identification and Numbering.........
9 3.0 FORMAT...........................
9 3.1 Page Format....................
9 3.2 Procedure Organization...............
9 3.3 Section Numbering.................
11 3.4 Instruction Step Numbering.............
11 4.0 WRITING PROCEDURES.....................
12 4.1 Control Room Staffing & Division of Responsibilities..................
12 4.1.1 Consistency Between Staffing & Procedures.....
12 4.1.2 Division of Responsibility.............
12 4.1.3 Operator Interactions...............
13 4.2 General Instructions................
13 4.3 Writing Instruction Steps.............
15 4.3.1 Instructions and Contingency Actions........
15 E0PWG Rev. 00 Page 2 of 45
Table of Contents (Continued)
Section Page 4.4 Use of Logi c Te rms.................
16 4.5 Cautions and Notes.................
18 4.6 Calculations....................
19 4.7 Use of Underlining.................
19 4.8 Referencing and Branching To Other Procedures or Steps................ 20 4.9 Component Identification.............. 20 4.10 Level of Detail................
21 4.11 Printed Operator Aids............... 22 4.11.1 Uni ts of Mea sure.................. 22 4.11.2 Ti tles and Headings................ 23 4.11.3 Figure, Table, and Attachment Numbering...... 23 5.0 MECHANICS OF STYLE.....................
23 5.1 Spelling...................... 23 5.2 Hyphenation....................
24 5.3 Punctuation.................... 25 5.3.1 Brackets...................... 25 5.3.2 Colons....................... 25 5.3.3 Commas....................... 25 5.3.4 Parentheses.................... 26 5.3.5 Periods...................... 26 5.4 Vocabulary..................... 26 5.5 Numerical Values..................
27 5.6 Abbreviations, Letter Symbols, and Acronyms.... 28 5.7 Capitalization................... 28 E0PWG Rev. 00 Page 3 of 45
A i
i Table of Contents (Continued)
Section Page 6.0 TYPING FORMAT....................... 28 6.1 General Typing Instructions............ 28 6.2 Page Arrangement.................. 29 6.3 Heading and Text Arrangement..........
29 6.4 Breaking of Words................. 30 6.5 Rotation of Pages.................
30 6.6 Printed Operator Aids............... 31 6.7 Cautions and Notes................. 32 6.8 Use of Foldout Pages................
33 6.9 Use of Oversized Pages...............
33 6.10 Use of Reduced pages................ 33 7.0 REPRODUCTION........................ 33 E0PWG Rev. 00 Page 4 of 45
List of Figures Figure j
Number Page i
Example E0P Cover Sheet................ 34 Figure 1 Example E0P Title Page 35 Figure 2 Example E0P Entry Page 36 Figure 3 Example E0P Procedure Page 37 Figure 4 Example E0P Page Format.
38 Figure 5 List of Tables Table Number Acronyms and Abbreviations............... 39 Table 1 Preferred Verb List................... 43 Table 2 E0PWG Rev. 00 Page 5 of 45
1.0 INTRODUCTION
1.1 Purpose This document provides guidance for the preparation of new Emer-gency Operating Procedures (EOP's) and the revision of existing E0P's for Fort Calhoun Station Unit No. 1.
This guidance is provided to ensure that the information and guidance contained in the E0P's will be presented consistently in style and format. The administrative and technical guidance will ensure clarity of procedural steps and effective control room actions during emer-gency events.
1.2 Scope i.
6 This writers guide applies to the preparation, writing, and revision of all emergency operating procedures for Fort Calhoun Station Unit No. 1.
2.0 E0P DESIGNATION AND NUMBERING E0P's are distinguished from other plant procedures by their unique identification letters, numbers, and titles. Controlled copies of the E0P's shall be maintained in both the Control Room and at the Emergency Shutdown Panel to insure immediate access during emergencies.
2.1 Procedure Cover Sheet Each E0P will have a cover sheet that contains the following information (see Figure 1):
E0PWG Rev. 00 Page 6 of 45
A.
Identification E0P Title E0P Number Revision Number Total Number of Pages B.
Review Reviewer's Title Reviewer's Signature Date Signed Safety Question Evaluation C.
Approval PRC Meeting Date Plant Manager Signature Effective Date 2.2 Title Page Each E0P will have a title page that contains the following information (see Figure 2):
Procedure Title Procedure Number Effective revision number of each page Effective Revision Date Page 1 of E0PWG Rev. 00 Page 7 of 45
2.3 Procedure Designation The letters "E0P" will proceed the procedure number thus designa-ting the appropriate emergency operating procedure. See section 2.4 for numbering of procedures.
2.4 Procedure Numbering The following list identifies the Fort Calhoun Station network of emergency operating procedures:
Emergency Operating Procedures E0P-01: Reactor Trip E0P-02: Electrical Emergency E0P-03: Loss of Coolant Accident E0P-04: Steam Generator Tube Rupture E0P-05: Uncontrolled Heat Extraction E0P-06: Loss of Feedwater E0P-20: Functional Recovery 2.5 Procedure Revision Numbering 1.
The abbreviation "Rev." followed by the revision number will be on a separate line just below the procedure number.
When a revision is issued, the changes shall be identified by a solid vertical line in the right hand margin opposite the revised material.
E0PWG Rev. 00 Page 8 of 45
2.6 Page Identification and Numbering Each page of the procedure will be identified by; (1) the procedure designator and number, (2) the revision number, and (3) the page number specified as part of the total number of pages in the prot.edure (e.g., Page 12 of 26). This information will be located at the bottom of each page of the E0P, and centered within the body (border) of the procedure.
Procedure text shall be a minimum of three spaces above the procedure designator and number.
3.0 FORMAT The following information concerning procedure format is to be applied consistently to all E0P's.
3.1 Page Format Figure 1 provides a sample E0P cover sheet.
Figure 2 provides a sample title page.
Figure 3 provides a sample of an E0P entry page (Sections 1 and 2).
Figure 4 provides a sample procedure page (Section 3 with NOTE and CAUTION).
Figure 5 provides a sample of page layout.
3.2 Procedure Organization - Each E0P will have a Procedure Title followed by the below listed sections:
Section 1:
PURPOSE - the purpose section provides a brief statement of the condition (s) for which the subject E0P is intended to be used and defines what the procedure will accomplish.
E0PWG Rev. 00 Page 9 of 45
Section 2:
ENTRY CONDITIONS - the entry conditions section pro-vides the conditions for which that E0P should be imple-mented. This gives the operator a means of confirming that he has chosen the appropriate procedure for particular emergency conditions.
Section 3: OPERATOR ACTIONS - the operator actions are designed to mitigate the consequences of the event taking place and allow the operator to place the plant in a safe, stable condition. The only actions which are immediate and must be committed to memory are the Reactor Trip Immediate Actions.
The rest of the E0P's contain specific guidance dependent upon existing plant conditions after completion of the Reactor Trip Immediate Actions.
Instructions contained in this section shall be written in short, concise, and easily understood statements.
Instructions written in fragments, as opposed to complete sentences, provide the best use of space and allow for the clearest possible understanding.
Section 4:
PRINTED OPERATOR AIDS - this section of each E0P contains all of the figures and tables associated with that specific E0P.
Section 5:
SAFETY FUNCTION STATUS CHECK - the safety function status check is designed to continually verify that critical safety functions are being maintained. Evaluation of the plant parameters versus the acceptance criteria can help l
diagnose the event or can show what corrective actions should be taken to mitigate the consequences of the event.
E0PWG Rev. 00 Page 10 of 45
3.3 Section Numbering Section numbering is required to provide ease of identification of instructional steps in the procedure.
Figures 3 and 4 have been provided to show the desired section numbering system.
3.4 Instruction Step Numbering The following guidelines are established for instruction step numbering (for examples see Figures 4 and 5):
Instructional steps shall be numbered sequentially with the section number utilized as a prefix (e.g., 3.1, 3.2,...).
Contingency action steps shall be distinguished by an additional number following the prefixed section and instructional step numbers (e.g., 3.1.1, 3.2.1,...).
Limit the level of detail to 3 levels of steps below the general operator action or contingency action step.
Subordinate levels of detail alternate letter, number and lowercase Roman numerals.
Minimize indentation to give best use of space. Use for clarity only.
I l
l l
E0PWG Rev. 00 i
Page 11 of 45
4.0 WRITING PROCEDURES 4.1 Control Room Staffing and Division of Responsibilities This section considers staffing in the control room and the division of responsibility and leadership among the control room staff as it applies to the use of the E0P's. The following guidelines are important to the efficient and accurate development, and execution of the E0P's.
4.1.1 Consistency Between Staffing and Procedures The E0P's should be structured so that the number of people required to carry out specific actions, concurrent actions, and other responsibilities, does not exceed the minimum shift staffing required by Technical Specification 5.2.2.a.
4.1.2 Division of Responsibility The E0P's should be written such that the operator's roles are consistent with the preestablished leadership roles and division of responsibility currently utilized at Fort Calhoun Station.
E0PWG Rev. 00 Page 12 of 45
t l
4.1.3 Operator Interactions The following goals shall be considered when writing the E0P's:
Sequence action steps to minimize both physical conflicts between personnel and the amount of movement needed to carry out the steps.
Unintentional duplication of actions by control room personnel should be avoided.
4.2 General Instructions E0P's must be written with the level of detail sufficient to support the user's needs. This requires the assumption of a minimum kncwledge and experience level. This level is defined to be an operator that has recently received a reactor operator's license on Fort Calhoun Station Unit No. 1.
It is important to keep this in mind when determining the level of detail of proce-dural steps, cautions, notes, and figures.
Avoiding too much detail is important in order to minimize errors and allow for timely response during emergency conditions. The following general rules are to be followed:
Instruction steps should deal with only one idea.
Instruction steps in the form of sentence fragments are preferable to long, compound, or complex sentences.
Instruction steps shall be completed on a single page and not carried over to the next page unless unavoidable.
E0PWG Rev. 00 Page 13 of 45
Notes and cautions should be in simple but complete sentences.
Complex evolutions should be described in a series of steps with each step made as simple as possible.
Objects of operator actions should be specificall / stated.
This shall include identification of exactly what is to be done, to what, and what the acceptance criteria are.
Verification should be used where appropriate in the E0P's to ensure that equipment responses and operator actions have occurred and are correct.
The objects of instruction steps that involve an action verb relating to three or more objects will be listed with space provided for operator checkoff.
Limits should be expressed as number values whenever-possible (refer to Subsection 5.5).
Mandatory sequence of steps is assumed unless otherwise stated.
" Step (s) performed continuously" are steps to be implemented anytime conditions warrant and shall be designated by an asterisk to the left of the checkoff provision.
"* Step performed continuously" shall be located at the lower left-hand corner of the applicable pages.
Parts and components should be identified by common usage terminology.
E0PWG Rev. 00 Page 14 of 45
Expected results of routine tasks need not be stated.
When system response dictates a time frame within which the instruction must be act:omplished, prescribe such time frame by use of a Note.
If possible, avoid using time to initiate operator action. Operator actiuns should be related to plant parameters.
Use a Caution to describe conditions that may cause harm to personnel, damage to equipment, or that will introduce instrument error.
Instrumentation values shall be compatible with the ability to read the instrument.
Do not require mathematical calculations to convert units.
Use tolerance bands.
4.3 Writing Instruction Steps The E0P's shall be written in a single-column narrative format.
Figure 4 provides an example of the single column format.
4.3.1 Instructions and Contingency Actions Instructions shall be presented in the following manner (in addition to the general rules stated in section 4.1):
A check-off provision shall be provided to the left of each instructional step. This checkoff is also intended for use as a placekeeping aid.
E0PWG Rev. 00 Page 15 of 45
Begin each step with an action verb when logic terms are not required.
Include the location of the parameter or component being used in parenthesis if items are located in infrequently accessed, out-of-the-way places, or among arrays of items of similar appearance.
Contingency Actions (Equally Acceptable Steps) provide guidance to the operator for situations where the operator cannot perform the instructional step (e.g. a designated piece of equipment 's unavailable) or the results obtained do not fall within 'he range of expected values. These actions will most likely require the manual initiation of a system that is expe ted to operate automatically. Other actions may include-Reference to an 01/0P/A0P.
Reference to another E0P.
Reference to outside assistance from the TSC or E0F.
Continuing with the procedure.
4.4 Use of Logic Terms The logic terms AN9, OR, NOT, I_F, IF NOT, WHEN, and THEN are often necessary to precisely describe a set of conditions or a sequence of actions. When logic statements are used, logic terms will be highlighted so that all conditions are clear to the operator.
Highlighting shall be achieved by capitalizing all letters of the logic terms and underlining these terms.
E0PWG Rev. 00 Page _1_6 of _45
The use of AND and OR within the same action shall be avoided if possible. When AND and OR are used together, the logic can be very ambiguous.
Use the logic terms as follows:
When attention should be called to combinations of conditions, the word AND shall be placed between the description of each condition. The word AND shall not be used to join more than three conditions.
If four or more conditions need to be joined, a list format shall be used and the operator directed to perform them all.
The word OR shall be used when calling attention to alternative combinations of conditions. The use of the word OR shall always be in the inclusive sense. To specify the exclusive "0R", the following may be used:
"either A OR B but not both".
When action steps are contingent upon certain conditions or combinations of conditions, the step shall begin with the words E or WHEN followed by a description of the condition or conditions (the antecedent), a comma, the word THEN, followed by the action to be taken (the consequent). WHEN is used for an expected condition.
I F, is used for a possible condition.
Use of IF NOT should be limited to those cases in which the operator must respond to the second of two possible conditions. E should be used to specify the first condition.
E0PWG Rev. 00 Page 17 of 45
THEN shall not be used at the end of an action step to instruct the operator to perform the next step because it runs actions together, 4.5 Cautions and Notes Cautionary information can be considered in two fundamental cate-gories: those that apply to the entire procedure and those that apply to a portion or specific step of the procedure. Those that apply to the entire procedure are called " Precautions" and are covered in operator training. Those that apply to a specific portion of the procedure are called " Cautions" and are placed immediately before the procedural steps to which they apply.
Cautions are to extend across the entire page and shall be bordered top and bottom by a horizontal row of asterisks (see Figure 4).
This placement of cautions ensures that the procedure user observes the caution prior to performing the procedural step. A caution shall not be used instead of, instructional step and it cannot direct an action.
Cautions snould be used to denote a potential hazard to personnel or equipment associated with, or consequent to, the subsequent instructional step.
If additional information other than cautions is necessary to support an action instruction, a " Note" should be used. A " Note" should present information only, not instructions, and should be of compressed width in order to further differentiate it from text and cautionary statements (see Figure 4).
i E0PWG Rev. 00 Page 18 of 45
Specific rules for cautions and notes:
Never continue a caution or note from one page to the next.
Cautions are emphasized by their full page width, a horizontal row of asterisks top and bottom, and additional spacing top and bottom.
Notes are emphasized by their compressed width and additional spacing top and bottom.
If two or more cautions are written for the same procedural step or section, the horizontal row of asterisks is placed only below the last caution. The word CAUTION is written only before the first caution. The separate cautions will be identified by number.
The headings CAUTION and NOTE are always centered on the page, capitalized, and underlined.
4.6 Calculations Mathematical calculations should be avoided in E0P's.
If possible, a chart or graph should be used when a value has to be determined.
4.7 Use of Underlining Underlining will be used for emphasis, logic terms, cautions, notes, section headings, and column headings.
Use only where appropriate for required emphasis.
E0PWG Rev. 00 Page 19 of 45
4.8 Referencing and Branching to Other Procedures or Steps Referencing implies that an additional procedure or additional steps will be used as a supplement to the procedure presently being used. Use the key words " refer to".
The operator will know to use another source for additional information concurrent with the procedure in use.
Referencing other steps within the procedure being used, either future steps or completed steps, should be minimized because it causes confusion. When only a few steps are involved in the referencing, the steps should be stated in the procedure whenever they are needed.
To minimize the potential for cperator confusion, branching will be used when the operator is to leave one procedure or step and use another procedure or step. Use the key words "go to".
The opera-tor will know to leave the present step and not return until directed.
4.9 Component Identification With respect to the identification of components, the following rules are established:
Equipment, controls, and displays will be identified in common usage terms. These terms may not always match engraved names on panels but will be complete and sufficient.
When the engraved names and numbers of components are specifically used, the engraving should be quoted verbatim and enclosed in quotation marks.
E0PWG Rev. 00 Page 20 of 45
If the component is seldom used or it is felt the component would be difficult to find, location information should be given in parenthesis.
4.10 Level of Detail Too much detail in E0P's should be avoided in the interest of readability and comprehension. Avoiding too much detail is important in order to minimize errors and to allow for timely response during emergency conditions. The level of detail required is for that of an operator who has recently received a Reactor Operator's license on Fort Calhoun Station Unit No. 1.
To assist in determining the appropriate level of detail in the E0P's, the following general rules apply:
For control circuitry that executes an entire function upon actuation of the control switch, the action verb appropriate to the component suffices without further amplification of how to manipulate the control device. Example: Trip generator field breaker.
Recommended action verbs are listed as follows (a more detailed listing can be found in Table 3):
a.
For power-driven rotating equipment, use Start, Stop, b.
For valves, use Open, Close, Throttle Open, Throttle Close, Throttle.
E0PWG Rev. 00 Page 21 of 45 1
c.
For power distribution breakers, use Synchronize and Close, Trip.
For multiposition control switches that have more than one position for a similar function, placement to the desired position should be specified.
Example:
Place the steam dump and bypass steam "AUT0-INHIBIT" switch to " INHIBIT".
Instructions for dealing with abnormal results need not be prescribed within procedural steps when it is a matter of standard practice.
For example, observation of noise, vibration, erratic flow, or discharge pressure need not be specified by steps that start pumps.
4.11 Printed Operator Aids When information is presented using graphs, charts, tables, and figures, these aids must be self-explanatory, legible, and readable under the expected conditions of use.
4.11.1 Units of Measure Units of measure on graphs, charts, tables, and figures should be given for numerical values consistent with control room indications which represent observed, measurement data, or calculated results. A virgule (slant line) shall be used instead of "per".
Examples:
ft/sec, lbs/hr.
See Table 1 for acceptable abbreviations.
E0PWG Rev. 00 Page 22 of 45
4.11.2 Titles and Headings Capitalization should be used for references to tables and figurcs, titles of tables and figures within text material, and column headings within a table.
4.11.3 Figure, Table, and Attachment Numbering Sequential arabic numbers should be assigned to figures, tables, and attachments in separate series. The sequence should correspond with the order of their reference in the text. The symbol
"#" and abbreviation "No." are unnecessary and should not be used. The number alone suffices.
Examples:
Figure 1, Figure 2, etc.
Table 1, Table 2, etc., Attachment 2, etc.
Page identification for figures, tables and attachments should consist of (1) procedure number, (2) procedure revision, (3) attachment number, and (4) page number. Page numbering shall comply with the requirements of subsection 2.6.
5.0 MECHANICS OF STYLE 5.7 Spelling Spelling should be consistent with modern usage. When a choice of spelling is offered by the dictionary, the first spelling should be used.
E0PWG Rev. 00 Page 23 of 45
5.2 Hyphenation Hyphens are used between elements of a compound word when usage calls for it. The following rules concerning hyphenation shall be followed:
When doubt exists, restructure the compound word to avoid hyphenation.
Hyphens should be used in the following circumstances:
a.
.n compound numerals from twenty-one to ninety-nine.
Example: one hundred thirty-four b.
In fractions.
Examples: one-half, two-thirds c.
In compounds with "self".
Examples:
self-contained, self-lubricated d.
When the last letter of the first word is the same vowel as the first letter of the second (two words may be used as an alternative).
Example:
fire-escape or fire escape e.
When misleading or awkward consonants would result by joining the words.
Example:
bell-like f.
When a letter is linked with a noun.
Examples: x-ray, o-ring, I-beam E0PWG Rev. 00 Page 24 of 45
g.
To separate chemical elements and their atomic weight.
Examples: Uranium-235 or U-235 5.3 Punctuation Punctuation should be used only as necessary to aid reading and prevent misunderstanding. Word order should be selected to require a minimum of punctuation. When extensive punctuation is necessary for clarity, the sentence shall be rewritten and
~possibly made into several sentences.
Punctuation shall be used in accordance with the following rules:
5.3.1 Brackets Do not use brackets.
5.3.2 Colons Use a colon to indicate that a list of items is to follow.
Example: Restore cooling flow as follows:
5.3.3 Commas Minimize the use of commas. Use of many commas is a sign the instruction is too complex and needs to be rewritten.
Use a comma after conditional phrases for clarity and ease of reading. Example: WHEN level drops to 60 inches, THEN start pumps...
E0PWG Rev. 00 Page 25 of 45
5.3.4 Parentheses Parentheses shall be used to indicate panel numbers, locations, or other information judged to be suitable for parenthetical inclusion.
5.3.5 Periods
/
Use a period at the end of complete sentences and for indicating the decimal place in numbers.
5.4 Vocabulary Words used in E0P's should convey precise understanding to the operator. The following rules apply:
Use simple words. Simple words are usually short, common words of few syllables.
Use the words common to normal control room communications. Refer to Table 1 for common usage words.
Use words that are concrete rather than vague, specific rather than general, familiar rather than formal, precise rather than blanket, and use their meaning consistently.
Only words with specific meaning should be used.
Acceptable verbs are listed in Table 3.
Avoid the use of pronouns.
E0PWG Rev. 00 Page 26 of 45
5.5 Numerical Values The use of numerical values should be consistent with the following rules:
Arabic numerals shall be used.
For numbers less than unity, the decimal point will be preceded by a zero.
Example:
0.1 The number of significant digits shall be equal to the number of significant digits available from the display and the reading precision of the operator.
Acceptance values should be specified in such a way that addition and subtraction by the user is avoided. This can generally be done by stating acceptance values as limits.
Example:
580 to 600 F Do not write out numerical values.
Engineering units should always be specified for numerical values of process variables.
They should be the same as those used in the control room displays.
Example: psig (or psia) instead of psi ESPWG Rev. 00 Page 27 of 45
5.6 Abbreviations, Letter Symbols, and Acronyms The use of abbreviations should be minimized because they may be confusing to those who are not thoroughly familiar with them.
Abbreviations may be used where necessary to conserve time and space, and when their meaning in unquestionably clear to the operator. Acceptable abbreviations and acronyms are listed in Table 1.
An acronym is a type of symbol formed by the initial letter or letters of each of the successive parts or major parts of a compound term. Only those abbreviations listed in Table 1 shall be used.
Capitalization of abbreviations should be uniform.
If the abbre-viation is comprised of lower case letters, it should appear in lower case in a title or heading. The period should be omitted in abbreviations except in cases where the omission would result in confusion.
5.7 Capitalization Capitalization should conform to standard American English usage, but may also be used as a technique for emphasizing certain words or phrases.
6.0 TYPING FORMAT 6.1 General Typing Instructions The following general instructions are to be followed for all emergency operating procedures:
l E0PWG Rev. 00 Page 28 of 45
Paper size should be 86 x 11 inches.
Plain white, bond paper with printed borders shall be used as specified in Figure 5.
Procedures are to be typed on IBM Displaywriter, Burroughs Word Processor or equivalent.
Letter gothic, pitch 12 or larger, printwheel shall be used.
6.2 Page Arrangement The following page arrangement instructions should be followed:
Page margins are specified by the printed borders. Two type spaces are to be maintained between the text and borders.
Page identification information will be centered and one line space above the bottom page printed border.
See Figure 5 for an example of page layout.
6.3 Heading and Text Arrangement Block style, as illustrated in Figure 4, is to be used.
First-level section headings shall be in full capitals, with an under-score; second-level section headings shall be placed in initial capitals with an underscore; and third-level section headings shall be placed in initial capitals without an underscore.
E0PWG Rev. 00 Page 29 of 45 z
Section numbers shall begin two spaces from the left-hand printed border.
Three line spaces shall be allowed between headings and respective text.
Three line spaces shall be allowed between paragraphs.
Text will be typed using one-and-a-half line spacing.
6.4 Breaking of Words Breaking of words shall be avoided to facilitate operator reading.
6.5 Rotation of Pages Rotation of pages should be avoided if possible.
If pages need to be rotated, these rules shall be followed:
The top of the page with rotated print is the normal left-hand edge.
The page margins do not rotate.
Page identification and numbering will not be rotated.
E0PWG Rev. 00 Page 30 of 45
6.6 Printed Operator Aids Figures include graphs, drawings, diagrams, and illustrations. The following rules are established governing all figures:
The figure number and title shall be of gothic letter type, pitch 12 or larger.
The figure field shall be of sufficient size to offer good readability.
The essential message should be clear; simple presentations are preferred.
Labeling of graph axes shall be consistent with standard engineering practices.
Grid lines of graphs should be at least 1/8-inch apart; numbered grid lines should be bolder than unnumbered grid lines.
Labeling of items within the figure should be accompanied by arrows pointing to the item.
The items within the figure should be oriented naturally insofar as possible.
For example, height on a graph should be along the vertical axis.
In general, items within the figure should be labeled.
Typed labels shall be of gothic letter typed, pitch 12.
All lines in figures should be reproducible.
E0PWG Rev. 00 Page 31 of 45
-.7 r
r
Tables shall be typed using the following rules:
Type style and size should be the same as that for the f
rest of the procedure.
A heading should be entered for each column and centered within the column. The first letter of words in the column headings should be capitalized.
6.7 Cautions and Notes All notes and cautions should be distinguishable from the rest of the text by using the following format:
The applicable heading " NOTE" or " CAUTION" should be capitalized, centered, underlined and placed three line spaces below the preceding text.
The text of the note or caution shall be in block format, line-and-a-half spaced. The caution text will be indented five spaces from the left-hand printed margin and begun one-and-a-half line spaces below the heading. The text for notes will begin twenty spaces from the left-hand printed margin and one-and-a-half line spaces below the heading.
The right-hand margin of the text of the caution should be five spaces to the left of the right-hand printed margin.
The right-hand margin of the text of the note should be twenty spaces from the left of the right-hand printed margin.
E0PWG Rev. 00 Page 32 of 45
CAUTIONS shall be further highlighted by a line of asterisks one-and-a-half spaces above the heading and one-and-a-half spaces below the last line of the text.
See the examples presented in Figure 4.
6.8 Use of Foldout Pages The use of foldout pages should be avoided.
If foldouts are used, a foldout page is treated as a single page.
It should follow the format of a standard page except the width is different. The page should be folded so that a small margin exists between the fold and the right-hand edge of standard pages. This will reduce wear of the fold.
6.9 Use of Oversized Pages Oversize pages shall not be used. They shall be reorganized or reduced to a standard page.
6.10 Use of Reduced Pages Reduced pages should be avoided.
Final size of reduced pages should be standard page size.
7.0 REPRODUCTION Reproduction will be done on a standard copier, single-sided copy only. The reproduced copies of the E0P's will be inspected to ensure both legibility and placement on the page.
E0PWG Rev. 00 Page 33 of 45
Figure 1 PROCEDURE COVER SHEET A.
IDENTIFICATION:
E0P
Title:
Reactor Trip E0P Number: E0P-01 Revision Number: 00 Total Number of Pages: 26 B.
REVIEW:
I have reviewed the above procedure and have found it to be satisfactory.
Title Signature Date Manager-Reactor and Computer Technical Services Supervisor - Operations Supervisor - Station Training Reactor Engineer Unreviewed Safety Question Evaluation (10CFR50.59)
Does procedure change constitute an unreviewed safety question as per Standing Order G-46 (Form FC-154)?
YES NO C.
APPROVAL:
PRC Meeting Date:
The attached procedure is hereby approved and effective on the below date:
Manager - Fort Calhoun Station Effective Date E0PWG Rev. 00 Page 34 of 45
~
Figure 2 REACTOR TRIP: E0P-01 Effective Effective Page Revision Date 1-30 00 October 11, 1985 E0PWG Rev. 00 Page 35 of 45
I 1
l Figure 3 TITLE: REACTOR TRIP 1.0 PURPOSE This procedure provides the immediate actions which must be accomplished after an automatically or manually initiated reactor trip. This is the entry point for the entire Emergency Operating Procedure system. This
,nrocedure also provides the operator actions for rece rery from a rela-tively uncomplicated reactor trip. These actions are necessary to ensure the plant is placed in a stable, safe condition or that the plant is configured to respond to a continuing emergency.
2.0 ENTRY CONDITIONS Any symptom (s) of a reactor trip.
a.
Reactor trip alarm, b.
CEA's inserted indication (Bottom lights /Metrascope).
c.
Rapid decrease in reactor power.
d.
RPS trip setpoint exceeded.
E0PWG Rev. 00 Page 36 of 45
,t Figure 4 REACTOR TRIP REACTOR TRIP IMMEDIATE ACTIONS 3.0 OPERATOR ACTIONS 3.1 Depress manual reactor trip pushbuttor. and verify:
a.
Reactor power decreasing (CB-4)
AND b.
Negative startup rate (CB-4)
AND c.
No more than 1 regulating or shutdown CEA NOT inserted (CB-4) 3.1.1 E more than 1 regulating or shutdown CEA NOT inserted, THEN do the following:
a.
Open CEDM clutch power supply breakers (AI-3)
AND b.
Emergency borate:
(1) Close FCV-269X (DW Makeup Control Valve) and FCV-269...
1) further indentation...
ii) wrien necessary...
NOTE Reset the DIESEL GENERATOR AUTO START LOCK 0UT RELAYS as soon as possible...
E0PWG Rev. 00 Page 37 of 45
Figure 5 l
PAGE FORMAT
'/2"
- I REACTOR TRIP 7
REACTOR TRIP IMMEDIATE ACTIONS 8.5 10 4.0 OPERATOR ACTIONS 11.5 13 3.1 Depress manual reactor trip pushbutton and...
14.5 a.
Reactor power decreasing (CB-4) 16 AND 17.5 b.
Negative startup rate (CB-4) 19 AND 20.5 c.
No more than 1 regulating or shutdown 22 CEA NOT inserted (CB-4) 23.5 3.1.1 IF more than 1 regulating or shutdown CEA NOT 25 Tnserted, THEN do the following:
26.5 a.
Open CEDM clutch power supply...
28 (AI-3) 29.5 AND 31 b.
Emergency borate:
32.5 (1) Close FCV-269X (DW Makeup 34 Control Valve) and FCV-269.,
35.5 i) further indent...
37 ii) when necessary...
38.5 40 41.5 CAUTION 43 When feeding S/G's via the Emergency Feedwater Nozzles, 44.5 maintain S/G level > 80% to minimize Emergency Feedwater 46 Nozzle thermal stresses.
47.5 49 50.5 NOTE 52 Reset the lilt!IEL GENERATOR AUTO START 53.5 LOCK 0UT RELAYS as soon as possible...
55 56.5 58 E0P-01 5 5 Rev. 00 g,
62.5 Page _,of _
W" n
E0PWG Rev. 00 Page 38 of 45
Table 1 Acronyms and Abbreviations Abbreviation / Acronym Definition ADV.........
Atmospheric Dump Valve AFW.........
Auxiliary Feedwater A0P.........
Abnormal Operating Procedure CCW.........
Component Cooling Water CEA.........
Control Element Assembly CEDM.........
Control Element Drive Mechanism CET.........
Core Exit Thermocouple CIAS.........
Containment Isolation Actuation Signal CPHS.........
Containment Pressure High Signal CSAS.........
Containment Spray Actuation Signal CVCS.........
Chemical and Volume Control System CW..........
Circulating Water DW..........
Demineralized Water E0P.........
Emergency Operating Procedure ERF.........
Emergency Response Facility ESFS.........
Engineered Safety Features System FCS.........
Fort Calhoun Station FWRV.........
Feedwater Regulating Valve HJTC.........
Heated Junction Thermocouple HPSI.........
High Pressure Safety Injection LOCA.........
Loss of Coolant Accident LPSI.........
Low Pressure Safety Injection MCC.........
Motor Control Center MSIV.........
Main Steam Isolation Valve MSS.........
Main Steam Safety (Valve)
OI..........
Operating Instruction E0PWG Rev. 00 Page 39 of 45
e Table 1 (Cont'd)
Acronyms and Abbreviations Abbreviation / Acronym Definition OP..........
Operating Procedure PORV.........
Power Operated Relief Valve PPLS.........
Pressurizer Pressure Low Signal PW..........
Potable Water PZR.........
Pressurizer RAS.........
Recirculation Actuation Signal RCDT.........
Reactor Coolant Drain Tank RCP.........
Reactor Coolant Pump RCS Reactor Coolant System RPS.........
Reactor Protective System RVLMS........
Reactor Vessel Level Monitoring System RW..........
Raw Water SDCS.........
Shutdown Cooling System S/G.........
Steam Generator SGLS.........
Steam Generator Low (Pressure) Signal SGIS.........
Steam Generator Isolation Signal SGTR.........
Steam Generator Tube Rupture SIS.........
Safety Injection System SIAS.........
Safety Injection Actuation Signal SIRWT.........
Safety Injection Refueling Water Tank SI..........
Safety Injection SMM..........
Subcooled Margin Monitor SLB..........
Steam Line Break STA..........
Shift Technical Ad/isor T...........
Temperature Tavg.........
Average Temperature T
Cold Leg Temperature c..........
T H t Leg Temperature H..........
E0PWG Rev. 00 Page 40 of 45
Table 1 (Cont'd)
Acronyms and Abbreviations Abbreviation / Acronym Definition TSC..........
Technical Support Center VIAS.........
Ventilation Isolation Actuation Signal VCT..........
Volume Control Tank cpm..........
counts per minute cps..........
counts per second dpm..........
decades per minute ft..........
feet gal..........
gallon gpm..........
gallons per minute hr..........
hour Hz..........
hertz, cycles per second i.e..........
id est (that is)
[
in..........
inch (es) kw..........
kilowatt min..........
minute, minimum mr..........
millirem Mw..........
megawatt ppb..........
parts per billion ppm..........
parts per million psia.........
pounds per square inch absolute psig........,
pounds per square inch gage rad..........
radiation absorbed dose rem..........
roentgen equivalent man rpm..........
revolutions per minute E0PWG Rev. 00 Page 41 of 45
Table 1 (Cont'd)
Acronyms and Abbreviations Abbreviation / Acronym Definition scfm.........
standard cubic feet per minute sec..........
second
- /s..........
Versus yr..........
year asterisk F..........
degrees farenheit A..
delta, as in AT
()..........
parenthesis
/..........
per percent quotation marks E0PWG Rev. 00 Page 42 of 45
Table 2 Preferred Verb List Verb Application Adjust...... To make a change in.
Align To arrange a system for operation, or to adjust an electronic system to a set of standards.
Allow To permit a stated condition to be achieved prior to proceeding.
For example: " Allow discharge pressure to stabilize."
Attempt To.... To make an effort to do.
Call-up...... Request from the plant computer.
Check To perform a physical action that compares expected values or parameters to actual plant parameters.
For example: " Check MSIV bypass valves closed."
Close For valves, to position fully shut; for electrical devices, to make a connection to a power supply.
Complete..... To accomplish specified procedural requirements.
For example, " Complete steps 11 through 20 of E0P-02."
Decrease..... Do Not use because of oral communication problems.
Depress To press down.
Direct...... To give instruction to.
Ensure...... To verify a certain t.e.dition exits, and if it does not, to manually take the necessary sters to establish the condition.
Establish..... To make arrangements for a stated condition.
For example: " Establish maximum charging flow."
Evaluate..... To assess conditions based upon observations, outside input, and experience.
E0PWG Rev. 00 Page 43 of 45
Table 2 (Cont'd)
Preferred Verb List Verb Application Go To To leave this instructional step and follow referenced instruction until directed back to this or another instruction.
Implement..... To place an instruction into effect in parallel with this instruction.
Increase..... Do Not use because of oral communication problems.
Inspect..... To measure, observe, or evaluate a feature or charac-teristic for comparison with specified characteristics.
The method of inspection should be included.
For example: " Visually inspect for leaks."
Isolate...... To set apart or separate from a system in use.
Locally...... To take an action outside the control room.
Lower To reduce in magnitude.
For example: " Lower steam generator pressure."
Maintain..... To keep in a certain condition or position.
Monitor...... To observe for conditions or trends.
Open To change the physical position of a mechanical device, such as a valve or door, to the unobstructed position that permits access or flow.
For example: "Open valve FCV-269."
Perform...... To carry out an action.
Raise To increase in magnitude.
For example: " Raise steam generator water level.
Record...... To document specified condition or characteristic.
For example: " Record discharge pressure."
Refer To..... Use another source for additional information concurrent with the procedure in use.
E0PWG Rev. 00 Page 44 of 45
Table 2 (Cont'd)
Preferred Verb List Verb Application Reset To reposition a breaker or control circuit for future operations.
Set To physically adjust to a specified position.
For example:
" Set pressurizer level control to ' Auto'."
Shut Do Not use. The verb close should be used instead.
Start To initiate motion of an electric or mechanical device directly or by remote control. For example:
" Start one charging pump."
Stop To cease the action of an electric or mechanical device directly or by remote control.
For example:
"Stop one charging pump."
Throttle..... To operate a valve in an intermediate position to obtain a certain flow rate.
For example:
" Throttle HPSI flow."
Transfer..... To shift electrical or fluid supply from one source to another.
Trip To bring to an abrupt and complete cessation; to manually activate a semi-automatic feature; or to open an elec-trical breaker.
For example:
" Trip turbine... "
Vent To permit a gas or some substance under pressure to be released from its vessel.
For example:
" Vent the pressurizer."
Verify...... To confirm that an expected condition, or characteristic, exists.
For example:
" Verify RCS inventory control.."
E0PWG Rev. 00 Page 45 of 45
.,.a_
m
._A_
w
_um-4 l
PROCEDURES GENERATION PACKAGE PART 4 E0P VERIFICATION PROGRAM 4
4
- O E
O t
i e
f e
FORT CALHOUN STATION UNIT NO. 1 EMERGENCY OPERATING PROCEDURE VERIFICATION PROGRAM E0PVEP Rev. 00 Page 1 of 28
Fort Calhoun Station Emergency Operating Procedure Verification Program Table of Contents Section Page
1.0 INTRODUCTION
4 1.1 Purpose....................
4 1.2 Scope.....................
4 1.3 Applicability.................
4
2.0 REFERENCES
4 2.1 General....................
4 2.2 Implementation.................
5 3.0 DEFINITIONS......................
5 4.0 RESPONSIBILITIES...................
6 4.1 Plant Manager.................
6 4.2 Plant Review Committee (PRC)..........
6 4.3 PRC E0P Subcommittee..............
7 5.0 E0P VERIFICATION PROCESS...............
7 5.1 Preparation Phase...............
7 5.1.1 Designated Personnel..............
7 5.1.2 E0P Source Documents..............
8 5.2 Assessment Phase................
8 5.3 Resolution Phase................
9 5.4 Task Analysis & Information Control Characteristics Review (ICCR).........
9 5.5 Documentation Phase..............
9 6.0 DOCUMENTATION.....................
10 6.1 Documentation Process.............
10 E0PVEP Rev. 00 Page 2 of 28
Attachments Page - E0P Development Support Documents........
11 - E0P Verification Forms..............
15 - E0P Verification Evaluation Criteria Checklist.. 20 E0PVEP Rev. 00 Page 3 of 28
1.0 INTRODUCTION
1.1 Purpose This program provides guidance to be followed for the administra-tive process used in the verification of the Fort Calhoun Station Unit No. 1 Emergency Operating Procedures (EOP's). Additionally, this document assigns responsibilities for carrying out the acti-vities of the process.
1.2 Scope This program identifies and directs the phases of the E0P veri-fication process.
1.3 Applicability This program applies to initial E0P implementation and subsequent revisions of Fort Calhoun Station Unit No.1 E0P's.
2.0 REFERENCES
2.1 General Emergency Operating Procedures Verification Guideline (INP0 83-004)
Fort Calhoun Station Emergency Operating Procedure Writers Guide (E0PWG) i E0PVEP Rev. 00 j
Page 4 of,28
2.2 Implementation The E0P source documents to be used during the assessment phase are presented on Form 1 of the E0P Verification Forms (Attachment 2).
For each E0P to be verified, additions, deletions, or revisions of the source documents to be used in the comparative evaluation should be noted in the spaces provided.
3.0 DEFINITIONS Emergency Operating Procedures (EOP's) - plant-specific procedures which direct operator actions from a post-reactor trip state to a safe, stable condition.
These actions are designed to effectively mitigate the consequences of the transients and accidents which have caused or necessitated a reactor trip.
Emergency Procedure Guidelines (EPG's) - document which contains the translation of engineering data derived from transient and accident analyses into operational guidance.
E0P Source Documents - documents or records which provide the basis for the E0P's.
Examples include the Fort Calhoun Statior Unit No. 1 Technical Specifications, USAR, and operating manuals, the C-E EPG's, the E0P Writers Guide, etc.
E0P Verification - a comparative evaluation that is used to confirm the written correctness of E0P's and to ensure that generic and plant-specific technical aspects have been properly incorporated.
E0PVEP Rev. 00 Page 5 of 28
E0P Written Correctness - a characteristic that indicates the degree to which the information presented in the E0P's is consistent with the Fort Calhoun Station Unit No. 1 E0P Writers Guide and other appropriate administrative guidelines.
E0P Technical Accuracy - a characteristic that indicates the degree to which the E0P's properly incorporate the plant-specific hardware and the technical information from E0P source documents.
Symptoms-plantcharacteristiNsthatdirectlyorindirectly indicate plant status.
E0P Writers Guide - a document that provides instructions for writing E0P's which utilizes good writing principles.
4.0 RESPONSIBILITIES 4.1 Manager - Fort Calhoun Station The plant manager shall approve all E0P's and their revisions.
4.2 Plant Review Committee (PRC)
The PRC shall approve all E0P's and their revisions prior to final approval by the plant manager.
E0PVEP Rev. 00 Page 6 of 28
4.3 PRC E0P Subcommittee The PRC E0P Subcommittee, consisting of the Manager - Reactor and Computer Technical Services, the Supervisor - Operations, the Supervisor - Station Training and the Reactor Engineer, shall have overall responsibility for the E0P verification process.
It shall determine when E0P verification is needed and its scope, approve the verification resolutions, and manage the technical accuracy and written correctness evaluation portions of the process, and resolve unreviewed safety question determination.,
5.0 E0P VERIFICATION PROCESS The process of E0P verification consists of four phases: preparation, assessment, resolution, and documentation.
5.1 Preparation Phase The preparation phase consists of the following activities:
Designate personnel to conduct the comparative evaluation Obtain and review the E0P source documents 5.1.1 Designated Personnel Supervisors shall appoint the necessary personnel as eval-uators to conduct the comparative evaluation.
Personnel should be appointed based on operating experience and understanding of plant hardware, the EPG's, and the E0P writers guide, E0PVEP i
Rev. 00 Page 7 of 28 l
5.1.2 E0P Source Documents The listing of E0P source documents is provided on Form 1 of the E0P Verification Forms (Attachment 1) and shall be reviewed by the personnel conducting the assessment. These documents shall be reviewed to ensure they are complete, current, and applicable.
If any additional source documents are found to be applicable, they shall be added to the listing on Form 1.
5.2 Assessment Phase During the assessment phase the evaluator shall perform the following activities:
Review the E0P's using the procedure-specific portion of the evaluation criteria (Attachment 3) and source documents.
Indicate on Form 1 of the E0P Verification Forms (Attachment 2)thattheevaluationwasperformed,eitherbycheckingthe acceptable column or by designating the appropriate discre-
.pancy sheet for any discrepancies identified.
Make a step-by-step review of the E0P using the step, caution, note-specific portion of the evaluation criteria (Attachment 3)andsourcedocuments.
Indicate for each step on Form 2 of the E0P Verification Forms (Attachment 1) that the comparative evaluation was performed, either by checking the acceptable column or by designating the appropriate discrepancy sheet for any discrepancies identi-fied.
E0PVEP Rev. 00 Page 8 of 28
Complete Form 3 of the E0P Verification Forms (Attachment 2) and forward the verification forms and discrepancy sheets to the PRC E0P Subcommittee.
l 1
5.3 Resolution Phase During the resolution phase, the PRC E0P Subcommittee shall perform the following activities:
Review the evaluator's comments and resolve any conflicts between the writer and evaluator.
Review and approve proposed solutions.
Update applicable source documents and procedures with approved resolutions.
E0P update / revisions shall be in accordance with the Writer's Guide and subject to the Verification-Validation process outlined in the Procedures Generation Package.
5.4 Task Analysis and Information Control Characteristics Review (ICCR)
A task analysis and ICCR shall be performed as part of the verification process for the upgraded E0P's and subsequent revisions.
5.5 Documentation Phase The documentation developed th ourhout the verification process will be ma'ntained in accordance with current administrative policies.
E0PVEP Rev. 00 Page 9 of 28
r s
6.0 DOCUMENTATION The documented items are needed to provide a history of the verification program. Attachments 1, 2, 3, and 4 will serve to provide the necessary documentation for the E0P implementation process. These items will be maintained as a verification package for QA retention.
6.1 Documentation Process contains two E0P Development Forms which provide a means of documenting the use of the generic EPG during E0P develop-ment. These completed forms shall be utilized by personnel per-forming the E0P verification and will serve as a means of recording differences from the EPG and justifying any significant deviations. contains the forms which will be utilized to document the E0P Verification.
E0P Verification Forms 1, 2, and 3 document the general and specific E0P verification for written correctness and technical accuracy.
E0P Verification Form 4 documents both the discrepancies found during the verification process and their resolutions. contains the E0P verification evaluation criteria in a checklist form which the evaluators will utilize when performing the E0P verif.,ication.
Specific evaluation criteria and applicable referencesarelistedheretoenablethereviewertoeffectively perform the E0P verification.
E0PVEP Rev 00 Page 10 of 28 I
L
ATTACHMENT 1 E0P DEVELOPMENT SUPPORT DOCUMENTS l
l E0PVEP Rev. 00 l
Page 11 of 28 i
4 E0P DEVELOPMENT E0P-Rev.
FORM 1 Page _ of _
TITLE, PURPOSE, AND ENTRY CONDITIONS DOCUMENTATION E0P Title, Purpose and Entry Conditions:
EPG Title, Purpose and Entry Conditions:
E0PVEP Rev. 00 Page 12 of 28
E0P DEVELOPMENT E0P-Rev.
FORM 1 (Cont'd)
Page _ of _
Justification of Differences:
l l
i I
E0P Writer:
Date:
l l
E0PVEP Rev. 00 Page 13 of 28
E0P DEVELOPMENT E0P-Rev.
FORM 2 Page _ of _
STEP DOCUMENTATION E0P Step:
EPG Step:
Justification of Differences:
l l
E0P Writer:
Date:
E0PVEP Rev. 00 Page 14 of 28
ATTACHMENT 2 E0P VERIFICATION FORMS i
t E0PVEP Rev. 00 Page 15 of 28
Page _ of _
E0P VERIFICATION FORM 1 E0P
Title:
E0P Number:
Revision: _
Scope of Verification:
Required E0P Source Documents 1.
CEN-152 Rev. 02 (C-E EPG's) 2.
Fort Calhoun Station Unit No. 1 USAR 3.
Fort Calhoun Station Unit No.1 Technical Specifications 4.
E0PWG Rev. 00 5.
E0PVAP Rev. 00 6.
7.
8.
Evaluators:
/
/
E0P-GENERAL VERIFICATION (Written Correctness / Technical Accuracy)
A.
Written Correctness Discrepancy Area Acceptable Sheet No(s).
l 1.
Legibility 1.
2.
Format Consistency 2.
3.
Identification Information 3.
B.
Technical Accuracy Discrepancy l
Area Acceptable Sheet No(s).
l i
1.
All 1.
E0PVEP Rev. 00 Page 16 of 28
E0P VERIFICATION E0P Rev.
FORM N0. 2 Page _ of E0P - SPECIFIC VERIFICATION (Step / Caution / Note) i Written Correctness Technical Accuracy Step Number Discrepancy Discrepancy Caution, or Note Acceptable Sheet No.
Acceptable Sheet No.
E0PVEP Rev. 00 Page 17 of 28
E0P VERIFICATION E0P-Rev.
FORM 3 Page __ of Verification Completion Date:
Performed by:
Reviewed by:
All actions and requirements for verification of this E0P have been completea satisfactorily and approved.
i l
l PRC E0P Subcommittee Date t
Representative Signature l
l l
l l
l E0PVEP Rev. 00 l
Page 18 of 28
E0P VERIFICATION E0P-Rev.
FORM 4 Page __ of DISCREPANCY SHEET NUMBER E0P
Title:
E0P Number:
Revision:
Step Number:
Discrepancy:
Evaluator:
Date:
Resolution:
Approval: YES N0 (Circle One)
PRC E0P Subcommittee l
Representative:
Date:
Resolution Incorporated By:
Date:
E0PVEP Rev. 00 Page 19 of 28
ATTACHMENT 3 E0P VERIFICATION EVALUATION CRITERIA CHECKLIST E0PVEP Rev. 00 Page 20 of 28 i
i EVALUATION CRITERIA CHECKLIST I.
E0P - GENERAL VERIFICATION REFERENCE A.
Written Correctness 1.
Legibility a.
Are the printed borders visible E0PWG 6.2 on all procedure pages?
b.
Are the text, tables, graphs, E0PWG 4.10 figures, and charts legible?
2.
Format Consistency a.
Do the following exist in each E0P?
Cover Sheet E0PWG 2.1 Title Page E0PWG 2.2 Section 1: Purpose E0PWG 3.0 Section 2:
Entry Conditions Section 3: Operator Actions b.
Is the operator actions section E0PWG 4.2 presented in a single column format?
E0PVEP Rev. 00 Page 21 of 28 m
c.
Is the page layout consistent with E0PWG 3.1 the sample page format?
3.
Identification Information a.
Is the procedure title descriptive E0PWG 2.2 of the purpose of the procedure?
b.
Does the procedure cover sheet E0PWG 2.1 correctly provide the following:
Procedure Title Procedure Number Revision Number Completed Review Completed Approval c.
Does each page correctly provide E0PWG 2.6 the following:
Procedure Designator and Number Revision Number Page _ of _ Numbers I
f d.
Does the procedure have all its pages in the correct order?
I l
l l
l E0PVEP Rev. 00 l
Page 22 of 28 L-
II. E0P - SPECIFIC VERIFICATION (Step, Caution, Note)
A.
Written Correctness 1.
Information Presentation a.
Are instruction steps numbered E0PWG 3.4 correctly?
b.
Are contingency action steps E0PWG 4.2.1 written correctly and identifiable?
c.
Are instruction steps constructed to comply with the following:
Steps deal with only one idea E0PWG 4.1 Sentences are short and simple E0PWG 4.1 Operator actions are specifi-cally stated E0PWG 4.1 Objects of operator actions E0PWG 4.1 are specifically stated If there are three or more E0PWG 4.1 objects, they are listed and space provided for operator check-off Punctuation and Spelling are E0PWG 5.3, proper and correct 5.1 Abbreviations and acronyms are correct and understandable E0PWG 5.6 to the operator E0PVEP Rev. 00 Page 23 of 28 o
d.
Do instruction steps make proper E0PWG 4.3 use of logic?
e.
Are cautions and notes used E0PWG 4.4 appropriately?
f.
Are cautions and notes placed E0PWG 4.4 properly?
g.
Are cautions and notes constructed to comply with the following:
they do not contain. operator E0PWG 4.4 actions.
they do not use extensive E0PWG 5.3 punctuation for clarity they make proper use of E0PWG 4.6 emphasis h.
Are numerical values properly E0PWG 5.5 written?
1.
Are values specified in such a E0PWG 4.5 way that mathematical calculations are not required?
j.
Are charts or graphs provided in the E0PWG 4.5 procedure for necessary operator actions?
k.
Are units o." measurement in the E0P E0PWG 5.5 the same as thos? used on equipment?
E0PVEP Rev. 00 Page 24 of 28
2.
Procedure Referencing and Branching a.
Do the referenced and branched E0PWG 4.7 procedures identified in the E0P's exist?
b.
Is the use of referencing mini-E0PWG 4.7 mized?
c.
Are referencing and branching E0PWG 4.7 instructions correctly worded?
"go to" (branching)
" refer to" (referencing) d.
Do the instructions avoid routing VEG* 3.3.5 users past important information such as cautions preceding steps?
e.
Are the exit conditions compatible VEG* 3.3.5 with the entry conditions of the referenced or branched procedure?
B.
Technical Accuracy 1.
Entry Conditions Information a.
Are the entry conditions of the VEG* 3.5.1 EPG listed correctly?
- VEG corresponds to INP0 Guideline 83-004, " Emergency Operating Procedure Verification Guideline."
E0PVEP Rev. 00 Page 25 of 28 L
b.
If additional entry conditions VEG* 3.5.1 have been added, do they comply with the following:
appropriate entry conditions for which the E0P should be used not excessive 2.
Instructional Step, Caution, and Note Information a.
Are E0P/EPG differences:
VEG* 3.5.2 documented explained b.
Is the EPG technical foundation VEG* 3.5.2 (strategy) changed by the following changes in E0P steps, cautions, or notes:
elimination addition sequence alteration
- VEG corresponds to INP0 Guideline 83-004, " Emergency Operating Procedure Verification Guideline."
E0PVEP Rev. 00 Page 26 of 28
c.
Are correct, plant-specific adapta-VEG* 3.5.2 tions incorporated per EPG:
systems instrumentation limits controls indications d.
Have licensing commitments applicable VEG* 3.5.2 to E0P's been addressed?
e.
Are differences between licensing VEG* 3.5.2 commitments and the E0P's or EPG's documented?
3.
Quantitative Information a.
Do the quantitative values, including VEG* 3.5.3 tolerance bands used in the E0P, comply with applicable E0P source documents?
b.
Where EPG values are not used in the VEG* 3.5.3 E0P, are the E0P values computed accurately?
- VEG corresponds to INP0 Guideline 83-004, " Emergency Operating Procedure Verification Guideline."
E0PVEP Rev. 00 Page 27 of 28
c.
When calculations are required by VEG* 3.5.3 the E0P, are equations presented with sufficient information for operator use?
4.
Plant Hardware a.
Is the following plant hardware VEG* 3.5.4 specified in the E0P available for operator use:
equipment controls indicators instrumentation
- VEG corresponds to INP0 Guideline 83-004, " Emergency Operating Procedure Verification Guideline."
E0PVEP Rev. 00 Page 28 of 28
O Y
d PROCEDURES GENERATION PACKAGE PART 5 E0P VALIDATION PROGRAM "O
a o
e f
i
- i
FORT CALHOUN STATION UNIT N0. 1 EMERGENCY OPERATING PROCEDURE VALIDATION PROGRAM E0PVAP Rev. 00 i
Page 1 of 33 l
l l
l
Fort Calhoun Station Emergency Operating Procedure Validation Program Table of Contents Section Page
1.0 INTRODUCTION
4 1.1 Purpose.....................
4 1.2 Scope......................
4 1.3 Applicability..................
4
2.0 REFERENCES
4 2.1 General.....................
4 2.2 E0P Source Documents...............
5 3.0 DEFINITIONS......................
5 4.0 RESPONSIBILITIES...................
7 4.1 Manager - Fort Calhoun Station..........
7 4.2 Plant Review Committee (PRC)...........
7 4.3 PRC E0P Subcommittee...............
7 4.4 Supervisor - Station Training..........
8 5.0 E0P VALIDATION PROCESS................
9 5.1 Preparation...................
9 5.2 Assessment....................
9 5.3 Resolution....................
10 5.4 Validation of Task Analysis and Information Control Characteristics Review (ICCR)......
10 6.0 DOCUMENTATION.....................
10 l
l l
E0PVAP Rev. 00 1
Page 2 of 33 L
Attachments Page - E0P Validation Forms...............
11 - E0P Validation Method Checklists.........
16 - E0P Validation Evaluation Criteria Checklist...
28 l
l l
E0PVAP Rev. 00 l
Page 3 of 33
1.0 INTRODUCTION
1.1 Purpose This program provides guidance to be followed for the administra-tive process used in the validation of the Fort Calhoun Station Unit No. I emergency operating procedures (E0P's). Additionally, this document assigns responsibilities for carrying out the acti-vities of this process.
1.2 Scope This program identifies the aspects of the E0P validation process and provides guidance that encompasses all of the four validation methods: table-top, walk-through, simulator, and reference.
Specific guidance for each method is presented in its appropriate checklist (see Attachment 2) while general E0P validation criteria is presented in Attachment 3.
1.3 Applicability This. program applies to E0P validation prior to, and subsequent to, implementation for Fort Calhoun Station Unit No.1.
2.0 REFERENCES
2.1 General Emergency Operating Procedures Validation Guidelines (INP0 83-006).
E0PVAP Rev. 00 Page _4 of 33
2.2 E0P Source Documents The following Fort Calhoun Station Unit No. I source documents shall be utilized during the validation process:
Fort Calhoun Station Unit No. 1 Radiological Emergency Response Plan and Emergency Plan Implementing Procedures.
Fort Calhoun Station Unit No. 1 USAR Fort Calhoun Station Unit No. 1 Technical Specifications.
Fort Calhoun Station Unit No. 1 Operating Procedures.
Results of E0P Verification.
3.0 DEFINITIONS Emergency Operating Procedures (E0P's) - plant-specific procedures which direct operator actions from a post-reactor trip state to a safe, stable condition. These actions are designed to effectively mitigate the consequences of the transients and accidents which have caused or necessitated a reactor trip.
Emergency Procedure Guidelines (EPG's) - document which contains the translation of engineering data derived from transient and accident analyses into operational guidance which is utilized in E0P development.
E0P Source Documents - documents or records which provide the basis for the E0P's.
E0PVAP Rev. 00 Page 5 of 33
E0P Validation - a performance evaluation of the E0P's to determine whether trained operators can effectively manage emergency conditions in the plant using actions specified in the E0P.
The E0P's are evaluated for usability and operational correctness.
E0P Usability - a characteristic of E0P's that indicates the degree to which E0P's provide sufficient and understandable operator information to manage emergency conditions.
E0P Operational Correctness - a characteristic of E0P's that indicates the degree to which the E0P's are compatible with plant responses, hardware, and shift manpower to manage emergency conditions.
Table-Top Validation - method of validation whereby personnel explain and/or discuss procedure action steps for an observer /
review team in response to a scenario or as part of an actual industry operating experience review.
Walk-Through Validation - method of validation whereby control room
. operators conduct a step-by-step enactment of their actions during an emergency scenario for an observer / review team without carrying out actual control functions.
Simulator Validation - method of validation whereby control room operators perform actual control functions on simulated equipment during an emergency scenario for an observer / review team.
E0PVAP Rev. 00 Page 6 of 33
Reference Validation - method of validation whereby data developed in a common E0P validation program is referenced by similar plants.
Control Room Simulator - a device that dynamically models the plant functions as presented by control room instrumentation.
Mock-Up - static device (e.g., models, photos, drawings) that portrays the control room hardware and configuration.
Scenario - a structural plan of parameter and plant symptom changes that provide operating cues for the conduct of assessment.
4.0 RESPONSIBILITIES 4.1 Manager - Fort Calhoun Station The plant manager shall approve all E0P's and their revisions.
4.2 Plant Review Committee (PRC)
The PRC shall approve all E0P's and their revisions prior to final approval by the plant manager.
4.3 PRC E0P Subcommittee The PRC E0P Subcommittee, consisting of the Manager - Reactor and Computer Technical Services, the Supervisor - Operations, the Supervisor - Station Training and the Reactor Engineer shall be responsible for the following:
managing the validation program and ensuring its smooth coordination with the training program.
E0PVAP Rev. 00 Page 7 of 33
determining the scope of validation.
selecting the validation method or methods.
appointing and training an observer / review team.
3 persons for the simulator validation method (3-to-crew) 1 person per operator for the walk-through validation o
method (one-to-one) 1 person for the table-top validation method (one-to-group) completing applicable portions of E0P Validation Form 1 (Figure 1).
reviewing discrepancies and resolutions forwarded by observer / review team personnel forwarding procedure changes including recommended resolu-tions to the PRC and plant manager for approval.
4.4 Supervisor - Station Training The Supervisor - Station Training (or Supervisor - Training) shall be responsible for the following:
i arranging for rotating operating crews through the training / validation sessions.
scheduling simulator training time for validation purposes as appropriate.
E0PVAP Rev. 00 Page 8 of 33
5.0 E0P VALIDATION PROCESS Regardless of the validation method, the E0P validation process can be described by three phases: preparation, assessment, and resolution.
The initial E0P validation process shall consist of a combination of simulator and control room walk-throughs. The Combustion Engineering simulator shall be utilized to validate the dynamic response, since Omaha Public Power District has no plant-specific simulator. Control room walk-throughs will be used to encompass the plant-specific portion of the validation process. Subsequent E0P updates and revisions shall be validated as specified by the PRC E0P Subcommittee and will vary depending on the scope and extent of the change.
5.1 Preparation Each validation method will use the applicable evaluation criteria presented in Attachment 3, and the scenario to be used will be recorded on the appropriate scenario form of Attachment 1.
Table-Top / Walk-Through Scenario Form, E0P Validation Form 2.
Simulator Scenario Form, E0P Validation Form 3.
Further, specific guidance to prepare for each validation method is presented in the validation method checklist of Attachment 2.
5.2 Assessment Specific guidance for assessment using each validation method is presented in the validation method checklist of Attachment 2.
E0PVAP Rev. 00 Page 9 of 33
5.3 Resolution Resolution will be accomplished by reviewing discrepancies and comments presented on the Validation Discrepancy Sheet, E0P Validation Form 4.
The observer / reviewer will propose solutions, if needed, and forward to the PRC E0P Subcommittee for approval with the other designated documentation.
5.4 Validation of Task Analysis and Information Control Characteristics Review (ICCR)
The Validation Program shall also include the determination of whether the information needed by the operator, as determined by the task analysis and ICCR, is available in the control room.
6.0 DOCUMENTATION The documented items needed to provide a history of the validation program are specified in each validation method checklist of Attachment 2.
These items will be maintained as a validation package for QA retention.
E0PVAP Rev. 00 Page 10 of 33
ATTACHMENT 1 E0P VALIDATION FORMS l
l l
E0PVAP Rev. 00 Page 11 of 33
E0P VALIDATION E0P-Rev.
FORM 1 Page _ of VALIDATION C0VER SHEET E0P
Title:
E0P Number:
Revision:
Scope of Validation:
Validation Method or Methods to be Used:
Designated Observer / Reviewer (s):
Preparation Completed By:
Date:
Assessment Completed By:
Date:
Operator (s) Involved:
Qualification: (SRO,R0,Other)
Approval:
YES N0 (circle one)
PRC E0P Subcommittee Representative:
Date:
Resolution Completed By:
Date:
E0PVAP Rev. 00 Page 12 of 33
E0P VALIDATION E0P-Rev.
FORM 2 Page __ of TABLE-TOP / WALK-THROUGH SCENARIO E0P
Title:
E0P Number:
Revision:
Date:
Purpose:
Scenario
Description:
Initial Plant Conditions:
Plant Parameter /
. Procedure Step Symptom To Transition To Description Cause Transition (Procedure, Step)
E0PVAP Rev. 00 Page 13 of 33
E0P VALIDATION E0P-Rev.
FORM 3 Page __ of SIMULATOR SCENARIO E0P
Title:
E0P Number:
Revision:
Date:
Purpose:
Scenario
Description:
Initial Plant Conditions:
Simulator Sequence (to be completed by simulator supervisor):
Event Time Malfunction No.
Hr: Min:Sec I/O Override Description Intent E0PVAP Rev. 00 Page 14 of 33
E0P VALIDATION E0P-Rev.
FORM 4 Page __ of VALIDATION DISCREPANCY E0P
Title:
E0P Number:
Revision:
Step Number:
Discrepancy:
Evaluator:
Date:
Resolution:
Approval:
YES NO (circleone)
PRC E0P Subcommittee Representative:
Date:
Resolution Incorporated By:
Date:
E0PVAP Rev. 00 Page _15 of 33 m
u --
ATTACHMENT 2 E0P VALIDATION I
METHOD CHECKLISTS 4
E0PVAP Rev. 00 Page 16 of 33
E0P VALIDATION CHECKLIST FOR TABLE-TOP /
WALK-THROUGH METHODS OF VALIDATION 1.0 PURPOSE The purpose of this checklist is to provide guidance for the table-top and walk-through methods of validating E0P's.
2.0 VALIDATION PROCESS E0P validation will be conducted in three parts:
preparation, assessment, and resolution.
2.1 Preparation The designated observer / reviewer will perform the following:
complete E0P Validation Form 1.
review the scope of the validation designated by the PRC E0P Subcommittee.
develop or modify scenarios to support the scope of validation and fill out the Table-Top / Walk-Through Scenario Form (E0P Validation Form 2).
modify / select the developed evaluation criteria to support the scope of validation E0PVAP Rev. 00 Page 17 of 33
select operators that are representative of the training and experience level expected of all operators schedule the required resources for table-top validation observer / reviewer the number of control room operators involved shall be consistent with the minimum number as specified in Technical Specification 5.2.2.a.
conference room sets of E0P's and supporting procedures schedule the required resources for walk-through validation observer / reviewer the number of control room operators involved shall be consistent with the minimum number as specified in Technical Specification 5.2.2.a.
control room or control room mock-up set of E0P's and supporting procedures 2.2 Assessment The designated observer / reviewer will perform the following:
brief the operator on the scope of validation and how the assessment will be conducted follow the developed or modified scenario by first giving the plant initial conditions and then give the changing plant parameters as talking or walking through the procedures E0PVAP Rev. 00 Page 18 of 33
i stop the talk-through or walk-through assessment for discussion of any identified discrepancies conduct a debriefing with the operators as soon as possible after each walk-through assessment, using the following sequence:
brief the participants on the purpose and objectives of debriefing have operators present problems and discrepancies which they had identified during the assessment have operators provide possible reasons for problems present other problems and discrepancies identified during assessment have operators discuss possible reasons for the other problem 3 summarize the findings of the debriefing for the operators record discrepancies and comments on E0P Validation Form 4 2.3 Resolution l
The designated observer / reviewer will perform the following:
review comments and discrepancies E0PVAP Rev. 00 Page 19 of 33
propose resolutions on E0P Validation Form 4 to the PRC E0P Subcommittee submit the validation package to the PRC E0P Subcommittee.
i The PRC E0P Subcommittee will perform the following:
review proposed resolutions with appropriate staff select resolutions for incorporation in the E0P's present the revised E0P's to the PRC for approval 3.0 DOCUMENTATION The following completed documentation will be submitted as a validation package:
E0P Validation Form 1 E0P Validation Form 2's E0P Validation Form 4's E0P Validation Evaluation Criteria Checklist E0P's used for the validation E0PVAP Rev. 00 Page 20 of 33
E0P VALIDATION CHECKLIST FOR SIMULATOR METHOD OF VALIDATION 1.0 PURPOSE The purpose of this checklist is to provide guidance for the simulator method of validating E0P's.
2.0 VALIDATION PROCESS E0P validation will be conducted in three parts: preparation, assessment, and resolution.
2.1 Preparation The designated observer / reviewer will perform the following:
complete E0P Validation Form 1.
review the scope of the validation as directed by the PRC E0P Subcommittee develop or modify scenario runs to support the scope of validation complete the upper portion of the Simulator Scenario Form i
(EOP Validation Form 3).
Forward to the simulator supervisor develop data collection techniques E0PVAP Rev. 00 Page 21 of 33 L
i evaluate plant-to-simulator characteristics make the required adjustments to the E0P set to use on the simulator select and schedule the number of control room operators to be consistent with the minimum specified in Technical Specification 5.2.2.a modify / select the evaluation criteria to support the scope of validation select operators that are trained to the level expected of all operators ensure the E0P's and supporting procedures are available 2.2 Assessment The designated observer / reviewer will perform the following duties:
brief the operating crew on the scope of the validation and how the assessment will be conducted ensure the observer / reviewer does not interface or interact with the operating crew brief the operating crew on the initial plant conditions for each scenario run E0PVAP Rev. 00 Page 22 of 33
conduct a debriefing with the operators as soon as possible after each scenario run using the following sequence:
brief the participants on the purpose and objectives for debriefing have operators present problems and discrepancies which they have identified during the assessment have operators comment on whether physical interaction / conflict was encountered have operators provide possible reasons for problems present other problems and discrepancies identified during assessment have operators describe possible reasons for the other problems summarize the findings of the debriefing for the operators record discrepancies and comments on E0P Validation Form 4 2.3 Resolution The designated observer / reviewer will perform the following duties:
review comments and discrepancies E0PVAP Rev. 00 Page 23 of 33
=
propose resolutions on E0P Validation Form 4 submit the validation package to the PRC E0P Subcommittee The PRC E0P Subcommittee will perform the following duties:
review proposed resolutions with appropriate staff select resolutions for incorporation in the E0P's present the revised E0P's to the PRC for approval 3.0 DOCUMENTATION The following completed documentation will be submitted with the validation package:
E0P Validation Form 1 E0P Validation Form 3's E0P Validation Form 4's E0P Validation Evaluation Criteria Checklist E0P's used for the validation data on plant-to-simulator characteristics and differences E0PVAP Rev.'D0 Page 24 of 33
E0P VALIDATION CHECKLIST FOR REFERENCE METHOD OF VALIDATION 1.0 PURPOSE The purpose of this checklist is to provide guidance in the use of data selected from a reference validation of E0P's.
2.0 VALIDATION PROCESS E0P validation will be conducted in three parts: preparation, assessment, and resolution.
2.1 Preparation The designated reviewer will perform the following:
complete E0P Validation Form 1 identify all differences in hardware and shift manpower between Fort Calhoun Station Unit No. I and the referenced plant identify the differences in the format and the level of detail between the E0P to be validated and the referenced E0P select the applicable data from the referenced validation E0PVAP Rev. 00 Page 25 of 33
2.2 Assessment The designated reviewer will perform the following:
evaluate the differences in hardware and shift manpower evaluate the differences in the format and the level of detail record discrepancies and comments on E0P Validation Form 4 with applicable data selected from the referenced validation 2.3 Resolution The designated reviewer will perform the following:
review comments and discrepancies evaluate the potential impact of any differences between the E0P to be validated and the referenced validation propose resolutions on E0P Validation Form 4 for the PRC E0P Subcommittee recommend E0P validation by table-top / walk-through or simulator method to confirm reference validation results The PRC E0P Subcommittee will perform the following:
review the validation package E0PVAP Rev. 00 Page 26 of 33
determine the scope of validation needed to confirm the resolutions and initiate an E0P Validation Form 1, if necessary present the revised E0P's to the plant manager for approval if subsequent validation is not required 3.0 DOCUMENTATION The following completed documentation will be submitted with the valida-tion package:
E0P Validation Form 1 E0P Form 4's E0P's used for the validation referenced validation package selected reference data E0PVAP Rev. 00 Page 27 of 33
d ATTACHMENT 3 E0P VALIDATION EVALUATION CRITERIA CHECKLIST i
.I 4
E0PVAP Rev. 00 Page 28 of 33
E0P VALIDATION EVALUATION CRITERIA CHECKLIST I.
USABILITY APPLICABILITY T-T W-T S_
A.
Level of Detail 1.
Is there sufficient information to perform the specified actions at each step?
X X
X l
2.
Are the alternatives adequately described at each decision point?
X X
X 3.
Are the labeling, abbreviations, and location information as provided in the E0P sufficient to enable the operator to find the needed equipment?
X X
X 4.
Is the E0P missing information needed to manage emergency conditions?
X X
X 5.
Are the contingency actions sufficient to address the symptoms?
X X
X Legend:
T-T: table-top validation method W-T: walk-through validation method S:
simulator validation method X: applicable to the validation method 0: not applicable to the validation method E0PVAP Rev. 00 Page 29 of 33
APPLICABILITY T-T W-T S_
6.
Are the titles and numbers sufficiently descriptive to enable the operator to find referenced and branched procedures?
X X
X B.
Linderstandability 1.
Is the E0P easy to read?
X X
X 2.
Are the figures and tables easy to read with accuracy?
X X
X 3.
Can the values on figures and charts be easily determined?
X X
X 4.
Are caution and note statements readily understandable?
X X
Y 5.
Are the E0P steps readily understandable?
X X
X II. OPERATIONAL CORRECTNESS A.
Plant Compatibility 1.
Can the actions specified in the procedure be performed in the designated sequence?
0 X
X 2.
Are there alternate success paths that are not included in the E0P's?
X X
X E0PVAP Rev. 00 Page 30 of 33
APPLICABILITY T-T W-T S_
3.
Can the information from the plant instru-mentation be obtained, as specified by the E0P?
0 X
X 4.
Are the E0P entry conditions appropriate for the plant symptoms displayed to the operator?
0 0
X 5.
Is information or equipment not specified in the E0P required to accomplish the task?
0 X
X 6.
Do the plant responses agree with the E0P basis?
0 0
X 7.
Are the instrument readings and tolerances stated in the E0P consistent with the instrument values displayed on the instruments?
0 X
X 8.
Is the E0P physically compatible with the work situation (too bulky to hold, binding would not allow them to lie flat in work space, no place to lay E0P's to use)?
0 X
X 9.
Are the instrument readings and tolerances specified by the E0P accurate for remotely located instruments?
0 X
0 E0PVAP Rev. 00 Page 31 of 33
1 APPLICABILITY T-T W-T S_
- 10. Does the Safety Parameter Display System adequately present the E0P safety functions?
0 X
X B.
Operator Compatibility 1.
If time intervals are specified, can the procedure action steps be performed on the plant within or at the designated time intervals?
0 X
X 2.
Can the procedure action steps be performed by the operating shift?
0 X
X 3.
If the specific actions are assigned to individual shift personnel, does the E0P adequately aid in the coordination of actions among shift personnel where
.necessary?
O X
X 4.
Can the operating shift follow the designated action step sequences?
0 X
X 5.
Can the particular steps or sets of steps be readily located when required?
0 X
X 6.
Can procedure exit points be returned to without omitting steps when required?
O X
X E0PVAP Rev. 00 Page 32 of 3_3
APPLICABILITY T-T W-T S_
7.
Can procedure branches be entered at the correct point?
X X
X 8.
Are E0P exit points specified adequately?
X X
X E0PVAP Rev. 00 Page 33 of 33
m r
e
-m.,
.h,a.n 4
a Y
l f
PROCEDURES GENERATION PACKAGE PART 6 E0P TRAINING PROGRAM O
g 9
l t
1
- -..... _ - -. - _. _,__. --._,... ~, _..
,._-._______._____,m.,___-_
Fort Calhoun Station Unit No. 1 Emergency Operating Procedure Training Program E0PTP Rey, 00 Page 1 of s
Fort Calhoun Station Emergency Operating Procedure Training Program Table of Contents Section Page
1.0 INTRODUCTION
3 1.1 Purpose......................
3 1.2 Scope.......................
3 1.3 Applicability...................
3 2.0 PROGRAM DESCRIPTION....................
4 2.1 Initial Training..................
4 2.2 Awareness and Involvement in the Upgrade Process..
4 2.3 Individual Study and Review............
4 2.4 Classroom Presentation and Discussion.......
4 2.5 Simulator Instruction and Control Room Walk-Throughs...................
5 2.6 Examination....................
5 2.7 Revisions / Retraining................
6 3.0 DOCUMENTATION.......................
6 E0PTP Rev. 00 Page 2 of 6
1.0 INTRODUCTION
1.1 Purpose The following describes the purposes of the Fort Calhoun Station Unit No. 1 Emergency Operating Procedure (EOP) Training Program:
Enable the operators to understand the structure and format of the E0P's.
Enable the operators to understand the technical bases of the E0P's.
Provide the operator with a working knowledge of the E0P technical content.
Enable the operators to effectively use the E0P's under emergency conditions.
1.2 Scope
, This program identifies and directs the phases of the E0P training program.
1.3 Applicability This program applies to initial E0P implementation and subsequent revisions of Fort Calhoun Station Unit No. 1 E0P's.
E0PTP Rev. 00 Page 3 of 6 m
2.0 PROGRAM DESCRIPTION 2.1 Initial Training The initial training process can be divided into the following areas: awareness and involvement in the upgrade process, individual study and review, classroom presentation and discussion, simulator instruction and control room walk-throughs, and examina-tion.
2.2 Awareness and Involvement in the Upgrade Process The E0P upgrade program progress will be discussed, and draft procedures reviewed and critiqued, during operator requalification training in 1984-85.
2.3 Individual Study and Review Each E0P will be reviewed by the licensed operators prior to classroom presentation.
2.4 Classroom Presentation and Discussion A series of lectures and discussion shall be presented which con::ist of the following:
Use of new E0P format Reactor Trip Immediate Actions All event-specific E0P's Use of the functional E0P E0P technical bases and human factors information E0PTP Rev. 00 Page 4_ of 6_
T 2.5 Simulator Instruction and Control Room Walk-Throughs Simulator instruction shall be utilized, if possible, to provide each operator the " hands on" experience of using the E0P's under control room operating conditions.
In addition, because Omaha Public Power District does not own a simulator, Fort Calhoun Station specific control room walk-throughs shall be utilized for each operator with the following simulator guidance continuing to be applicable:
Training conducted on the simulator should consist of a combination of simulated events and walk-throughs to exercise the E0P's.
A wide variety of scenarios, including multiple and sequential failures, should be used to exercise the E0P's.
Training should be conducted with a full shift complement, exercising each E0P to stress operator roles, interaction, and team training. Crew members should train by performing their normal and alternate control room functions.
2.6 Examination The operator's E0P knowledge and understanding shall be evaluated in accordance with the following:
A written examination shall be conducted at the completion of classroom training (see Section 2.4).
E0PTP Rev. 00 Page 5_ of 6
An operating evaluation at the conclusion of the simulator (walk-through) instruction.
If an operator is found to be deficient in any area, retraining and reexamination will be conducted in this area.
Every operator will be trained and have passed the examination prior to being placed on shift in the control room with the upgraded E0P's in place.
2.7 Revisions / Retraining Following the initial training program (as described above),
operator retraining will be conducted due to revisions to the E0P's and as part of the operator requalification program.
Future revisions to the E0P's may result from EPG revisions, revisions to plant-specific information, or improvements to existing safety analyses. Operator retraining will be performed prior to implementation of such revisions in accordance with the general methods described above.
3.0 DOCUMENTATION Documentation of operator training shall be maintained in accordance with existing Station Training Department procedures.
E0PTP Rev. 00 Page 6 of 6