Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys
ML20202B093
Person / Time
Site: Fort Calhoun 
Issue date: 01/30/1998
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20202B086 List:
References
NUDOCS 9802110108
Download: ML20202B093 (1)


Text

.

,e 2.0 LIMITING _ CONDITIONS FOR OPER41LQN 2.5 fl Tam and Feedwater Syriems

'can supply sufficient feed for removal of decay heat from i.a plant. The minimum amount of water in the emergency feedwater storage tank is the amount needed for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of such operation. The tank can be re-supplied with water from the fire-protection raw water system.'"

l A closure time of 4 seconds for the main steam stop valves is considered adequate and was selected as being consistent with expected response time for instrumentation as detailed in the steam line break incident analysis.""3' Referenen (1) USAll, Section 9.4.6 (2) USAR, Section 10.3 (3) USAR, Section 14.12 9002110108 980130 PDR ADOCK 05000205 P

PDR 2 29 Amendment No.127