ML20129C262

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept
ML20129C262
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/22/1996
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20129C238 List:
References
NUDOCS 9610230264
Download: ML20129C262 (2)


Text

-

U.S. Nuclear Regulatory Commission

,LIC-96-0163 ATTACHMENT A 9610230264 961022 PDR ADOCK 05000285 P

PDR

l,..

?

i i

I i

5.0

@MINISTI4TIVE CONTROLS 5.9.

ore Ooerating Linuts Reoort i

Core Operating Limits shall be established and documented in the Core Operating a.

Limits Report (COLR) before each reload cycle or any remaining part of a reload i

cycle.

i i

b.

The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC as follows:

1 i

1.

OPPD-NA-8301-P-A, " Reload Core Analysis Methodology j

Overview" (Latest NRC approved revision as stated in the COLR).

o j

2.

OPPD-NA-8302-P-A, "Neutronics Design Methods and j

Verification" (Latest NRC approved revision as stated in the i.

COLR).

b 3.

OPPD-NA-8303-P-A, " Transient and Accident Methods and i

" (L C

ved revision as stated in the i

COLR).

i l

4.TN"*WCAPD 2610$yANTKGETFusl%if~~

JMig

~~

"^^'

(W)estinsli6nsePropris6sy)hadtorRisulatidiReisi 16-~~~

WAppinisdin Evalsstion" 4

BPTh5LOffi6(6fNdslenR KmindihiniNoW H&Fai:ihtippersiinsjlMensFN6%D17-g l

binshsPubliiPdwer; Dis 6isifF6dCsthBun Sisti6dlinit i

M y p y[jn2!!j@j$df F ~"7 M ~ ~ ~ ~ 3 6gd#

l c.

The core operating limits shall be determined so that all applicable limits of the safety analysis are met. The Core Operating Limits Report, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Region IV Administrator and Senior Resident Inspector.

5-17a Amendment No. 141,144,157