i ATTACHMENT 3 GSE Design Procedure B-9 Technical Calculation Production Checking and Approval 1
)
l 1
8903220431 890315 PDR ADOCK 050002G5 P_ ___ _ _
n m - -m-m.un-w e s.wc
- i m ;,.g.,
W
( 3 i' ie DESIGN PROCEDVRE B-9 Technical Calculation Production Checkina and Acoroval 10-QBJECTIVE This Procedure is provided to ensure that calculations'. performed by1 GSE are prepared,
- recorded, checked and approved in a controlled manner.-
This Procedure is responsive to ANSI N45.2.11 and the Quality Assur-'
ance Plan.
x ;e 2.0 APPLICATION 2.1 Calcul ation s '
Calculations shall be formally included in the design package at.
the direction of the Design Engineer.
n The calculations are penformed on Form GSE-B-9-1 in a neat and orderly. manner so that assumptions, methods and results can be' readily checked.
The engineer performing the calculations.identi-fies each individual sheet, dates and initials it as the origina.
p[.h tor.,A : calculation cover sheet shall be, attached to each setof b
calculations indicating,' MR, title, revision and signatures of the e
preparer and checker.
Where diagrams, curves, and other inputs related to the calculation ~
l work are prepared on paper other than the standard calculation
]
- sheets, these pages are identified, initialed by.the originator, I
- dated, numbered, and referenced on the calculation sheets.
Each page shall indicate the total number of pages -in the calculation.
Reference shall be'made to the design drawing, specification and/or material list for which the calculation is performed.
l The calculation work shall be presented in the following order:
A.
Purpose - State the purpose of calculations.
B.
Assumptions - State the established conditions and assumptions.
C.
References - List all documents and computer codes referenced in the calculations.
]
a D.
Summary of Results - Statement of findings and identification of the result to be used in the design.
B-9.1 Rev. 6/88 i
J V
~'
_ _ _ __ _ a
__.~ m - - - - u.wr. 1.u... mm.4mu. wus & j,, gap we.. um E
-i ~.
1
$p:w E.
- Method - Summarize the method used for computational work..
_i o
+
F.
- Computational -Work '- Computations should be presented in.a neat orderly manner.
Underline all important results.
. 2.2
.Comouter Analyses Computer. analyses. shall. be checked by an engineer that is'exper.-
ienced in the use of the software which is utilized for the analy-sis.
-For " example, if T-PIPE is utilized, the checker must be experienced.with the.modeling techniques and theory of T-PIPE.
Each computer run should include the title, date, and page number
-on every sheet.. Listing of.the computer input shall be provided.
Final ' computer runs should _be identifiable by a unique number or code.
Machine generated program name and version should : appear-on each run and: the job I.D.
will be included with the. preparer's signature on.the calculation cover sheet.
2.3 C_QE Requirements 1
If. the calculations involved CQE equipment or components, the fol-
. lowing additional requirements should be followed:
a)
CQE should be indicated on the calculation cover sheet for both the calculations and computer listing (if required).
..n,
%"h b)
Listing of the computer file identification shall be placed in
.the calculations with a brief description for each file, c)
The requirements for the computer runs are identical as stated in Section 2.2, Computer Analysis.
d)
Only the computer software which have bcra properly bench-marked and are subject to OPPD's QA requirements shvuld be used.
Use of p_on-benchmarked programs shall be justified in the calculations.
2.4 Review and Aonroval An engineer other than the performer of the calculation shall. check the results and indicate his concurrence by his signature on the calculation cover sheet.
The checker shall complete the checklist Calculations (Form B-9-3) and/or checklist - Computer Calcula-tions (Fcrm B-9-2) included in this procedure.
B-9.2 Rev. 6/88
,,..n_
-,,,.--.n
..-..~~:..-
, m.,
m,u,,su w. m ;w,.-, m e:w.ra.,
o.
I l
k 2.5 Chenaes and Revisions
}
When calculations are modified to reflect changes in design' input, this f act shall.be recorded by a revision of the calculation sheets in accordance with Administrative Procedure A-11.
i fo ll i
i 1
i l
i
- g. ;.
. c_.;,
i l
1 J
i
{
8-9.3 Rev. 6/88
g_
_ _ ~ _ _
____..._,__.,.,..,.....,,...;,~.,.
' GIE ' B-% 1 GENERATING STAT 10N EN u1NEERING
, CALCULATION SHEET i
PROJECT REVISION No I
' p%pb.
l Wi SUBJECT PAGE No 0F
,1 l
l 4
I 1
2 3
4 5
6 l
7 1
8 9
10 I
11 12 13 14 l
ap, 15 1G 17 18 19 20 21 22 4
23 l
24 i
25 26 27 28 29 l
30 31 32
(.
33 34 I
35 B-9.4 Rev. 6/88 36
n--
aw
-. g. sj,.
L i
I k
l l
l CsE B 9 3 Form Rev. 6/88 l
9,7.
CHECKER'S CHECKLIST, CALCULATIONS MR Nc'.
Document Reviewed:
i
Title:
k Date:
Revision No.
i Checker:
'l Date:
YES NO N/A 1.
Are the calculations free of arithmetic errors?
i 2.
Was an alternative calculation utilized to verify the results? If so, is it attached to this form?
3.
Was an appropriate calculation method used? Was the basic theory used appropriate?
4.
Is the calculation consistent with the design basis requirements?
5.
Are the applicable codes, standards, and regulatory requirements, includ-ing issue and addenda, properly identified?
(y
.,r..
6.
Have assumptions been noted and justified?
s 7
Calculations meet the requirements of Design Procedure B 9.
8.
A calculation cover sheet is attached to the calculations.
9.
The calculation cover sheet irdicates if calculations are COE.
i
- 10. The appropriate title, revision, and dato are indicated on the calculation d
cover sheet.
- 11. calculations clearly reference the final conputer runs generated to sup-po-t the calculation.
B 9.6 1
1
)
i l
l l
l
-.__--~_-.------w-
-ie
%wun n 3. --- < w% a m;m,u c...
j a
{ ',
q
-c.
CSE B 9 2 Form' j
Rev. 6/83 d
y?
k CHECKER'S CHECKLIST COMPUTER CALCULATIONS
. MR No.
Docunent Reviewed
Title:
Date Revision No.
I Checkert l
Date:
YES NO N/A i
1.
The calculation cover sheet is attached to the computer run.
2.
The calculation cover sheet indicates if calculations are CCE.
I 3.
The appropriate title, MR nunber, revision, and date tire indicated on the calculation cover sheet.
'l 4.
A GSE B 9 1 Form is attached and states:
a.
The purpose of the calculation.
{
1 b.
The established conditions and assumptions.
c.
References.
,.q.
1;,
d.
SunYnary of results.
5.
Computer run has title, date, and page number on every sheet.
6.
Is the listing of computer input and the unique identification (if applicable) provided?
3 1
7.
Machine generated program name and version appears on each run or is indicated in the calculations.
8.
Is the computer software benchmarked?
j 9.
If the computer software has been loaded on an in house computer, have the l
changes made by OPPD been properly reviewed for their impact on the l
accuracy of the code and have been found satisfactory, or is the in house co.nputer sof tware bench marked?
10.
Is the computer program appropriate to do the intended calculations?
- 11. Was an alternate calculation or model utilized to verify results? If so, is it attached to this form?
i 12.
Is modeling correct in terms of geometry input and initial conditions?
{
l
- 13. Are the results reasonable?
4 h* p.-
?
B 9.5
!