ML20248D204

From kanterella
Revision as of 02:42, 2 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Lists Search Commands Used to Satisfy Request for LERs Re Relays or Diesel Generator Control Circuitry Problems Affecting Multiple Diesel Generators Similar to Recent Event at Facility & Calibr Problems W/Relays
ML20248D204
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/28/1989
From: Mays G
OAK RIDGE NATIONAL LABORATORY
To: Mazumdar S
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML20248D144 List:
References
NUDOCS 8910040154
Download: ML20248D204 (2)


Text

.. .:r x-  :--~-

[ .si ; p ,

8

. (,] i t y

rMY j[  ; OAK RIDGE NATIONAL LABORATORY Post orries sox 2cos OAK RIDGE. TENNESSEE 37831 ^

( ,;g opeurso av mma unwrm emnov sysreus, oc.

p Bldg. 9201-3, MS-8065

. July 28, 2989..

4 Mr. Subincy Mazumdar Office _ for Analysis and Evaluation of Operational Data -

MS 9705.MNBB.

U. S. Nuclear Regulatory Comission Washington, DC 20555.

Dear.Mr. Mazumdar:

.LERs on Relay Problems In response to your, July 25 requet*,, we searched the SCSS database for LERs related to (1) relays or diesel generator control circuitry problems affecting multiple diesel generators, similar to a recent event at the Perry plant (LER 89-017) and (2) calibration problems with relays affecting multiple trains of a system similar to a 1988 event occurring at .the Palisades plant (LER 88-021).

.The SCSS database presently contains-LERs with event dates from 1980 approximately through mid-May~1989. The search comands used to satisfy -

.your' request are as follows:

'Comand Comant, Search 1 FIND- .

Find all LERs, similar to the

.ICOMP.217.<PSYS> EH- 1989 Perry event, describing PSYS IH EH- ' problems with relays located END' in the Emergency Power Generation System (PSYS EH) or all LERs- found in the Emergency Generator I & C System and the Emergency Power RESULT: 652 LERS (Group A) System (Group A).

ST: From Group A, determine which PSYS EH < COMP > XXX events involved multiple

.PSYS EH ..NE. I trains (Group B). END RESULT: 192 LERS (Group B) -XF List all events from Group B 'PSYS PD which also involved design END problems. RESULT: 2894 LERS (Group C) '3910040154 890925 PDR ADOCK 05000440 p PDC __2_ _ _-- . _ - - - _ __ - _ -_ - - _ - _ __ ___ _ . _ - _ _ _ - _ - __- _-__ e - - - - ~ ~ - - - - - - - -

yJ cw 1 ,

a- 1 ,

t '

sg v , _ h-gf,,q n ,Mr.LSubinoy'Mazumdar-9, 2.. ' July 28,:1989- >a

h ,

U LCommand (Cont!'d)* Comment' (Cont'd) , -NATCM C B-

  • : RESULT: L44' LERs '(Group D) Enclosure 1-3:-

N0 MATCH D B- List: all- the Other. relay; problems, other than design-L< related.s RES!!LT: ' 148 LERs' Enclosure 2 ,e ~ Search 2' ' FIND Find all LERs, similar to the o ICOMP 217:<EFF):LB 1988 Palisades event, END describing calibration-

ST. .

' problems with relays which TR .NE. 1 <PSYS> .NE.'XX .NE. involved multiple trains YY..NBEG. P. (Group E). From Group E', END determine which of the events also involved design problems ' . RESULT:: '187 LERS .(Group;E) (Group G). XF PSYS PD END. . RESULT: LERS (Group F)' MATCH F E: RESULT: 23 LERS (Group G) Enclosure 3

NOMATCH G E List all other out-of-calibration problems, other than ' desi gn-rel ated.

. RESULT: 164 LERs Enclosure 4 The' abstracts' for the 379 LERs are enclosed. Please contact either Mike Poore (FTS 62,4-0325) or myself (FTS 624-0394) if we can be of further assistance. Sincerely yours, ,h [Niay/ ' G. T. Mays Nuclear Operations Analysis Center GTM:DSQ:gts Enclosures

  1. ~

.cc: J. R. Buchanan W. P..Poore D. S. Queener ' File - GTM j - - _ - - - - - - - _ _ - - - - - - _ _- _ _ _ _ -