ML20248D204
| ML20248D204 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/28/1989 |
| From: | Mays G OAK RIDGE NATIONAL LABORATORY |
| To: | Mazumdar S NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
| Shared Package | |
| ML20248D144 | List: |
| References | |
| NUDOCS 8910040154 | |
| Download: ML20248D204 (2) | |
Text
..
.:r x-
- --~-
[.si ; p 8
. (,]
i t
y rMY j[
- OAK RIDGE NATIONAL LABORATORY Post orries sox 2cos OAK RIDGE. TENNESSEE 37831 ^
(,;g opeurso av mma unwrm emnov sysreus, oc.
p Bldg. 9201-3, MS-8065
. July 28, 2989..
4 Mr. Subincy Mazumdar Office _ for Analysis and Evaluation of Operational Data -
MS 9705.MNBB U. S. Nuclear Regulatory Comission Washington, DC 20555.
Dear.Mr. Mazumdar:
.LERs on Relay Problems In response to your, July 25 requet*,, we searched the SCSS database for LERs related to (1) relays or diesel generator control circuitry problems affecting multiple diesel generators, similar to a recent event at the Perry plant (LER 89-017) and (2) calibration problems with relays affecting multiple trains of a system similar to a 1988 event occurring at.the Palisades plant (LER 88-021).
.The SCSS database presently contains-LERs with event dates from 1980 approximately through mid-May~1989. The search comands used to satisfy -
.your' request are as follows:
'Comand
- Comant, Search 1 FIND-Find all LERs, similar to the
.ICOMP.217.<PSYS> EH-1989 Perry event, describing PSYS IH EH-
' problems with relays located END' in the Emergency Power Generation System (PSYS EH) or all LERs-found in the Emergency Generator I & C System and the Emergency Power RESULT: 652 LERS (Group A)
System (Group A).
ST:
From Group A, determine which PSYS EH < COMP > XXX events involved multiple
.PSYS EH ..NE. I trains (Group B). END RESULT: 192 LERS (Group B) -XF List all events from Group B 'PSYS PD which also involved design END problems. RESULT: 2894 LERS (Group C) '3910040154 890925 PDR ADOCK 05000440 p PDC __2_ e :yJ a-1 - - - ~ ~ cw 1
- t '
sg v h g,,q n,Mr.LSubinoy'Mazumdar- - f 9, 2.. ' July 28,:1989- >a
- h,
U LCommand (Cont!'d)* Comment' (Cont'd) -NATCM C B-
- RESULT:
L44' LERs '(Group D) - N0 MATCH D B-List: all-the Other. relay; 3:- problems, other than design-L< related.s ,e ' 148 LERs' RES!!LT: ~ Search 2' ' FIND Find all LERs, similar to the ICOMP 217:<EFF):LB 1988 Palisades event, o END describing calibration-
- ST.
' problems with relays which TR.NE. 1 <PSYS>.NE.'XX.NE. involved multiple trains YY..NBEG. P. (Group E). From Group E', END determine which of the events also involved design problems '. RESULT:: '187 LERS.(Group;E) (Group G). XF PSYS PD END. . RESULT: LERS (Group F)' MATCH F E: RESULT: 23 LERS (Group G)
- NOMATCH G E List all other out-of-calibration problems, other than ' desi gn-rel ated.
. RESULT: 164 LERs The' abstracts' for the 379 LERs are enclosed. Please contact either Mike Poore (FTS 62,4-0325) or myself (FTS 624-0394) if we can be of further assistance. Sincerely yours, ,h [Niay/ G. T. Mays Nuclear Operations Analysis Center GTM:DSQ:gts Enclosures .cc: J. R. Buchanan
- ~
W. P..Poore D. S. Queener ' File - GTM j _ _ _ _ -