Text
OBallelle Pacific Northwest Laboratories P.O. Bom 9'39 Richland, Washington U.SA 99352 February 26, 1985 Telephone (509) 375-2780 Te :a 15-2874 Mr. Carl Berlinger Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Berlinger:
SUBJECT:
TDI DIESEL ENGINE PROJECT (FIN 82963)-TRANSMITTAL OF "A REVIEW 0F THE OPERABILITY AND RELIABILITY OF TRANSAMERICA DELAVAL INC., DIESEL GENERATORS AT PERRY NUCLEAR POWER PLANT UNIT 1",
DATED FEBRUARY 1985 (PNL-5234)
Enclosed for your use are 10 copies of tlfe subject PNL report and two additional copies for the NRC public document reading room.
Other copies also have been distributed as noted on the last page of the report.
The principal PNL consultants and PNL staff engineer for the Perry review /
evaluation are A. J. Henriksen, B. J. Kirkwood, P. J. Louzecky and D. A. Dingee, respectively. We are prepared to support the NRC regarding our analysis, as needed.
Sincerely, W. W. Laity PNL Project Manager L
WWL:ri
Enclosures:
cc:
As noted on distribution for report.