ML20237L478

From kanterella
Revision as of 07:56, 24 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Matrix of Drafts for Insp Rept 85-16/13
ML20237L478
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/12/1986
From: Phillips H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20237F760 List: ... further results
References
IEB-79-14, IEB-79-28, NUDOCS 8708200231
Download: ML20237L478 (4)


Text

- - - - _ - _ _ - _ - _ _ _

l a

w $d #*% UNITED STATES

[ $ NUCLEAR REGULATORY COMMISSION j

$'  ;, REqiON IV

[ 811 RYAN PLAZA DRIVE, SUITE 1000 j l

4 ARUNGTON, TEXAS 76011 j

i May 12, 1986 l l

! MATRIX OF DRAFTS FOR REPORT 85-16/13 H. S. PHILLIPS i

\

i l Documents: 1 la & 1h

  • Handwritten draft for Unit 2 construction inspection.

(Submitted 3rd week Dec. 1985) 2a & 2b First revisions per comments on ia.

3 First draft of report.

4 First draft reviewed by management and management writes in conclusion and directed changes on pages 7,8,12 and 13, Para. 6 was revised because status changed.

Sa & Sb Second draft and Final draft. Final incorporates minor revisions.

6m Final report is a composite of construction, operations, and RIV technical review team followup.

Exit Inspector informed TUGCO of violations on December 4, 1985.

KEY

  • Original Submission l
    • Difference
      • Mgt directed change implemented j

S'UBJECT/ PARAGRAPH DOCUMENTS COMMENTS (Insnecter) la ib 2abb 7 4 Sa i Readet Cover Pace * * ** *** ,

Violations dropped.

Action on 10CFR50.55(e) ' (

Deficiencies Identified by the Aeolicant/ Para 3.0 )

l

a. TUGCO failed to
  • NA *** Violation dropped.

develop / implement a **

. procedure to show or reference objective evidence that defi-ciencies were corrected. e Violation of Criterien ..

V " Procedures, Instruc-tions and Drawings" of 10 CFR Part 50, Appendix B.

(Phillips,McClenkey finding; Phillips wrote the violation).

B708200231 870819 Attachment O PDR ADOCK 05000445 G PDR

I

. 1 g

5/12/06 i SUBJECT / PARAGRAPH DOCUMENTS COMMENTS Pg 2 I (Inspector) la 2 a t

l how construction manage-

! ment / personnel handle IEB requiring action, especially hardware

~

repair, replacement j

and modification. '

Prior to writeup, I stated to management that this is a viola-tion but mgt. disagreed and I wrote it as 4 I

unresolved.(McCleskey, Phillips finding)  !

o. No TUGCO construction * * ** *** .Mgt. dropped and l

focal point was found  !

wrote insert #2 {

for tracking such IEB in Doc.#4.

actions. j Prior to '

! writeup I stated to-l management that this *

)

4 is a violation but mgt.

disagreed and I wrote I it as unresolved.

(McCleskey,Phillips) i )

l ,. AEtion on Previous  !

l Inscection Findino l

Para 2 .

1

)

. Failure to properly re- * ** *** The droppino of i view design change i.e.

DCA 18728, not reviewed this violation was

~

for impact before sign- coordinated with T. Young by ing DCA 29894. Vi ol a-tion dropped.(McCleskey, Messers McCleskey Phillips) and Phillips as additional infor-mation was fottnd to show compliance.

Mr. Young agreed.

El ect ri cal Penetration Seals

. Whole paragraph changed * ** ** ** *** Violation dropped.

after management di-Request for office rected additional in- investigation to cpection in late Dec.

1985 and after BISCO review also dropped.

Memo to IE reviewed by RIV Mgt.(T. Young)

,