Insp Rept 50-334/85-06 on 850220-0320.No Violations Noted. Major Areas Inspected:Util Actions on Previous Insp Findings,Plant Operations,Housekeeping,Fire Protection, Physical Security & LERsML20205A328 |
Person / Time |
---|
Site: |
Beaver Valley, Nine Mile Point |
---|
Issue date: |
04/09/1985 |
---|
From: |
Dante Johnson, Meyer G, Lester Tripp, Troskoski W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
---|
To: |
|
---|
Shared Package |
---|
ML20205A317 |
List: |
---|
References |
---|
50-334-85-06, 50-334-85-6, NUDOCS 8504250482 |
Download: ML20205A328 (21) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19970021997-05-23023 May 1997 Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141E9451997-04-27027 April 1997 Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20137Q6851997-04-0707 April 1997 Insp Repts 50-334/97-01 & 50-412/97-01 on 970209-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20135B7781997-02-21021 February 1997 Insp Repts 50-334/96-10 & 50-412/96-10 on 961222-970208. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint, & Plant Support IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000334/19960091997-01-0202 January 1997 Insp Repts 50-334/96-09 & 50-412/96-09 on 961117-1221.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19960111996-12-23023 December 1996 Insp Repts 50-334/96-11 & 50-412/96-11 on 961209-12.No Violations Noted.Major Areas Inspected:Authorization Program & Administration Organization ML20135C4081996-11-16016 November 1996 Insp Repts 50-334/96-08 & 50-412/96-08 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000334/19960071996-11-0808 November 1996 Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress ML20058Q0221993-12-15015 December 1993 AIT IR 50-412/93-81 on 931109-19.No Violations Noted. Major Areas Inspected:Detailed Review of Circumstances Surrounding Failure of Both Emergency Diesel Generator Load Sequencers During Routine Surveillance Testing IR 05000334/19930261993-12-0808 December 1993 Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000412/19930251993-11-29029 November 1993 Insp Rept 50-412/93-25 on 931018-22.Violations Noted. Major Areas Inspected:Adequacy of Repair & Maintenance of Safety Class 1 Valves,Including follow-up of Auxiliary Feedwater (AFW) Water Hammer Issue IR 05000334/19930251993-11-23023 November 1993 Insp Repts 50-334/93-25 & 50-412/93-26 on 931018-22.No Violations Noted.Major Areas Inspected:Organization & Staffing Levels,Staff Qualifications & Training,External & Internal Exposure Control & Radiological Surveys IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids IR 05000334/19930221993-10-29029 October 1993 Insp Repts 50-334/93-22 & 50-412/93-23 on 930928-1025. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000334/19930801993-10-27027 October 1993 Insp Repts 50-334/93-80 & 50-412/93-80 on 930830-0903.No Violations Noted.Major Areas Inspected:Adequacy of Programs, Procedures,Training,Equipment & Sys for Implementing SBO 1999-09-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19970021997-05-23023 May 1997 Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141E9451997-04-27027 April 1997 Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20137Q6851997-04-0707 April 1997 Insp Repts 50-334/97-01 & 50-412/97-01 on 970209-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20135B7781997-02-21021 February 1997 Insp Repts 50-334/96-10 & 50-412/96-10 on 961222-970208. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint, & Plant Support IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000334/19960091997-01-0202 January 1997 Insp Repts 50-334/96-09 & 50-412/96-09 on 961117-1221.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19960111996-12-23023 December 1996 Insp Repts 50-334/96-11 & 50-412/96-11 on 961209-12.No Violations Noted.Major Areas Inspected:Authorization Program & Administration Organization ML20135C4081996-11-16016 November 1996 Insp Repts 50-334/96-08 & 50-412/96-08 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000334/19960071996-11-0808 November 1996 Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress ML20058Q0221993-12-15015 December 1993 AIT IR 50-412/93-81 on 931109-19.No Violations Noted. Major Areas Inspected:Detailed Review of Circumstances Surrounding Failure of Both Emergency Diesel Generator Load Sequencers During Routine Surveillance Testing IR 05000334/19930261993-12-0808 December 1993 Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000412/19930251993-11-29029 November 1993 Insp Rept 50-412/93-25 on 931018-22.Violations Noted. Major Areas Inspected:Adequacy of Repair & Maintenance of Safety Class 1 Valves,Including follow-up of Auxiliary Feedwater (AFW) Water Hammer Issue IR 05000334/19930251993-11-23023 November 1993 Insp Repts 50-334/93-25 & 50-412/93-26 on 931018-22.No Violations Noted.Major Areas Inspected:Organization & Staffing Levels,Staff Qualifications & Training,External & Internal Exposure Control & Radiological Surveys IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids IR 05000334/19930221993-10-29029 October 1993 Insp Repts 50-334/93-22 & 50-412/93-23 on 930928-1025. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000334/19930801993-10-27027 October 1993 Insp Repts 50-334/93-80 & 50-412/93-80 on 930830-0903.No Violations Noted.Major Areas Inspected:Adequacy of Programs, Procedures,Training,Equipment & Sys for Implementing SBO 1999-09-07
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19970021997-05-23023 May 1997 Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141E9451997-04-27027 April 1997 Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20137Q6851997-04-0707 April 1997 Insp Repts 50-334/97-01 & 50-412/97-01 on 970209-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20135B7781997-02-21021 February 1997 Insp Repts 50-334/96-10 & 50-412/96-10 on 961222-970208. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint, & Plant Support IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000334/19960091997-01-0202 January 1997 Insp Repts 50-334/96-09 & 50-412/96-09 on 961117-1221.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19960111996-12-23023 December 1996 Insp Repts 50-334/96-11 & 50-412/96-11 on 961209-12.No Violations Noted.Major Areas Inspected:Authorization Program & Administration Organization ML20135C4081996-11-16016 November 1996 Insp Repts 50-334/96-08 & 50-412/96-08 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000334/19960071996-11-0808 November 1996 Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000220/19940011994-01-24024 January 1994 Insp Repts 50-220/94-01 & 50-410/94-01 on 940103-07.No Violations Noted.Major Areas Inspected:Mgt Support, Protected Area Barriers,Detection Aids & Assessment Aids, & Protected Area & Isolation Zone Lighting IR 05000220/19930221993-12-22022 December 1993 Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted.Major Areas Inspected:Mov Program Commitments & Enhancments Identified During Team Inspection in June 1992 Were Reviewed for Progress ML20058Q0221993-12-15015 December 1993 AIT IR 50-412/93-81 on 931109-19.No Violations Noted. Major Areas Inspected:Detailed Review of Circumstances Surrounding Failure of Both Emergency Diesel Generator Load Sequencers During Routine Surveillance Testing IR 05000334/19930261993-12-0808 December 1993 Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000412/19930251993-11-29029 November 1993 Insp Rept 50-412/93-25 on 931018-22.Violations Noted. Major Areas Inspected:Adequacy of Repair & Maintenance of Safety Class 1 Valves,Including follow-up of Auxiliary Feedwater (AFW) Water Hammer Issue IR 05000334/19930251993-11-23023 November 1993 Insp Repts 50-334/93-25 & 50-412/93-26 on 931018-22.No Violations Noted.Major Areas Inspected:Organization & Staffing Levels,Staff Qualifications & Training,External & Internal Exposure Control & Radiological Surveys IR 05000220/19930011993-11-12012 November 1993 Insp Repts 50-220/93-01 & 50-410/93-01 on 930919-1030. Violations Noted.Major Areas Inspected:Major Components & Sys for Leakage,Alignment,Lubrication,Cooling Water Supply IR 05000220/19930231993-11-0505 November 1993 Insp Repts 50-220/93-23 & 50-410/93-22 on 931012-14.No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans & Audits,Protected & Vital Area Physical Barriers, Detection & Assessment Aids IR 05000334/19930221993-10-29029 October 1993 Insp Repts 50-334/93-22 & 50-412/93-23 on 930928-1025. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000220/19930241993-10-27027 October 1993 Insp Repts 50-220/93-24 & 50-410/93-23 on 931018-22.No Violations Noted.Major Areas Inspected:Exams of Procedures, Representative Records,Interviews W/Personnel & Observations by Inspectors IR 05000334/19930801993-10-27027 October 1993 Insp Repts 50-334/93-80 & 50-412/93-80 on 930830-0903.No Violations Noted.Major Areas Inspected:Adequacy of Programs, Procedures,Training,Equipment & Sys for Implementing SBO 1999-09-07
[Table view] Category:UTILITY
MONTHYEARIR 05000334/19900191990-10-0101 October 1990 Insp Repts 50-334/90-19 & 50-412/90-19 on 900917-21.No Violations Noted.Major Areas Inspected:Status of Previously Identified Items,Organization & Training,Internal & External Exposure Controls & ALARA IR 05000334/19900121990-07-24024 July 1990 Insp Repts 50-334/90-12 & 50-412/90-12 on 900505-0622. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Protection,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support IR 05000334/19900151990-07-13013 July 1990 Insp Repts 50-334/90-15 & 50-412/90-15 on 900611-15.No Violations Noted.Major Areas Inspected:Implementing QA Program in Conformance W/Tech Specs,Regulatory Requirements, Commitments & Industry Guides & Stds IR 05000334/19900161990-07-10010 July 1990 Radiological Controls Insp Repts 50-334/90-16 & 50-412/90-16 on 900604-08.No Violations Noted.Weaknesses Noted.Improvement Noted in Quality of Audits & Appraisals. Major Areas Inspected:Status of Previously Identified Items IR 05000334/19890131989-09-28028 September 1989 Insp Repts 50-334/89-13 & 50-412/89-14 on 890708-0831.No Violations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Plant Housekeeping & Fire Protection & Fitness for Duty IR 05000334/19890151989-09-22022 September 1989 Insp Rept 50-334/89-15 on 890905-08.No Violations Noted. Major Areas Inspected:Use of Hafa Intl Developed Instrumented Insp Technique as Alternative to Hydrostatic Test Requirements of ASME Section XI IR 05000334/19890141989-09-0808 September 1989 Insp Repts 50-334/89-14 & 50-412/89-15 on 890801-03.No Violations Noted.Major Areas Inspected:Partial Participation in Annual Emergency Preparedness Exercise on 890802 IR 05000334/19890171989-08-24024 August 1989 Insp Repts 50-334/89-17 & 50-412/89-17 on 890731-0810.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering Support Program,Including Staffing,Qa, Training,Mgt Support & Communications IR 05000334/19890121989-08-0909 August 1989 Insp Repts 50-334/89-12 & 50-412/89-13 on 890523-0707. Violations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Plant Housekeeping & Fire Protection,Surveillance Testing & Maint IR 05000334/19890081989-07-20020 July 1989 Insp Repts 50-334/89-08 & 50-412/89-08 on 890501-05.No Violations Noted.Major Areas Inspected:Evaluation of Effectiveness of Licensed Operator Training Program & Discussions W/Cognizant Training Personnel IR 05000334/19890111989-07-12012 July 1989 Safety Insp Repts 50-334/89-11 & 50-412/89-12 on 890531- 0602.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program Including Review of Previously Identified Insp Findings & Changes to Program IR 05000334/19890101989-06-28028 June 1989 Insp Repts 50-334/89-10 & 50-412/89-11 on 890515-19.No Violations Noted.Major Areas Inspected:Engineering & Maint for Limit & Torque Switch Settings in motor-operated Valves & Corrective Actions from Bulletin 85-003 IR 05000412/19890101989-06-0909 June 1989 Insp Rept 50-412/89-10 on 890515-19.No Violations Noted. Major Areas Inspected:Inservice Insp Activities,Including Observations of NDE in Progress,Implementing NDE Procedures & Review of Inservice Insp Data IR 05000334/19890091989-06-0808 June 1989 Physical Security Insp Repts 50-334/89-09 & 50-412/89-09 on 890508-11.No Violation Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audit,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000334/19890051989-06-0606 June 1989 Insp Repts 50-334/89-05 & 50-412/89-05 on 890401-0522.No Violations or Unresolved Items Noted.Major Areas Inspected: Plant Operations,Security,Radiological Controls,Plant Housekeeping & Fire Protection & LERs ML20247K9501989-05-15015 May 1989 Insp Repts 50-334/89-07 & 50-412/89-07 on 890417-21.No Deficiencies Noted.Major Areas Inspected:Licensee Activities in Response to NRC Info Notice 86-053 Re Heat Shrink Tubing IR 05000334/19890061989-05-12012 May 1989 Radiological Controls Insp Repts 50-334/89-06 & 50-412/89-06 on 890410-14.No Violations Identified.Major Areas Inspected: Organization & Staffing,Training & Qualifications, Procedures & Internal & External Exposure Controls IR 05000334/19890041989-04-19019 April 1989 Insp Repts 50-334/89-04 & 50-412/89-04 on 890216-0331. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Plant Operations,Security, Radiological Controls,Plant Housekeeping & Fire Protection IR 05000334/19890011989-03-0202 March 1989 Insp Repts 50-334/89-01 & 50-412/89-01 on 890101-0215.No Violations or Unresolved Items Identified.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Security,Radiological Controls & Fire Protection IR 05000334/19880271988-11-28028 November 1988 Insp Repts 50-334/88-27 & 50-412/88-21 on 881017-21.No Violations Noted.Major Areas Inspected:Licensee Radioactive Effluent Controls,Radwaste & Transportation & Radiological Environ Monitoring Programs IR 05000220/19880301988-11-16016 November 1988 Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt Organization,Audits,Records & Repts,Testing & Maint,Barriers,Security Power Supply & Assessment Aids IR 05000334/19880251988-10-31031 October 1988 Insp Repts 50-334/88-25 & 50-412/88-19 on 880901-30.No Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Plant Operations,Security,Radiological Controls,Plant Housekeeping & Fire Protection & Maint ML20154F4151988-09-0101 September 1988 Environ Qualification Enforcement Conference Rept on 880812. Major Areas Discussed:Concerns About Environ Qualification Continental Cable & Containment high-range Radiation Monitors & Wiring Inside Limitorque motor-operated Valves IR 05000334/19880221988-08-12012 August 1988 Insp Repts 50-334/88-22 & 50-412/88-16 on 880601-0715. Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Security & Physical Protection,Radiological Controls & Fire Protection IR 05000334/19880151988-07-14014 July 1988 Insp Repts 50-334/88-15 & 50-412/88-10 on 880606-10.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering Support Program Including Organization & Staffing,Qa,Training & Mgt Support & Communications IR 05000334/19880211988-07-14014 July 1988 Insp Rept 50-334/88-21 on 880509-13.Violations Noted.Major Areas Inspected:Licensee Corrective Actions on Concerns Identified in Equipment Qualification Insp 50-334/86-12 Conducted in June 1986 IR 05000334/19880191988-07-0707 July 1988 Insp Repts 50-334/88-19 & 50-412/88-15 on 880516-20.No Violations Noted.Major Areas Inspected:Radioactive Gaseous & Liquid Effluent Controls Program Including Radioactive Discharges & Radiation Monitoring Sys Calibrs & Tests IR 05000334/19880171988-06-20020 June 1988 Resident Insp Repts 50-334/88-17 & 50-412/88-13 on 8880501-31.No Violations Noted.Major Areas Inspected:Plant Operations,Physical Security,Radiological Controls,Plant Housekeeping & Fire Protection,Surveillance Testing & Maint IR 05000334/19880181988-06-20020 June 1988 Insp Repts 50-334/88-18 & 50-412/88-14 on 880509-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Organization & Staffing,Audits,Alara, External & Internal Exposure Controls & Startup Testing IR 05000334/19880141988-06-0707 June 1988 Insp Repts 50-334/88-14 & 50-412/88-09 on 880425-29.No Violations Noted.Major Areas Inspected:Unresolved Items,Plan & Implementing Procedures,Organization,Program Audit,Records & Repts,Testing & Maint IR 05000334/19880201988-06-0606 June 1988 Insp Repts 50-334/88-20 & 50-412/88-12 on 880509-13.No Violations Noted.Major Areas Inspected:Actions on Fire Protection Program Activities IR 05000334/19880101988-05-25025 May 1988 Insp Rept 50-334/88-10 on 880222-26.No Violations or Unresolved Items Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Configuration Mgt, Inadequate Core Cooling Sys Installation & Startup Testing IR 05000220/19880091988-05-19019 May 1988 Insp Repts 50-220/88-09 & 50-410/88-09 on 880307-11 & 0404- 08.Violations Noted.Major Areas Inspected:Inservice Insp Program Re First 10-yr Insp Interval & Augmented Exams Conducted by Licensee,Including Procedures IR 05000334/19880131988-05-16016 May 1988 Insp Repts 50-334/88-13 & 50-412/88-08 on 880411-15.No Violations Noted.Major Areas Inspected:Radiological Measurements Program Using NRC I Mobil Radiological Measurements Lab & Lab Assistance by DOE IR 05000334/19880161988-05-16016 May 1988 Insp Repts 50-334/88-16 & 50-412/88-11 on 880401-30.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operation,Physical Security, Radiological Controls,Plant Housekeeping & Fire Protection IR 05000334/19880081988-05-0404 May 1988 Insp Rept 50-334/88-08 on 880321-0401.Violations Noted.Major Areas Inspected:Reliability & Availability of Ac & Dc Power Sys,Diesel Generators,Eccs & Auxiliary Feedwater Sys IR 05000334/19880111988-04-28028 April 1988 Insp Repts 50-334/88-11 & 50-412/88-07 on 880216-0331.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Physical Security, Radiological Controls & Plant Housekeeping ML20151N5061988-04-13013 April 1988 Insp Rept 50-334/88-02 on 880201-05.Deviation Noted.Major Areas Inspected:Licensee Conformance to NRC Approved Procedure Generation Package Re Development & Implementation of Emergency Operating Procedures ML20151G5721988-04-0404 April 1988 Insp Repts 50-334/88-09 & 50-412/88-05 on 880222-26. Violations Noted.Major Areas Inspected:Licensee Solid Radwaste & Transportation Program Including Mgt Control, Shipments of Radioactive Matls,Training & Procedures IR 05000334/19880061988-03-24024 March 1988 Insp Rept 50-334/88-06 on 880208-12.No Violations or Deviations Noted.Major Areas Inspected:Steam Generator Eddy Current Insp,Water Chemistry Controls & Steam Generator Maint Radiological Controls IR 05000334/19880071988-03-10010 March 1988 Insp Repts 50-334/88-07 & 50-412/88-04 on 880208-12.No Violations or Deviations Noted.Major Areas Inspected: Licensee Compliance to NRC Order to Modify Unit 1 License Re Primary Coolant Sys Isolation Valves IR 05000334/19880011988-03-0909 March 1988 Insp Repts 50-334/88-01 & 50-412/88-01 on 880101-0215.No Violations Noted.Major Areas Inspected:Plant Operations, Maint Activities,Surveillance Testing,Diesel Generator Air Start Motor Lubrication Followup & Fitness for Duty Program ML20150B5511988-03-0909 March 1988 Insp Rept 50-334/88-12 on 880303-08.Violation & Deviation Noted.Major Areas inspected:880303 Event Involving Inoperability of Two of Four hi-hi Containment Pressure Channels Due to Placement of Associated Bistables ML20148C4121988-03-0404 March 1988 Insp Rept 50-412/88-03 on 880201-03.No Violations Noted.One Item Remained Unresolved at End of Insp.Major Areas Inspected:Total Loss of Control Room Annunciators on 880128 IR 05000334/19880041988-03-0303 March 1988 Insp Rept 50-334/88-04 on 880201-05.No Violations or Deviations Noted.Major Areas Inspected:Inservice Test Program Implementation of Pumps & Valves,Review of Procedures & Test Results & Test Witnessing ML20150B5401988-03-0202 March 1988 Insp Repts 50-334/88-03 & 50-412/88-02 on 880125-29. Violation Noted.Major Areas Inspected:Licensee Implementation of Radiological Controls Program During Unit 1 Outage,Diving Operations,Posting & Labeling & ALARA IR 05000334/19870191988-02-0808 February 1988 Insp Repts 50-334/87-19 & 50-412/87-69 on 871121-1231.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Physical Security, Radiological Controls & Fire Protection IR 05000334/19870171988-02-0303 February 1988 Partially Withheld Physical Security Insp Repts 50-334/87-17 & 50-412/87-66 on 871123-25 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected:Plan & Implementing Procedures,Program Audits & Records & Repts IR 05000412/19870671987-12-28028 December 1987 Insp Rept 50-412/87-67 on 871119-25.No Violations Noted. Major Areas Inspected:Startup Test Program,Power Ascension Tests & Test Results ML20238C1151987-12-22022 December 1987 Insp Rept 50-334/87-16 on 871030-1203.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Physical Security,Radiological Controls,House Keeping & Fire Protection 1990-07-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H1999-10-22022 October 1999 PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H ML20217N1491999-10-21021 October 1999 Notice of Violation from Insp on 990720-29.Violation Noted: as of July 1999,licensee Did Not Take Adequate Measures to Assure That Condition Adverse to Quality Involving Macro Biological Fouling of Service Water System Corrected PNO-I-99-046, on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded1999-10-0808 October 1999 PNO-I-99-046:on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded IR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action1999-07-26026 July 1999 PNO-I-99-036:on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action PNO-I-99-033, on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault1999-07-19019 July 1999 PNO-I-99-033:on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included ML20196K6531999-06-29029 June 1999 Notice of Violation from NRC OI Investigation Conducted on 980701-1211.Violation Noted:For Approx Four Hours on 980616, with NMP1 at Full Power,Sro Assumed Assistant Shift Supervisor Position,Contrary to TS Requirements IR 05000220/19990041999-06-21021 June 1999 Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-I-99-023, on 990411,NMP Performed Insps That Identified Indications of Crack Growth Around Portion of One of Vertical Welds.Repair Mod for Shroud Vertical Welds Is Expected to Take Approx Five Days to Complete1999-05-12012 May 1999 PNO-I-99-023:on 990411,NMP Performed Insps That Identified Indications of Crack Growth Around Portion of One of Vertical Welds.Repair Mod for Shroud Vertical Welds Is Expected to Take Approx Five Days to Complete IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000412/19993011999-04-20020 April 1999 NRC Operator Licensing Exam Rept 50-412/99-301(including Completed & Graded Tests) for Tests Administered on 990322- 25.All Applicants Passed All Portions of Exams IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20207E0761999-02-25025 February 1999 Notice of Violation from Insp on 981227-990206.Violation Noted:Licensee Failed to Promptly Identify & Correct Condition Adverse to Quality in That Investigation of Improperly Calibr Channnels Was Incompleted IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering ML20206U3141999-02-0505 February 1999 Notice of Violation from Insp on 981116-1217.Violation Noted:On or Before 981217,design Control Measures Were Not Established to Ensure That Design Basis Closing Voltage Requirements of Circuit Breakers Were Met & Verified IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000220/19980151998-12-23023 December 1998 Insp Repts 50-220/98-15 & 50-410/98-15 on 980927-1121.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196E5351998-11-19019 November 1998 Notice of Violation from Investigation on 980303-0930. Violation Noted:On 971224,individual Left Controls at NMP-2 Unattended for Six Minutes to Go Into Shift Supervisor Ofc, Area Not at Controls as Noted in NMPC UFSAR Figure 13.5-1 IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000220/19980141998-10-26026 October 1998 Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.Major Areas Inspected:Reviews of Licensee Activities in Functional Areas of Operations,Engineering, Maint & Plant Support IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20151Z3181998-09-15015 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:On 980808,inspectors Observed Maint Supervisor Manipulate Outboard Pump Packing Supply Valve & Perform Maint by Adjusting Outboard Packing Gland Nuts IR 05000334/19983011998-08-21021 August 1998 Exam Repts 50-334/98-301OL & 50-412/98-301OL Conducted During Wks of 980803-07 & 17-21.Exam Results:Four Unit 2 SRO Candidates Passed All Portions of Initial Exam.Good Performance Noted During Exam in Area of Crew Communication ML20236X8631998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:During Period of 980428-0608,licensee Failed to Implement Procedures as Evidenced by Listed Examples ML20236X8661998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:From 1988 to Sept 1997,licensee Routinely Vented Units 1 & 2 HHSI Piping Prior to Surveillance Testing W/O Proper Controls to Evaluate Amount of Gas.No Response Required IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19983001998-06-0303 June 1998 Exam Rept 50-334/98-300OL Conducted on 980420-24 & 0518.Exam Results:Three SRO Instant Candidates Passed All Portions of Initial License Exam ML20248A8001998-05-20020 May 1998 Notice of Violation from Insp on 980406-0409.Violation Noted:During Insp,Inspectors Determined That Licensee Failed to Properly Store,Control & Classify Safeguards Info ML20217L9251998-04-28028 April 1998 Insp Repts 50-220/98-08 & 50-410/98-08 on 980406-21. Violations Noted.Major Areas Inspected:Licensee Security Force Capability to Protect Facility Against Radiological Sabotage & Compliance W/Safeguards Program Commitments ML20217F5881998-04-22022 April 1998 Notice of Violations from Insp on 980208-0321.Violations Noted:Conditions Adverse to Quality Were Not Promptly Corrected from Nov 1993 to March 1998,util Failed to Correct Known Unit 1 & 2 TS Deficiency in Timely Manner ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20217B9771998-03-17017 March 1998 Notice of Violation from Insp on 971228-980207.Violations Noted:Repair Activities for 2-1 Station Battery Were Not Properly pre-planned & Implemented ML20216E8071998-03-0909 March 1998 Notice of Violation from Insp on 980105-0212.Violations Noted:On 971218 Dl Implemented Change to Temporary Operating Procedure to Allow Operators to Control Cooldown & Heatup Rate of Reactor Coolant by Mean Other than by Regulating ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant IR 07100116/20120271998-02-0404 February 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:Licensee Had Not Tested 20 of 27 Direct Lines at Alternate EOF in Coraopolis,Pa ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness PNO-I-98-002, on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.31998-02-0202 February 1998 PNO-I-98-002:on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.3 ML20199B8601998-01-22022 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 970925,package Containing Metal Samples Removed from Unit 1 Emergency Cooling Tube Sheet Was Sent to Listed Company,Not on List IR 05000334/19970101998-01-0909 January 1998 NRC Operator Licensing Exam Rept 50-334/97-10OL (Including Completed & Graded Tests) for Tests Administered on 971215- 18 1999-09-07
[Table view] |
Text
DCS Nss. 841109 850204 850214 850308
. 850130 850222 850307
-
00827 U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Report N /85-06 Docket N License No. CPR-66 ,
Licensee: Duquesne Light Company One Oxford Center 301 Grant Street Pittsburgh, Pennsylvania 15279 Facility Name: Beaver Valley Power Station, Unit 1 Location: Shippingport, Pennsylvania Dates: February 20 - March 20,1985 Inspectors: di I M- __
_
W. M. Troskoski, Senior Resident Inspector
__ _ 3/' datd M ff-N*-, N *
_- 1kcAr-D. M. Johnson, Resident Inspector-- "date
_
. b(
g W. M dr, Pfject Engineer ' date
Approved By: - -
L. E. Trfp9, Chief, Reactor Projects _ Idate Section No. 3A, Reactor Projects Branch 3
'
In_ spec _ tion Summary: Inspection No. 50-334/85-06 on February _ 20 - March _20,198 acted: Routine inspections by the resident inspectors (208 hours0.00241 days <br />0.0578 hours <br />3.439153e-4 weeks <br />7.9144e-5 months <br />) of Areas license In;.idToiis ( on previous inspection findings, plant operations, housekeeping, fire prc ' ion, radiological. controls, physical security, engineered safety
.
features u :fication, problem identification system, surveillance activities, maintenance ctivities, Offsite Review Committee, licensee event reports, and the maintenabce progra Resu_lts: No siolations were identified.
!
i 8504250482 850412 PDR ADOCK 05000334 G PDR .
. - - - - --
.
-
.
.
DETAILS Persons _ Contacted J. J. Carey, Vice President, Nuclear Grou R. J. Druga, Manager, Technical Services T. D. Jones, General Manager, Nuclear Operations W. S. Lacey, Plant Manager J. D. Sieber, General Manager,- Nuclear Services N. R. Tonet, General Manager, Nuclear Engineering & Construction Unit J. V. Vassello, Manager, Nuclear Safety The inspectors also contacted other licensee employees and contractors during this inspectio . The NRC Outstanding Items (0I) List was reviewed with cognizant licensee personnel. Items selected by the inspectors were subsequently reviewed through discussions with licensee personnel, documentation reviews and field inspection to detennine whether licensee actions specified in the OI's had been satisfactorily completed. The overall status of previously identified inspection findings were reviewed, and plannea and completed licensee actions were discussed for those items reported below:
(0 pen) Unresolved Item (81-20-02): Review DLC corrective action for high background level of-liquid waste effluent rad monitor (RM-LW-104).
Technical Specification 3.3.3.9, Radioactive Liquid Effluent Monitoring Instrumentation, requires the operability of RM-LW-104 whenever that pathway is used for an effluent release, or (1) a double sample analysis and (2) an independent verification by two technically qualified personnel of the release rate calculation and discharge valve lineup. Through a review of OM 1.17.4W, Liquid Waste Discharge Cooling Tower Blowdown, and Radioactive. Waste Discharge Authorizations, the inspector verified that RM-LW-104 is proven to be operable prior to a discharge by performance of a source check. When the background level approaches an unacceptably high level (about 10,000 cpm), a backflush is perfonned to back the meter indication down from the trip setpoint. Through discussions with Operations personnel, the inspector detennined that the only apparent problem with the above methodology occurs during the discharge from a relatively high level
'
source tank (such as LW-TK-7A and B), when the rad monitor usually initiates a trip at the end of the release due to crud buildup.
Through-a review of.the ORC Audit and Inspection Subcommittee minutes of
! January, 1985, the inspector determined that DCP 453 was issued in March, l 1982, to eliminate the crud trap in the sample line which results in unacceptably-high background radiation levels for RM-LW-104. However, it appears that the DCP had not been budgeted or assigned. The AIS recommended either the prompt DCP implementation or the formulation of a new position to resolve this issue. This item, therefore, remains open.
!
.
-3-
.
.
(. Closed) Unresolved Item (82-16-09): Resolve requested deviation from environmental qualification of containment high range monitor. In a previous inspection of the installed containment high range radiation monitors (RM 219 A and B), it was detennined that the environmental qualification of the control room instrumentation had not yet been completed. The licensee requested a deviation from the environmental qualification of the cable splices in a letter to NRR dated March 19, 1982. Since then, the high range radiation monitors installed under DCP 303 have been successfully qualified to the requirements and intent of IEEE Standard 323 - 1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Station. The inspector reviewed Test Report No. 46880 dated August 30, 1984, and verified that an independent test laboratory (Wyle) conducted tests of Raychem Corporation's environmental sealing kit and cable insulation repair kits that were used in DCP 303. The inspector had no further questions and this item is close (0 pen) Inspector Follow Item (82-24-01): Followup on TMI required contain-ment wide range pressure monitors. This item was left open pending sub--
mittal of a technical specification change to add these monitors to the accident monitoring instrumentation table, and to upgrade the pressure transmitters to IEEE 323-1974, Environmental Qualification Standards, when equipment is available. From a review of operating license change request No. 94, dated October 8,1984, the inspector determined that the licensee had requested a deviation from the model technical specifications provided by Generic Letter 83-37. This item is currently under review by NRR, which has jurisdiction over such matters, and is thereby close The second part of the item concerning upgrade of the pressure transmitters
- to IEEE 323-1974 remains opea pending review of acceptable equipment qualification test report (Closed) Unresolved Item (84-02-02)
- Control of ISI Program examination samples. The licensee's ISI Program allows the substitution of a weld scheduled for inspection to be made in the event that it cannot be examined due to physical constraints as detennined by the plant operator and maint-enance personnel. Though those sample changes were properly made on the basis of code requirements, no written procedure had been established to control this activity. The inspector reviewed 00C-ISI 3.0, Ten Year Inspection Plan, Rev. 0, Section 5.4.2, which pennits the Quality Control Engineer to interchange the period of inspection for any 10 Year Plan item as long as the percentage of completed inspections for each period is maintained as specified in the 10 Year Plan for the inspection category in question. This is acceptable and the item is closed.
- . , , . -
_ . .-_ . _ _ . _ .
- --4- '
.
. -
(Closed) Unresolved Item (84-02-03): Restrictive access examination When access to pipe welds is restricted by pipe supports or hangers,
- the 10 Year Plan requires the examination to be perfomed to the extent
- practical, unless removal of the support is permissible. No procedure had been available to govern how this detemination-is made. From a review of 0QC-ISI 3.1, Administration of the 10 Year Plan, Section 5.4.1,
- the inspector determined that the addition or deletion of any item from the 10 Year Plan is. required to be fully documented prior to any revision i of the plan. This documentation provides the justification for the i commitment change, and is forwarded to the Quality Control Engineer for any
'
revisions necessary to the 10 Year Plan. The inspector had no further
concerns and this item is closed.
~
(Closed) Unresolved Item (82-08-03): Review licensee action per IEB 79-14, j - Seismic Deficiencies (LER: 82-07, -08, -11, -12). A detailed review of r this area was performed during NRC Inspection Report 50-334/83-2 Concerns identified as a result of that inspection are being tracked as Unresolved Items 83-21-01 and -0 Since this item is redundant to those concerns, it is administratively close '
'(Closed) Unresolved Item (83-19-03): Identify cause of apparent RCS boron dilution of September,1983. Incident Report 83-51 addresses this item i and'was reviewed by the Maintenance and Operation Subcommittee of the ORC i- during the March 6,1985, meeting. The MOS detemined that the root cause
'
of the low RCS boron concentration was due to blender. operation and not the boron sampling and analysis method as originally reported. Currently, OM 1.55B.4, Periodic Checks, requires a monthly performance check of the i blender by verifying blender discharge concentration when the plant is in
'=
Modes 1 thru As this problem appears to have recurred during the last refueling outage, the licensee is currently considering whether to expand 1 this perfomance check for all modes.. Followup on this is Open Item
'(85-06-01).
(Closed) Unresolved Item (84-12-03): Ensure valves are not prestroked prior to testing for containment isolation times. The inspector reviewed
- completed copies of OST 1.1.10, Cold Shutdown Valve Exercise Test, and OST 1.47.3A, Three Month Containment-Isolation and ASME Section XI Test, and verified that guidance had been added to preclude stroking of valves prior to time measurement. This should assure that actual as-found containment isolation times are compared to appropriate acceptance criteria ,
- and corrective maintenance initiated for any valve with a closure time outside'of the limit ,
i i
t I
-- , , - - ., . _ . . - - . . . . , _ . . . - . . . .._mm,,, ,..-m...,- 4.____,,-._..m..., . - , . , , . . - , , , - , , - .-. . , , - UI
-5-
.
(0p:n) Unresolved Item (84-15-02): Provide schedule and basis for frequency of line starter PM Program. The Maintenance and Operation Subcommittee of the ORC is currently investigating the use and scheduling of preventative maintenance activities under Item MOS 83-1/A4-1. This item reamins open pending final program development by the license (Closed) Violation (85-03-01): Failure to set three pressurizer level channels with allowable values specified in Technical Specification 2.2, Limiting Safety Systems Settings. As discussed in Inspection Report 50-334/85-03, the. pressurizer water level trip ensures protection against reactor coolant system overpressurization by limiting the water level to a volume sufficient to retain a steam bubble and prevent water release to the pressurizer safety valve. The BVPS Unit 1 accident analysis takes no credit for the operation of this trip. After discussing this item with the licensee during the Enforcement Conference on February 13, 1985, NRC Regional Management detennined that it meets the criteria of 10 CFR 2, Appendix C, as a licensee identified violation. The inspector verified that appropriate revisions to the test procedures (MSP 6.41, -42, -43, Pressurizer Level Protection Channel Calibration) have been complete No further action is required and this item is close (0 pen) Unresolved Item (85-02-05): Detennine why administrative controls did not prevent the unexpected operation of the condensate pump recirc valve. On February 15, 1985, the plan + experienced a feedwater transient that resulted in a manual power reducti)n by Operations personnel to avoid exceeding DNB parameters. Initial observation of the licensee's response to the event and independent varification of technical specification compliance is documented in NRC Inspection Report 50-334/85-02. Further review was conducted by the inspector to determine what administrative controls broke down to allow the inadvertent operation of the condensate pump recirc valve (FCV-CN-101), which required operator response to avoid
an unnecessary challenge to safety system Discussions with test personnel indicated that flow transmitter FT-CN-101-3 had been scheduled for change out during the fourth refueling outage under DCP 129, SG Blowdown Demineralizers. Because the transmitter was replaced with one that did not have a sufficient range, it had to be replaced again while the plant was operating; an evolution that should present no hazard to personnel or equipment. After obtaining an equipment clearance on the portion of the instrument air system associated with FT-CN-101, the job was walked down on February 14, 1985. At that time, the valve actuator was removed from FCV-CN-101 due to unrelated work. Test personnel stated that they would have requested the same clearance points, regardless of whether or not the plant was on line. It is Operation's responsibility to decide if the work can be done under current plant conditions, and that the clearance adequately prevents unwanted system interactions. After signing "off-log only," test personnel isolated the instrument air to FT-CN-101-3 on February 15, 1985, and hooked up the dead weight tester to complete calibration. It was at this time that FCV-CN-101 unexpectedly operated (it had been returned to service the night before).
,
, - ,
-6-
.
The inspector reviewed Instrument Transmitter Rack Print AA 8700-RK-6 The print erroneously showed a straight run of line .from the instrument air isolation valve to FT-CN-101-3; it did not show a branch-off to FT-CN-101-2, which also sends a control signal to FCV-CN-101. The two transmitters are of different ranges and are selected through a logic system that differentiates between one or two condensate pump operation.-
By isolating air to both . transmitters, the recirc valve went to full open which resulted in a significant decrease in feedwater flow to the steam generators. The licensee's representative stated that an Engineering Memorandum would be issued to correct the print erro The actual transmitter calibration had been conducted under a generic station field calibration procedure, CP-020, Calibration of Pneumatic Differential Pressure Transmitter, approved February 2,1978. Unlike station loop calibration procedures, specific control flow diagrams are not show Hence, it is up to test personnel to use controlled prints to verify that the desired work can be performed under an approved equipment clearanc The inspector noted that the Technical Advisory Group was conducting an incident review of this event. This item remains open pending the conclusion of that review to determine why the instrument air print did not reflect as-built conditions and what further corrective actions might be neede (Closed) Unresolved Item (84-12-04): Review of current safety-practices for work en electrically " hot" cabinets. This item was opened for an inspector concern cealing with I&C technician work in energized electrical cabinets, that may cause damage or personnel injury due to events such as unintentional groundin :lis item was discussed again in Inspection Report 50-334/84-33 when.a similar event occurred during work in an energized emergency diesel generator load sequence I&C personnel were briefed in safety meetings that dealt with the concerns addressed above. Since the majority of I&C work is done on energized circuits (6.120V), the primary method of eliminating problems is by use of careful, cautious work practices. The inspectors reviewed the training rosters to verify that I&C personnel had been briefed about work in energized safety related circuits, and were aware of the potential problems. The inspectors feel that this concern has been properly addressed and this item is close _
~ . . . . - - =
-7-
.
.
3; 3 .- Plant-Operations _ General Inspection tours of the plant areas listed below were conducted during both day and night shifts-with respect to Technical
Specification (TS) compliance, housekeeping and cleanliness, fire protection, radiation control, physical security.and plant protection, operational and maintenance adninistrative control Control Room
- Primary Auxiliary Building
-- Turbine Building
- . Service Building
--
' Main Intake. Structure
--
Main Steam Valve Room
--
Purge Duct Room 4 --
East / West Cable Vaults
,
-- Emergency Diesel Generator Rooms
-- Containment Building
--
Penetration Areas
-- Safeguards Areas
-- Various Switchgear Rooms / Cable Spreading Room
--
Protected Areas Acceptance. criteria for the above areas included the .following:
-- BVPS FSAR
- -- Technical Specifications (TS)
-- BVPS Operating Manual (0M), Chapter 48, Conduct of Operations
--
OM 1.48.5, Section D, Jumpers and Lifted Leads
--
OM 1.48.6.. Clearance Procedures
-- OM 1.48.8, Records
-- OM 1.48.9, Rules of Practice
-- OM Chapter 55A, Periodic Checks - Operating Surveillance Tests
-- BVPS Maintenance Manual (MM), Chapter 1, Conduct of Maintenance
-
BVPS Radcon Manual (RCM)
-- 10 CFR '50.54(k), Control Room Manning Requirements i --
BVPS Site / Station Administrative Procedures (SAP)
-- BVPS Physical Security Plan (PSP)
--
Inspector Judgement f
L e
_ _ _ _ _ _ _ , __
-8-
.
.
b. Operations The inspectors toured the Control Room regularly to verify compliance with NRC Requirements and facility technical specifications (TS).
Direct observations of instrumentation, recorder traces and control panels were made for items important- to safet Included in the reviews are the rod position indicators, nuclear instrumentation systems, radiation monitors, containment pressure and temperature parameters. onsite/offsite emergency power sources, availability of reactor protection systems and proper alignment of engineered safety feature systems. Where an abnonnal condition existed (such as out-of-service equipment), adherence to appropriate TS action statements were independently verified. Also, various operation logs and records, including completed surveillance tests, equipment clearance pennits in progress, status board maintenance and temporary operating procedures were reviewed on a sampling basis for compliance with technical specifications and those administrative controls listed in paragraph 3 During the course of the inspection, discussions were conducted with operators concerning reasons for selected annunciators and knowledge of recent changes to procedures, facility configuration and plant. conditions. The inspector verified adherence to approved procedures for ongoing activities observed. Shift turnovers were witnessed and staffing requirements confinned. Except where noted below, inspector comments or questions resulting from these daily reviews were acceptably resolved by licensee personne (1) On February 20, 1985, the reactor was manually shutdown at about 6:15 a.m. in accordance .with administrative guide-
-
lines when steam generator conductivity approached 19 umho After plugging a failed tube, the reactor was restarted at about 8:15 a.m. on February 21, 1985. During the restart activities, a trip occurred due to a high level in the C steam generator. The licensee had been experiencing difficulty in balancing steam flow and feed flow due to-main condenser. vacuum problems because two out of the four water boxes were isolated (to search for the leaking condenser tube), and erratic behavior of the steam dump control system, when in the automatic mode. All safety systems functioned correctly. The inspectors observed portions of the restart effort and no further problems were noted.
,
,-. _ _ _ . - -- - g-
.
.
(2) The licensee began experiencing steam generator conductivity problems again on February 28, 1985. After exceeding the admin-istrative guideline of 7 umhos, primary power was reduced to about 35%. When it became apparent that the leaking condenser tube could not be readily identified and conductivity continued to increase, the plant was placed in Mode 2 (less than 5% thennal power) at about 8:45 p.m. on March 1,1985. After identifying and removing the failed tube, the reactor was returned to Mode 1 at about 6:15 a.m. on March 4,1985. The inspector observed startup activities to verify compliance with Technical Specifi-cations and administrative controls. No concerns were identifie During the fourth refueling outage that ended in January,1985, the main condenser had been completely retubed with a ferric alloy to alleviate manganese underpitting caused by river water chemistr Apparently, other modifications performed on the main condenser served to increase vacuum and has resulted in the steam approaching sonic velocities which in turn causes tube vibration and subsequent failures. Plans for corrective action including a one-to-two week maintenance outage are currently under development to resolve the continuing tube failure proble c. Plant Security /Physica_1 Protection Implementation of the Physical Security Plan was observed in the areas listed in paragraph 3a above with regard to the following:
-- Protected area barriers were not degraded;
-- Isolation zones were clear;
-- Persons and packages were checked prior to allowing entry into the Protected Area;
-- Vehicles were properly searched and vehicle access to the Protected Area was in accordance with approved procedures;
-- Security access controls to Vital Areas were being maintained and that persons in Vital Areas were properly authorized;
-- Security posts were adequately manned, equipped, and security personnel were alert and knowledgeable regarding position requirements, and that written procedures were available; and,
-- Adequate lighting maintaine No inadequacies were observe l
l I
__ - _ - - .
-10-
.
. Radiation Controls Radiation controls,. including posting of. radiation areas, the condition of step-off pads, disposal of protective clothing,-
- completion of Radiation Work Pemits, compliance with Radiation Work Permits, personnel monitoring devices being worn, cleanliness of work areas, . radiation control job coverage, area monitor oper-ability (portable and pemanent), area monitor calibration, and personnel frisking procedures were observed on a sampling basi No inadequacies.were noted., Plant Housekeeping and Fire Protection Plant housekeeping conditions including general cleanliness conditions and control of material to prevent fire hazards were observed in areas-listed in paragraph 3a. Maintenance of fire barriers, fire barrier penetrations, and verification of posted fire watches in these areas was also observed. No inadequacies were noted, Safety Related Tagou_ts During the week of March 11, 1985, the inspector independently verified-that the safety related tagouts in effect for the B river water pump and B charging pump were properly prepared and conducted. In each case, the C pump (swing pump) had been correctly realigned to the 1 DF emergency electrical bus .to complete the.second ESF component trai No deficiencies were note Critical-Valve Contro_1 The inspectors reviewed the BVPS Operations Department control of critical valves, which if.mispositioned could result in damage .to vital safety equipment. Designated valves are padlocked in their required position and the keys are controlled by.the Nuclear Shift Supervisor. A status log is maintained for each valve which specifies the nomal valve position, and documents the quarterly audit. Valves inside containment are verified to be correctly aligned by review of this audit, as all equipment receives a double verification of correct alignment prior to startup after an outag The inspector reviewed the valve status log and verified that all critical valves had been independently verified locked and correctly positioned as required by BVPS OM Chapter 48, and that adequate control of the keys to these valves was being maintained. A portion of the critical valve list was verified to be locked in the correct position in the field during a plant tour. Certain valves on this list are also verified each shift on station logs by Nuclear Plant Operators, per BVPS OM Chapter 54. The inspector' reviewed selected logs for 1985 to verify that these valves had
.been properly checked. No problems were observed during this inspection.
(
u.. . . . . .. . .
. . . . .
-11-
.
.
4. Engineered Safety Features (ESF) Verification
_
The operability of various ESF systems was verified by performing a walkdown of accessible portions that included the following as appropriate:
(1) System lineup procedures match plant drawings and the as-built configuratio (2) Equipment conditions were observed for items which might degrade performance. Hangers and supports are operabl (3) The interior of breakers, electrical and instrumentation cabinets were inspected for debris, loose material, jumpers,et (4) Instrumentation was properly valved in and functioning; and had current calibration date (5) Valves were verified to be in the proper position with power available. Valve locking mechanisms were checked, where require (6) Technical specification required surveillance testing was curren The following systems were so reviewed:
-
River Water System, March 4, 198 Auxiliary Feedwater System, March 6, 198 Dnergency Diesel Generators, March 13, 198 Chemical Addition System, March 14, 198 _
.
-12-
'
.
'
During the review of the Chemical Addition System (Na0H), the inspector ^
noted that Technical Specification (TS) 3.6.2.3 LCO requires: (1)
4700 i
'
.and (gallons of between 19.5 and 20.0% by weight of Na0H solution,2) four chemi
!
of adding.the solution to-the quench spray pump flow. The surveillance -
requirements verify pump operability on a 31 day frequency by manually .
j running each pump and measuring flow. The TS action statement allows *
, the chemical addition system to be inoperable for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> before
. reactor shutdown is required. This TS does not make a distinction i between the two redundant subsystems (ESF trains powered by independent
. emergency electrical sources), nor does it require the licensee to verify that each pump will start automatically on a test signal at p least.once per 18 months during shutdown, as other ESF pumps are.
'
The inspector reviewed the Standard Technical Specification (STS) !
which referred to the chemical additive tank volume concentration
of Na0H and operability of two spray additive eductors, which are passive devices that add the Na0H solution to the quench spray pump
- suction line by gravity feed. The action in the STS surveillance l- requirements parallel the BVPS technical . specifications with the
- . exception of a five year test of the solution flow rate by gravity feed which is not applicable to a system using chemical injection
- pumps. No reference is made in the STS to the chemical injection ,
pumps, because this is not a standard design feature, as verified !
, by the inspector through discussions with the residents at plants 1 ( of a similar design (subatmospheric containments). ;
} NRR safety evaluation of Amendment No. 28 to the BVPS Unit 1 Operating l'
License, dated August 27, 1980, incorporated the current requirements i of TS 3.6.2.3 to assure that a' metered amount of caustic solution was added to the containment sump for pH control and iodine scrubbing, j The evaluation considered the effects of a.. single failure to assure
! . that at least one spray of pH 11 to 8 woulo be used at all times during an accident. The current BVPS Technical Specification action
' '
. statement allows this entire system to be out of service for 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> This does not appear to be consistent with the safety philosophy applied to all other ESF systems-with redundant trains, whereby, Technical t Specification 3.0.3 allows only one hour for both redundant trains '
to be out of service.
I The BVPS updated FSAR, Section 6.4, states that two chemical injection j subsystems are electrically redundant and independent to assure that ;
! single failure-criteria is adequately addressed. It further states
, .that one chemical injection pump per loop will automatically stop
[ - on a signal from the cutback control valve in the quench spray loop :
- provided that the other chemical injection pump is running. The 18
, month TS surveillance requirements do not address the testing of this
, design feature. However, in OST 1.13.11, Quench Spray System Operability Test, DLC does incorporate the auto pump start and cutback tests as i a good operating practic l t i The inspector brought this to the attention of the Manager of Nuclear
. Safety. Detemination of whether or not a technical specification
- change is'necessary to divide the chemical addition system into ;
- respective ESF trains and provide for testing of the chemical j injection pumps automatic functions on a refueling frequency is an
! . Unresolved Item (85-06-02). !
I
-- -. -. . - - - - - - _ _ - - . - -
--
-13-
.
.
5. Problem Identif_ication Systems The inspectors conducted a review of the licensee's Problem Identification Systems to ensure that a management control system was in effect to identify problems and deficiencies in various plant activities, and ensure that such problems were tracked and resolved. Areas covered included; Operations, Quality Control (maintenance and construction),
Radiological Controls, and Testing and Plant Performanc In the Operations area, the inspector reviewed the incident report system by which equipment problems with safety related systems, procedures, and radiological control problems are investigated and reported. The inspector verified that significant events were being evaluated by the Technical Advisory Group (TAG) and that corrective actions recommended as a result of these investigations were being tracked as required. During the first two months of 1985, the volume of incident reports being generated has increased substantially over previous months. This increase in volume could possibly lead to a delay in completion of the incident reports, especially those of greater importance to plant safety. The inspectors will continue to follow the operations incident reporting system to verify that significant problems and corrective actions are prioritized and are resolved in a timely manner. This action will be tracked as Inspector Follow Item (85-06-03).
Problems encountered during the perfomance of procedures conducted by the Operations Group (OSTs) are reported as comments on the procedure cover sheet or on a separate attached comment sheet. Most of these problems must be resolved to satisfactorily complete the procedure and this may be accomplished by either of several methods: procedure changes, OMCNs for OSTs, or Maintenance Work Requests for equipment problems. Several Problems in this area are discussed in detail in Section 6 of this repor In the Quality Control area, the inspectors reviewed the licensee's system for reporting deficient conditions. This is accomplished by use of the General Inspection Report (GIR) and the Nonconformance and Corrective Action Report (NCAR) used by station QC personnel and the Nonconfomance Report (NCR) used by the station's primary contractor, Schneider Power Corporatio The inspector reviewed the file of open NCARs and GIRs for 1984 to verify that the system was functioning as intended and that corrective actions were being tracked. Several rejectable GIRs that had been outstanding for up to a year were reviewed to verify that no signi-ficant safety problems were being overlooke No problems were identifie ,
. .
'
_ -14-
.
.
t -
In the Radiological Control Area, the' inspector reviewed the Daily Surveillance Reports to the Rad-Con Supervisor for the past two months and also the radiological. problem information memos that report various system leakage problems. .These systems appear to be effective in
.
correcting the day-to-day radiological problems that occur in the plant. The inspector toured the plant to verify that the concerns of Rad-Con foreman reported to management were similar to those identified by-the inspectors on the daily tours, and that adequate corrective action was being taken on these problem The Testing and Plant Performance (T&PP) area was reviewed through a sampling of completed procedures (BYTs) conducted during the last
- refueling outage by the T&PP section. Test problems are reported during the conduct of testing on a cover sheet appended to the procedure
. and corrective action summary reported on an attached sheet. Procedure
! problems identified were logged in a readily identifiable manner and
.
the corrective actions specified were incorporated by procedure changes
! '
or recommendations for procedure improvement. Test performance problems -
-
were effectively logged and the corrective actions specified were
> . generally comprehensive and complete. No problems were identified in
- this are The inspector also reviewed the Quality Assurance (QA) audits of these
activities that were conducted in 1984. Generally, these audits satisfy the basic auditing requirements of each activity in areas
, such as personnel training, administrative procedure compliance, and corrective action reporting systems. Review of these audits revealed
'
that although they are technically adequate, they do not, in general,
.
address the root causes of identified problems, or the safety significance .
- of these problems. This function is normally accomplished by the
'
Offsite Review Committee (.0RC), per BVPS Technical Specification 6.5.2,
-
by virtue of their audits conducted by various subcommittees, e.g.,
,
s Maintenance and Operations'(PDS), and Radiological and Environmental
.
(RES). These ORC subcommittee audits are generally comprehensive and 1 provide an in-depth analysis of the performance of the specific activity, and' deal with the safety related responsibilities of these activities. The inspector had no other concerns in the area of problem
- identification.
!
i
r:
'
h I
f
'
, -,
-15-
.
.
6. Surveillance Activities The inspector conducted a review of Operational Surveillance Test (OSTs)
procedures, that were completed during the fourth refueling outag These OSTs are run every 18 months to verify operability of various ,
systems that cannot be tested during normal operations due to system conditions, conflicts and accessibility of components. The review was perfomed to verify that the testing accomplished was in compliance with the technical specification or ASME Section XI requirements,th'e test was accomplished satisfactorily with respect to data recording and procedural signoff, and that the test method appeared adequate to achieve the desired results. The procedures reviewed consisted of 18 OSTs dealing with safety related systems such as containment isolation /depressurization, safety injection, river water, auxiliary feedwater and emergency power system Numerous problems and inconsistencies were identified in the area of test performance. One problem dealt with reverification of prerequisites and initial conditions when procedure accomplishment was conducted over long periods of time, or significant delays were encountered. In certain instances, a second copy of the procedure would be filled out to reverify initial conditions when perfonning a test of the second train of a given system after a significant delay, but this was not true for all procedure It was often difficult to verify that the proper initial conditions or prerequisite steps were still in effect when the procedure was completed for the second train. In another case, a portion of a procedure to verify operability of safety injection accumulator isolation valves was accomplished by an entry in the NSS log without a record of verification of initial conditions required by the procedur A second problem dealt with logging equipment failures or equipment unavailability due to equipment clearances that were identified during procedure accomplishment. The method of recording these problems and .
logging final resolution was not always consistent or clear as to how the problem was resolved. Sometimes, these problems were logged on the OST cover sheet with corresponding corrective action specified, but at other times, the problem was noted on a page in the procedure, making it difficult to determine what corrective action was accomplishe A review of BVPS-1 Station Administrative Procedures and the administrative requirements of the BVPS Operating Manual revealed that there were no specified guidance or requirements for accomplishment of the 18 month operational tests. It appears that such guidance concerning procedure conduct, problem legging and resolution is needed for these test Additional licensee action in this area will be tracked as Unresolved Item (85-06-04).
Review of completed Maintenance Surveillance Procedures for instrument calibration and testing, and Beaver Valley Tests of equipment for plant perfonnance, indicated that these tests are performed in a very structured manner. As the problems noted above appear to be limited to only the 18 month frequency OSTs, the inspectors had no further concern *
.
7. Modification' Activities The B charging pump (CH-P-1B) has been out of service since plant startup from the fourth refueling outage, to complete modification work under DCP 286, Charging Pump Vibration Supports. This design change had been initiated to address problems encountered with Pacific Centrifugal Charging / Safety Injection Pumps as first identified in Westinghouse Technical Bulletin NSD-TB-78-1, Rev.1, dated May 1,1979. Apparently, resonant frequency problems were experienced on the thrust bearing end (drip pocket) of the first generation charging pumps. Weights were added as a temporary fix to dampen the vibration. DCP 286 performed a long term corrective action which included welding ribs as a vibration support on the B and C charging pumps, and removing the dead weights to improve vibration characteristics. This increased the stiffness of the charging pump drip pockets supporting the thrust bearing housing. The 1A charging pump was of a later generation design which did not require the dead weight or vibration modifications. The C charging pump modifi-cations had been accomplished prior to the fourth refueling outage without problem While welding the stiffener bars on CH-P-1B, a linear indication was observed by Quality Control inspectors. The initial indication was located on the quarter inch land near the face of the discharge hea Further inspection found two additional indications. The licensee obtained a reworked discharge head from the vendor and installed it during the week of March 4, 198 At the close of this inspection period, post-maintenance testing, consisting of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> pump run, was delayed due to low pressure shaft seal leakage. Discussions with personnel perfonning the work indicated that this was due to differences in manufacturing tolerances between the existing seal housing components and the new seal packag The licensee has contacted the vendor for guidanc The licensee's engineering staff infonned the inspector that when work is completed on CH-P-1B, a second liquid penetrant examination will be performed on CH-P-lC to ensure that a similar indication had not been missed during the original inspection. The inspectors had no further concern *
.
i 8. Of_fsite Review Committee To' verify that the Offsite Review Committee functions were conducted in accordance with Technical Specification 6.5.2, the inspectors attended the quarterly meeting on March 6,1985. The ORC composition, quorum, and meeting frequency met the technical specification requirement Various subcommittee review reports were submitted to the ORC for review that contained detailed information of their review of the respective assigned areas (such as maintenance and operation, radcon, engineering and audit). From inspector's knowledge of events occurring in the past quarter, it was verified that reportable events, significant operating abnomalities or deviations from normal expected perfomance of plant equipment that affect nuclear safety, and recognized indications of unanticipated deficiencies in some aspect of operation of safety-related structure systems or components were discussed. The inspectors identified no concern . Rev_iew of L_icensee_Ev_ent Repo_r_ts (LERs)
The inspector reviewed LERs submitted to the NRC:RI office to verify that the details of the event were clearly reported, including the accuracy of the description of cause and adequacy of corrective actio ,
The inspector determined whether further information was required from-the licensee, whether generic implications were indicated, and whether the event warranted onsite followup. The following LERs were reviewed:
..
-- LER: 85-0l* Startup Prior to Establishing Containment Integrit LER: 85-02** Reactor Coolant System Leakag LER: 85-03** Inadvertent Reactor Trip and Safety Injectio LER: 85-04 Auxiliary Feedwater Pump . Spurious Auto-Star LER: 85-05 Failure to calibrate PORV Isolation Valve Limit Switc *This item was discussed in special NRC Inspection Report No. 50-334/85-03.
'
- These items are discussed in Inspection Report 50-334/85-0 .- -- . _ . - - . - . _ . .- - - - - . -. _-
. --
-18-
.
LER: 85-04 identified two instances where the B motor driven auxiliary feedwater pump auto-started without an apparent actuation signal. At the time of the incident, two maintenance surveillance procedures were in progress involving Bus 1 DF undervoltage protection testing and plant process signal sensor perfonnance monitoring, which had been performed without any previous
.similar event. From a review of the six pairs of contacts in the feedwate-pump control circuitry (benchboard control switch, emergency shutdown panel control switch, relays 62-VF-ll6, K611, K634, and 3-AFPB), the licensee was unable to identify the cause for the auto-start. Neither the benchboard
'nor the emergency shutdown panel control switches were actuated. Since Relay K611 contacts are closed it was determined that this was not the sourc Likewise, Relay K634 contacts are closed by any two or three level channels
_in any two steam generators indicating a low-low level. Since this condition
- did not occur, misoperation of this relay is not expected. The contacts on two other relays, 62-VF-ll6 and 3-AFPB, close on either a trip of all main feedwater pumps or a failure of the turbine driven auxiliary-feedwater pump to start. Again neither of these conditions occurred and the station con-cluded that the auto-start signals were spurious and self-clearing. This
'
item has been entered into the licensee's tracking. system should any similar events occur in the futur LER: 85-05 concerns Maintenance Surveillance Procedure MSP 6.67, that was'
prepared in June, 1982, and was never entered into.the Maintenance Planning System for-accomplishment. During this period of time', DLC was in the. process of assuming responsibility of maintenance scheduling which at the time was accomplished by a contractor. It appears that during this transition MSP ,
.6.67 failed to become included in the Maintenance Planning System. Since that time, procedures written by the station procedures section for main-tenance activities are distributed to the planning and scheduling section for inclusion in the appropriate schedule. In addition to this, the plan-ning and scheduling section has been assigned to conduct a semi-annual re .
view of.the MSP index against the Maintenance' Planning System to ensure that all existing procedures are scheduled. The inspectors will track this actionsasInspectorFollowItem(85-06-05) to verify that the s'bject u re-views are complete .. .,_ ._ .. . . . . . . . . . . . . . _ _ _ . . . . . . _ . . . . . ._ . . _ . _ _
. _ . .
I
'
\ '
F R
g 19 f
( 10. Maintenance Program a. Review t
k The inspector reviewed the administrative program established for cor-rective and preventive maintenance. The inspector reviewed Station Ad-ministrative Procedures, Chapter 8, Maintenance, Revision 8, and Chapter I- 30, Maintenance Work Request, Revision 1, which establish the maintenance
'. program and describe the processing of Maintenance Work Requests (MWRs)
for corrective maintenanc The inspector reviewed the maintenance organization and its operation with the Maintenance Supervisor, who stated that the organization is structured into three groups, electrical, mechanical, and support. He also stated that the organization had 19 electricians, 34 mechanics, 4 welders, and 3 machinists plus the supervision, engineering, and manage-ment needed to support these workers. The Supervisor also noted that the maintenance organization had experienced a relatively high turnover g in the worker ranks during the fall of 1984 due to a company worker re-1 assignment, or " bump". The bump had occurred due to the decommissioning
- of Shippingport Atomic Power Station (SAPS) and the early retirement
'
program offered by the company, and had involved the realignment of union personnel based on their trade level and seniorit , The inspector reviewed ten completed MWRs to verify that administrative requirements for corrective maintenance of safety related equipment were
,
being met. The inspector also reviewed the corrective maintenance pro-cedures which specified the work on the above MWRs. The inspector con-cluded that the procedures were thorough and properly written and that they contained numerous hold points for quality control inspection The inspector observed maintenance work in progress under MWR 842312 for River Water Pump 1B repair, MWR 842598 for Reactor Plant Component Cool-ing Water Pump 1A overhaul, and MWR 850600 for 4160 Volt Breaker AE4 repair to verify that the work had been properly reviewed and approved, the equipment had been tagged out of service properly, and the worker was qualified to perform the given tas The inspector reviewed the interface between quality control (QC) and maintenance with the Quality Control Supervisor. He stated that QC in-spectors have few problems in being notified of the maintenance work and that occasions when hold points are being bypassed are rare. The QC inspectors note unacceptable work in their General Inspection Reports
} (GIRs) as "rejectables", and then the hold points are not released until the problems are corrected. The rate of rejectables in GIRs during 1984 was 7% and fairly consistent between outage and non-outage. The super-visor stated that he has not observed any decrease in the quality of maintenance work due to the turnover of the bump and attributed this to the high skill level of newer employees and the nuclear experience at
[ SAPS that many workers ha a
,
h e
l
. . . - . . . ., -~ .. . - . - - - - - - . . .- , ~ - . . . - . -
+
_
-
+ ,
,
, . . . .
, '
,
- 20
- .
I .
-
V ' The inspector-. reviewed the Outgoing Engineering Memorandum Log .to assess-w - ' 'the communications between maintenance and engineering personnel. The
,
'
inspector found.that in the first-three months of 1985, 116 menos were
~
,
written by, maintenance and that responses by engineering were timely, '
L often in a few days to support urgent maintenance needs.
'
The inspector reviewed the' qualification program for welders and welding
. procedures', including Welding Manual Procedures 1.1, MWRs Requiring Weld-
-
3 'ing, .and 1.2, Qualification of Welding Procedures and Welders, and the i.
--
documentation to support the qualification R
[ , The inspector reviewed the control of measuring and test equipment used
- * ' " by electricians and mechanics, including the equipment storage areas.'
~
.Also, the' inspector toured the shop area '
'
'The inspector reviewed the master schedule for preventive maintenance,
'
'
selected preventive maintenance procedures, and status reports of pre-
,
ventive maintenance work completio The inspector reviewed the computerized equipment history files and the
'
i
,
files of. completed MWRs organized by syste i
- The inspector reviewed the on-the-job (0JT) training program recently
+
instituted, including Maintenance Manual Section U, Maintenance On-The-
- Job Training Program, and records of completed trainin ;
'
(b' Findings
!' .
The inspector found the licensee's/ program for preventive and corrective
'
- maintenance to be acceptably. performing its assigned functions subject to the following concerns:
i The licensee's February 1985 Maintenance Trend Monitoring Report
'shows that the trend of backlogged MWRs in the mechanical group have -, ;
e increased by over 50% over the last nine months. Also, it shows that backlogged preventive maintenance procedures (PMPs)'in the
< mechanical group have increased from 3% to 20% over the last six months. Further,:these levels'of backlogged work exceed targeted
.
goals. Although both the refueling outage in late 1984 and the
> company-wide' laborer bump'in 1984,could have effected the mechanical groups's work performance, the inspector.-noted that the electrical
.
- group-also experienced these effects-and that their backlogged MWRs i 'and PMPs had remained relatively stable and within targeted goal + In a March 14 discussion with the. inspector, the station superin- .
-tendent stated that licensee management was aware of the adverse
'
trend of backlogged work in the mechanical group and that specific management action would be taken in the'near future if the trend'
continues. ,The, inspector' stated that although'the current levels
'
_
),
$ ;
i -
p
'
1 -- . . .
--,-.~.-..nr._...-----,,,--.n-._,.--. ._-m-,.,, n,., -
-- _
. - -
,
.
of backlogged work-were not unacceptable, the continuance of the increasing trend could adversely affect the licensee's maintenance progra This item (85-06-06) is unresolved pending licensee action to reduce backlogged work in the mechanical maintenance are . The inspector found MWR 830709 for valve HCV-MS-104 on the Residual Heat Removal System, on which work had been completed on August 14, 1983, but the final review of the MWR paperwork was still in pro-gress.- Also, the MWR Tracking Report of March 12, 1985, showed the mechanical group has 244 MWRs listed as Complete Awaiting Paper (CAP), i.e. , work completed but review in progress. Based on the above examples, the inspector concluded that some MWR paperwork reviews are taking an undesirably long time. Although no regulatory requirements cover the time period of this review, such long times before MWR data is entered into equipment histories could hinder repetitive problem identification and corrective action. The in-spector noted that no items in the Monthly Maintnenace Trend Moni-toring Report addressed this are This inspector followup item (85-06-07) is open pending licensee action to achieve timely reviews of completed MWR . Exit Interview s
Meetings were held with senior facility management periodically during the-course of this inspection to discuss the inspection scope and findings. A summary of inspection findings were further discussed with the licensee at the conclusion of the report perio .