OPERATING DATA REPORT DOCKET NO. 50-269 DATE 07/16/86 CO3tPLETED BY _ J.A. Reavis TELEPil0NE 704-373-7567 OPERAT'NG STATUS
- 1. Unit Name: OC "** 1 b
- 2. Reporting Period: June 1, 1986 - June 30, 1986 Year-to-dato and cumulative
- 3. Licensed Thermal Power (.\lWt): 2568 capacity factors are calcu-
- 4. Nameplate Rating (Grosi31We): 934 lated using a weighted
- 5. Design Electrical Rating (Net alWe): 886 a m age for ma d um ,
- 6. .\laximum Dependable Capacity (Gross .\tWe): 899 dependable capacity.
- 7. Slaximum Dependable Capacity (Net $1We): 860
- 8. If Changes Occur in Capacity Ra:Ings (Items Number 3 Through 7) Since Last Report. Give Reasons-Nono
- 9. Power Level To which Restricted. lf Any (Net .\tWe): M~
- 10. Reasons For Restrictions. lf Any:
This alonth Yr..to Date Cumulative
- 11. Hours in Reporting Period 720.0 4 343 0 113 592.0
- 12. Number of Houn Reactor Was Critical 720.0 2 174.9 82 621.2
~- -~
- 13. Reactor Reserve Shutdown flours ~~
- 14. Hours Generator 0n.Line 72n.n 2 1 1 c; . 6 70 249.2
- 15. Unit Resene Shutdown Hours --- --- ---
- 16. Gross Thermal Energy Generated (alWil) 1 851 425 5 208 521 191 508 721
- 17. Gross Electrical Energy Generated (31WH) 641 090 1 807 470 66 554 310
- 18. Net Electrical Energy Generated (.\tWH) 612 534 1 705 894 63 104 143
- 19. Unit Service Factor 100.0 48.7 69.8
- 20. Unit Assilability Factor 100.0 48.7 69 6
- 21. Unit Capacity Factor (Using SIDC Net) 96 9 45.7 64 5
- 22. Unit CJpacity Factor (Using DER Net) 96.0 44 3 02 7
- 23. Unit Forced Outage Rate 0.0 11.8 14.6
- 24. Shutdowns Scheduled Oier Nest 6 alonthsIType.Date,and Duration of Eacht:
mnn
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Unitiin Test Status (Prior to Commercial 0peration):
- Forecast Achined INITI \ L CRITICA LliY INITIA L ELECTRICITY C0\l\lERCIAL OPER A T10N
/
R S
AVERAGE DAILY UNIT POWER LEVEL 4
DOCKET NO. 50-269 UNIT Oconee 1 DATE _07/15/86 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 M0i4TH .1, ,n n . togs DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) (MWe-Ne t)
.' I 855 17 852 2 8ss 18 as2 3 855 19 852 4 d54 20 851
. 5 854 21 851 6 853 22 850 7 854 23 850 8 853 24 849 9 854 25 837 10 8s, 26 849 11 853 27 830 12 853 28 850 13 852 29 848 14 853 30 849 15 853 31 16 851 INSTRUCTIONS On this format, list the overage daily unit power level in HWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
F
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-269 UNIT NAME oconee 1 -
DATE 7/15/86 REPORT MONTH June 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.
o e o o,$ License y Cause & Corrective 22 "co u .c a a 5e e
No. Date ~.a g h.
'o e pg, Event y, h Action to u=x my y N SE E $5S Report # NO $8 Prevent Recurrence .
29-p 86-06-25 F --
A -
HH l'UMPXX "lDl" Heater Drain Pump Tripped 30-p 86-06-27 S ,
B -
CC VALVEX Turbine Control & Stop Valve Movement PT's 31-p 86-06-27 F --
A -
IF INSTRU '-Integrated Control System Uni *. Load Demand. Problem i
[
t
/
1 1 2 3 4 Reason: . Method: Exhibit G - Instructions SS e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets-for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 6 License Examination F-Administrative S G-Operational Error (Explain) Exhibit I - Same Source en ,, ,
H-Other (Explain)
DOCKET NO: 50-269 UNIT: Oconee 1 DATE: 7/15/86 NARRATIVE SUb9fARY Month: June. 1986 The unit began the month at 100% power and operated at that level until June 25th, when the IDI Heater Drain pump tripped. Power was reduced to 90% in order to stabilize the system. The pump was placed back in service and the unit returned to 100% and remained there for the balance of the month.
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee, Unit 1
- 2. Scheduled next refueling shutdown: July, 1987
- 3. Scheduled restart following refueling: September, 1987
- 4. Will refueling or resumpticn of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 1,020*
- 8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 l
1 l
DUKE POWER COMPANY DATE: July 15, 1986 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
I
OPERATING DATA REPORT DOCKET NO. 50-270 DATE 07/15/66 COMPLETED BY J.A. Reavis ~
TELEPIIONE 704-373-7567 OPERATING STATUS
- 1. Unit Name: Oconee 2 Notes
- 2. Reporting Period: June 1. 1986 - June 30, 1986 Year-to-date and cumulative
- 3. Licensed Thermal Power 151Wt): 2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross SIWE): 934 lated using a weighted
- 5. Design Electrical Rating (Net SIWE): 886 average for maximum
- 6. Staximum Dependable Capacity (Gross alwe): 839 dependable capacity.
860
- 7. Maximum Dependable Capacity (Net SlWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
None
- 9. Power Level To which Restricted. if Any (Net MWe): None
- 10. Reasons For Restrictions. If Any:
I w
This alonth Yr to.Date Cumulative 7
i1. Ilours In Reporting Period 4 343.0 103 512.0
- 12. Number Of Hours Reactor Was Critical 720.0 4 334.9 77 172.6
- 13. Reactor Reserve Shutdown flours
- 14. Hours Generator On-Line 720.0 4 321.9 75 923.4
~~~ --- ~~~
- 15. Unit Resene Shutdown flours
- 16. Gross Thermal Energy Generated (MWil) 1 834 785 11 029 663 181 433 566
- 17. Gross Electrical Energy Generated (MWil) 618 310 3 749 470 61 80! 811
- 18. Net Electrical Energy Generated (MWil) 591 150 3 589 284 58 756 845
- 19. Unit Service Factor 100.0 99.5 73 4 i 20. Unit Asailability Factor 100.0 99.5 73 4
- 21. Unit Capacity Factor (Using SIDC Neti 95 5 96.1 65.6 i
- 22. Unit Capacity Factor IUsing DER Net)
~
92.7 93 3 64.1
- 23. Unit Forced 0utage Rate 0.0 . 05 13 2
- 24. Shutdowns Scheduled Oser Nest 6 Months IType. Date,and Duration of Each1:
Refueline - August 14. 1986 - 9 weeks j
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiescd INITI A L CRITICA LITY INITI A L ELECTRICI TY C0\lMERCIAL OPER A TION (9/77) 1
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-270 UNIT Oconee 2 i
DATE 07/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567
- MONTH June, 1986 i
DAY AVERAGE DAILY POWER LEVEL DAY i
j AVERAGE DAILY POWER LEVEL (MWe-Ne t)
(MWe-Net) i 1 829 17 826 2 754 18 826
.3 830 19 825 4 830 4
20 825 5 827 21 825
- 6 806 22 824 i 7 830 23 823 8 829 24 768 I
9 828 25 822 10 829 26 824 i -
I 11 827 27 824 12 826 28 823
- 13 827 29 823 i
14
) 827 30 822 15 827 31 16 825 l
INSTRUCTIONS On this format, list in the reporting month. the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
+ , . ... , . , . .a. - .~-_m. - , , . ,- . , . . , , , _ _ _ , , ,__-._m,.m.,, ,,,._e -..m ,, .. # - .-. -
-_ _ _ - _ - _ _ __-_ __ - __ -=
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-270 UNIT NAME oconee 2 .
DATE 7/15/86 REPORT MONTH June 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 1 "s_
O c 'a en$ License y Cause & Corrective 32 "c o5E
- 8 No. Date % %h 5S g jgc
%55 Event h gin, Action to
- $ o- E a: :c m o Report # EE mo 83 oa Prevent Recurrence .
26-p 86-06-01 F --
A -
HB HTEXCH Second Stage Reheater Valved Out 27-p 86-06-02 F --
H -
SF ZZZZZZ Core Flood Tank Low Boron Concentration 28-p 86-06-02 F --
A -
HB HTEXCH Second Stage Reheater Valved Out 29-P 86-06-05 F --
A -
HH PUMPXX "2E2" Heater Drain Pump High Bearing Temperature 30-P 86-06-05 F --
A -
HB HTEXCH Second Stage Reheater Valved Out 31-p 86-06-06 S --
B -
CC VALVEX Turbine Valve PT's 32-P 86-06-06 F --
A -
HB HTEXCH Second Stage Reheater Valved Out 33-p 86-06-24 F --
A -
CA INSTRU Runback Caused by Blown Fuse in Control l Rod Drive Cabinet 34-P 86-06-24 F --
A -
HB HTEXCH Second Stage Reheater Valved Out i
t a-1 2 3 4 Reason: Method: Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee '
C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 4 License Examination F-Administrative S G-Operational Error (Explain) Exhibit I - Same Source
,en ,,m H-Other (Explain)
DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 7/15/86 NARRATIVE
SUMMARY
i Month: June 1986 The unit began the month at 100% power, but on June 2nd a shutdown was initiated because the Boron concentration in the "B" Core Flood Tank was below Technical Specification. The unit had dropped to 75% before the concentration of Boron in the tank was back in spec. The unit returned to 100% and operated at that level until June 24 when a fuse in the Control Rod System failed and indicated the loss of the Group 2 rods. An automatic runback brought power to 58%. The fuse was replaced and the unit returned to 100% that day, where it remained for the balance of the month.
1 l
l I
l
[
I, l
t
,- --r e -r- e-- -- ,, .y, .. e . - - - - - - .
MONTHLY REFUELING INFOPMATION REQUEST
- 1. Facility name: Oconee, Unit 2
- 2. Scheduled next refueling shutdown: August, 1986
- 3. Scheduled restart following refueling: October, 1986
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 1,020*
- 8. Present licensed fuel pool capacity: 1,312 Size of requested or planned increase: ---
l 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 l
DUKE POWER COMPANY DATE: July 15, 1986 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined totals for Units 1 and 2.
OPERATING DATA REPORT DOCKET NO. 50-287 DATE 07/15;/86 CO31PLETED BY lA. Reavis TELEPHONE - 704-373-7567 OPERATING STATUS
- 1. Unit Name: oconee 3 Notes
- 2. Reporting Period: June 1, 1986 - June 30, 1986 Year-to-date and cutaulative
- 3. Licensed Thermal Power (31Wr): 2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross SIWE): 934 lated using a weighted
- 5. Design Electrical Rating (Net 31We): 886 average for maximum
- 6. 31aximum Dependable Capacity (Gross alWe): 899 dependable capacity.
- 7. blaximum Dependable Capacity (Net 31We): 860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted,If Any (Net SIWE):
- 10. Reasons For Restrictions,if Any:
l This 31onth Yr.-to Date Cumulative II. Hours In Reporting Period 720.0 _
4 343 0 101 159.0
- 12. Number Of Hours Reactor Was Critical 720.0 4 339.8 73 711.2
- 13. Reactor Reserve Shutdown Hours --- ---
- 14. Hours Generator On-Line 720.0 4 319 3 72 451.8
~~~
- 15. Unit Reserse Shutdown Hours --- ~~~
- 16. Gross Thermal Energy Generated (31WH) 1 820 609 10 925 504 177 593 950
.17. Gross Electrical Energy Generated (31WH) 615 110 3 761 620 61 289 674
- 18. Net Electrical Energy Generated (31WH) 588 274 3 604 626 58 383 983
- 19. Unit Service Factor 100.0 99.5 71.6
- 20. Unit Availability Factor 100.0 99.5 71.6
- 21. Unit Capacity Factor (Using 31DC Net) 95.0 96.5 67.0
- 22. Unit Capacity Factor (Using DER Net) 92.2 93.7 65.1
- 23. Unit Forced Outage Rate 0.0 0.6 13.8
- 24. Shutdowns Scheduled Over Next 6 31onths (Type. Date.and Duration of Eacht:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITI AL ELECTRICITY CONI.\lERCIA L OPER ATION (0/771
~ . . _ . _ . _ - . . _ _ _ _ _ _ _ - ._. , _ . - . _ , _ . _ . _ _ _ _ _ _ ____ __ _
AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO. 50-287 UNIT . oconee 3 DATE 07/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH june. 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 827 17 823 2 826 18 823 3 828 19 823 4 827 20 807 5 826 21 821 6 826 22 819 7 826 23 819 8 825 24 820 9 825 25 819 10 826 26 820 11 825 27 809 12 825 28 668 13 824 29 814 14 825 30 819 15 824 31 16 824 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. so-9a7
, UNIT NAME oconee 3 DATE 7/15/86 REPORT MONTH June 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.
O c o oi g License y Cause & Corrective S2 "cg o .c g a e No. Date ~
o %h 3yc Event h h Action to Report # hb bb Prevent Recurrence .
16-P 86-06-20 S --
B -
CC VALVEX Turbine Valve PT's 17-p 86-06-27 F --
A -
HC HTEXCH Condenser Tube Leak 18-p 86-06-28 F --
A -
HC XXXXXX Vacuum Decrease 19-p 86-06-28 F --
A -
HC HTEXCH Condenser Tube Leak
~-- - -_-
1 2 3 4 Reason: Method: Exhibit G - Instructions SS e uled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 4 License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source e n ,, .,s H-Other (Explain)
DOCKET NO: 50-287 UNIT: Oconee 3 DATE: 7/15/86 NARRATIVE
SUMMARY
Month: June 1986 The unit began the month at 100% and operated at that level until June 27 when power was reduced to 85% to plug tubes in the Main Condenser. The unit was back at 100% on June 29 where it remained for the balance of the month.
I k
t I
I l
l
-. . . , - - . - ~ , , . _ _ _ . ~ . . _ - , . . . _ . . _ _ _ - , _
_ . _ . . . - . , _ _ _ _ _ . - . , - . _ - . - - . ~ . - . . . _ . . - . . _ _ _ _ , _ . _ - . . _ _
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee, Unit 3
- 2. Scheduled next refueling shutdown: January, 1987
- 3. Scheduled restart following refueling: March, 1987
- 4. Will refueling or resumption of operation thereafter require a technical specificatien change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 465
- 8. Present licensed fuel pool capacity: 875 Size of requested or planned increase: ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 1991 DUKE POWER COMPANY DATE: July 15, 1986 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
t OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT .
- 1. Personnel Exposure For the month of May, no individuals exceeded 10 percent of their allowable annual radiation dose limit.
- 2. The total station liquid release for May has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for May has been compared with the i Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
4 1
4
, _ . _ . _ _ . _ _ _ _ _ _ _ . - - , _ , . ....m , _ _
, ___ . _ _ _ , _ - , _ ,-,,,-r , _ __
DUKE POWER GoxPAxy P.O. nox 33180 CHARLOTTE, N.C. 28242 HALH.TUCHER TELEPHONE wtI*' [m m ,EEE July 15, 1986 Director Office of Inspection and Enforcement.
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: Oconee Nuclear Station Docket No. 50-269, -270, -287
Dear Sir:
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of June, 1986.
Very truly yours, Hal B. Tucker JAR: sib Attachment xc: Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II i
101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Phil Ross
! U. S. Nuclear Regulatory Commission MNBB-5715 Washington, D. C. 20555 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032
.i r 6>
E i) i 1
i
. l Dir cter July 15, 1986 Page Two xc: INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 Ms. Judy Dovers ,
Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 Ms. Helen Pastis, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comunission Washington, D. C. 20555 i Mr. J. C. Bryant NRC Senior Resident Inspector Oconee Nuclear Station
(
l l
-.-. - - - - - -