Public Version of Emergency Plan Implementing Procedures, Including EPIP-RR-19, Emergency Recovery Organization Operations Support Manager & EPIP-RR-26, Emergency Recovery Organization Environ Survey & Analysis Supervisor
ML20207E799
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/15/1986
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20207E789 List:
References
PROC-861215-01, NUDOCS 8701050096
Download: ML20207E799 (15)


Text

{{#Wiki_filter:.

                            .               _ . . . _ _ .      _         .                   _ _ _      _    _ ... . .          . . .. . , _ .     .. _ . _ . _ _         y. ....                               ..

EPIP-RR-19-1 Fort Calhoun Station Unit No. I

h. '

Emergency Plan Implementing Procedure EPIP-RR-19 EMERGENCY RECOVERY ORGANIZATION'S OPERATIONS SUPPORT MANAGER _. . I. PURPOSE The. purpose of this procedure is to detail assignment and i i responsibilities of personnel in the Emergency Recovery Organization filling the position of Operations Support Manager II. PREREQUISITE Both primary and alternate individuals filling the position of Operations Support Manager have been fully trained and are aware of their duties and responsibilities. III. PRECAUTIONS None {v. q IV. PROCEDURE _, _Upon activation of the Emergency Recovery Organization, those individuals assigned to the position of Operations Support Manager shall carry out this assignment as detailed in Appendix 1 of this implementing procedure. 8701050096 861215  %' _ . _ . _ _ _ _ PDetssee ADOCK 05000258 PDR F I ~ i '.' " C FC/EPIP/02 R5 4-30-86 l .- . - - - . - - - - -- - _ . _ _ - _ _ _ . _ _ __ __ _ _ _ , _ _ _ _ . _

g, EPIP-RR-19z2

                                                                                                                               ~

Fort Calhoun Station Unit.No.1 Emergency Plan Implementing Procedure EPIP-RR-19 APPENDIX 1

                                                                                                                                   ]

OPERATIONS SUPPORT MANAGER A. Personnel Assignment Primary (Job Title) Supervisor Operations - Fort Calhoun Alternate (Job Title) Supervisor Station Training, or Nuclear Production Engineer-Fort Calhoun l B. Reporting location Operations Support Center .

C. Reports To Site Director D. Supervises / Coordinates
1. Normal Plant Operations personnel
2. Nuclear Production Engineer
3. Callout Operators E. Primary Responsibility .

Responsible for the safe operation of the plant. This will require the individual to implement normal and emergency procedures and instructions to bring the plant to a safe shutdown, if required. F. Basic Duties

1. Upon notification of Emergency Recovery Organization activation, the primary and/or alternate Operations Support Manager designate (s)

I will report to their assigned location listed in Section B of this , appendix and inform the Plant Operations Manager of their/his presence. 4

2. Calls out his staff detailed in Section D of this appendix and has them report to the Operations Support Center in order to support on-site activities.
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

_y I i 55UEC APR 3 01986 as 4-30-86 FC/EPIP/02 l j 9 we- w a g.. ,e.. , e e ~ g .==.-

 " ' '
  • an deusee.w e e - e --e,- een-e
                   .. . , - . . - - .           ... -... .           ........-....:.:...     .a . . . ..: _.E .z . .                ... . . .c. e EPIP-RR-19-3 F.       Basic Duties (Continued)
 .{ s_                   4.          Reports the manpower status to the Site Director.
5. Directs the activities for personnel.
6. Ensures that plant operations personnel are in compliance with all plant procedures, directives, technical specifications and emergency plans.
7. Responsible for monitoring plant parameters and conditions. - - . . .
8. . Responsible for system valve alignment and equipment operations.
9. Ensures proper interface with the Operations Group and other members of the Emergency Recovery Organization in support of the recovery operation.
10. Provides inputs to Site Director regarding the current status of the --

recovery operation. Or Q.' l 135UED

                                                                                                                                                           -^

APR 3 01986 g3 4_3g_gg

       ,         FC/EPIP/02                                                                                                                         ,

l

, ., . . . _ _ . . . . . . _ _ . . _ . . _ . . . ._ .. _ z_ , .. . cu. . ,,;._._ .. .[..,,_,,,,,,._

                    .e .                                    ,
                                                                                   .                                        EPIP-RR-26-1
            ~

Fort Calhoun Station Unit No. 1 (, Emergency Plan Implementing Procedure EPIP-RR-26

                                                                                                                                                 ~

EMERGENCY RECOVERY ORGANIZATION'S . ENVIRONMENTAL SURVEY and ANALYSIS SUPERVISOR

     ....         I.          PURPOSE The. purpose of this procedure is to detail assignment and responsibilities of personnel in the Emergency Recovery Organization filling.the. position of Environmental Survey and Analysis Supervisor.                               .

II. PREREQUISITE Both primary and alternate individuals filling the position of Environmental Survey and Analysis Supervisor have been fully l trained and are aware of their duties and responsibilities, i III. PRECAUTIONS None

                     ~
          )

IV. PROCEDURE Upon activation of the Emergency Recovery Organization, those individuals assigned to the position of Environmental Survey and Analysis Supervisor shall carry out this assignr.ent as detailed in Appendix 1 of this implementing procedure. (.. ISSUED - P.R 01986 FC/EPIP/03 R2 04-30-86 ,

7 EPIP-RR-26 _2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure p. EPIP-RR-26 . v' APPENDIX 1 . ENVIRONMENTAL SURVEY and ANALYSIS SUPERVISOR A. Personnel Assignment Primary (Job Title) By Recovery Manager Designation Alternate (Job Title) , By Recovery Manager Designation B. Reporting Location Emergency Operations Facility C. Reports To Emergency Coordinator D. Supervises / Coordinates Chemical and Environmental Technical Services Department ^ Site Representative - Logan Site Representative - Des Moines E. Primary Responsibility Provides for environmental sampling and testing in areas affected by radiological releases to ensure public health and safety are not jeopardized. F. Basic Duties J

1. Upon notification of Emergency Recovery Organization activation, l the primary and/or alternate Environmental Survey and Analysis Supervisor designate (s) will report to their assigned location I listed in section B of this appendix and inform the Emergency Coordinator of their/his presence.
2. Calls out his/her staff detailed in section D of this appendix and l has them report to their normally assigned department in order to support on site activities.
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations. _
4. Reports the department's manpower status to the Emergency Coordinator. -

ISSUED FC/EPIP/03 R2 04-30-86 APR 3 01586 _ _ _ . - _ . . _ . . . . . . . .__ . _ _. . . , = .

          . . .                 -_ . ,  - _ _ _ _ . . _ . . . . . . __   __ __   m _ ; _ . _, s. m . . . .&,_     . . _ ; .2 . , . ,     . _ ,

EPIP-RR-26-3 F. Basic Duties (Continued)

5. Oversees the collection of environment samples in affected areas and ensures that the analyses are being performed by contractor laboratories. Normal samples obtained are:

(a) Air Samples (b) Milk Samples (c) TLD Badges (d) Surface Water Samples

                               .6. Determines if the sample results are out-of-normal by using previously analyzed routine samples as baseline.                                                      .
7. Logs all results and provides continuous up-to-date information to Emergency Coordinator.
8. Collects all onsite and offsite environmental TLD's and ensures they are transported to the Dosimetry Coordinator or contractor laboratory.
       ~,

l 4 ISSUED FC/EPIP/03 R2 04-30-86 s APR 3 01986 3

                             -~. L.                        .           .. .                                .    ._......__a._.                    _ . ,       . _ __
                       /,                                        .
                                                                                  .                                                            EPIP-RR-51-1 1
                                 .                                   Fort Calhoun Station Unit No. 1                                               ..

f Emergency Plan Implemanting' Procedure EPIP-RR-51

                                                                                                                                                                                       ~

EMERGENCY RECOVERY ORGANIZATION'S DIRECTOR OF CONSTRUCTION

                           .         PURPOSE The purpose of this procedure is to detail assignment and                                                               '~                      '

responsibilities of personnel in the Emergency Recovery Organization filling the position of Director of Construction, II. PREREQUISITE Both primary and alternate individuals filling the position of Director of Construction have been fully trained and are aware of their duties and responsibilities.

                                                                                                                                                                ~

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Emergency Recovery Organization, those individuals assigned to the position of Director of Construction shall carry out this assignment as detailed in Appendix 1 of this implementing procedure. C ~ ISSUED , FC/EPIP/02 R3 04-30-86 4

                                                                                                                                                          ,_        _4   - . , , ,
                                                            .                                      ~,    -

EPIP-RR-51-{" Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure , s . EPIP-RR-51 - APPENDIX 1 DIRECTOR OF CONSTRUCTION A. Personnel Assignment Primary (Job Title) Manager - Special Projects Alternate (Job Title) Manager - Civil Engineering B. Reporting Location Brandeis Building C. Reports To Design and Construction Manager D. Supervises / Coordinates

                                                                                                      ,s Construction Forces                                                                     1.9 E. Primary Responsibility Directs and administratively controls all construction forces and their subcontractors performing such construction tasks to meet the requirements of the Emergency Recovery Organization.

F. Basic Duties

1. Upon notification of Emergency Recovery Organization activation, the primary and/or alterrate Director of Construction designate (s) will report to their ass .gned location listed in Section B of this appendix and inform the Design and Construction Manager of his/her presence.
2. Provides direct contact between OPPD and the construction personnel on all administrative and construction matters.
3. Directs, coordinates and approve 'll construction tasks assigned by the Design and Construction Marager.
4. Assures that all construction forces are adequately manned and equipped to provide timely construction support.
                                                                                                       ~)

ISSUEO FC/EPIP/02 R3 04-30-86 APR 3 01986

 ~  __.                 ~.                                              ..

EPIP-RR-51-3 F. Basic Duties (Continued)

5. Coordinates the work of suppliers and/or subconstractors providing construction materials and/or services.
6. Coordinates with Administrative Logistics Group in areas of material procurement, human resources, etc.

m-- m b)

         ~

r. 7 ISSUED  ! FC/EPIP/02 APR 3 0 iS86 R3 04-30-86 -

   -.                ^

EPIP-RR-65-1 Fort Calhoun Station Unit No. 1 EMERGENCY PLAN IMPi.EMENTING PROCEDURE EPIP-RR-65 Emergency Recovery Organization's EOF Comunicator I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Emergency Recovery Organization filling the position of EOF Comunicator. II. PREREQUISITE Both primary and alternate individuals filling the position of EOF 4 Comunicator have been fully trained and are aware of their duties and responsibilities. III. PRECAUTIONS None I

V. PROCEDURE

Upon activation of the Emergency Recovery Organization, those individuals l assigned to the position of EOF Comunicator shall carry out this assignment in Appendix 1 of this implementing procedure. r i + 3 SUED 4 J APR 3 01986 ,' FC/EPIP/01 R1 04-30-86 -

                                                                                                              ~
     ,                                                                           EPIP-RR-65-2 Fort Calhoun Station Unit No. 1                   -
                                                                                                        ^

EMERGENCY PLAN IMPLEMENTING PROCEDURE . EPIP-RR-65 APPENDIX 1 EOF Comunicator A. Personnel Assignment Primary (Job Title) _ By Recovery Manager designation Alternate (Job Title) By Recovery Manager desination B. Reporting Location Emergency Operations Facility C. Reports To EOF Administration Supervisor 4 D. Supervisor / Coordinates . N/A E. Primary Responsibility Provides telephone conference comunications between the FCS Control Room, TSC, EOF and state and county E0Cs. F. Basic Duties

1. Upon notification of Emergency Recovery Organization activation, the l primary and/or alternate EOF Comunicator designate (s) will report to their assigned location listed in Section B of this appendix and inform the EOF Administration Supervisor of his/her presence. l
2. Be prepared to provide around-the-clock operation.
3. Performs telephone comunications on the Conference Operations Network between OPPD functions, state and county E0Cs.

4 Provides conference capabilities through the Conference Operations Network for the Recovery Manager and staff.

5. Sets up, operates, and maintains the telephone tape recorder.
6. Maintains log of comunication messages.
7. Assists in other comunication activities as directed by the ,

l EOF Administration Supervisor. I FC/EPIP/01 R1 04-30-86 APR 3 01986

                           -                                                                           EPIP-RR-66-1

[ ~ Fort Calhoun Station Unit No. 1 EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-RR-66 Emergency Recovery Organization's Comunication Specialist , I. PURPOSE -_ The purpose of this procedure is to detail assignment and responsibilities of - personnel in the Emergency Recovery Organization filling the position of . . Communication Specialist. < - II. PREREQUISITE  ;

                      -            Both primary and alternate individuals filling the position of Comunication Specialist have been fully trained and are aware of their duties and responsibilities.                                                                               . .

III. PRECAUTIONS None I

V. PROCEDURE

            .                      Upon activation of the Emergency Recovery Organization, those individuals-                   L assigned to the position of Comunication Specialist shall carry out this assignment in Appendix 1 of this implementing prucedure.                                                - -

[ g 1SSUED , r APR 3 01986 l R1 04-30-86 l FC/EPIP/01 l w vr

   . . .                                                                          --.      ,       . . . . .               1 EPIP-RR-66-2 Fort Calhoun Station Unit No. 1                   -                    -

EMERGENCY PLAN IMPLEMENTING PROCEDURE .

                                                                                                                     ~

EPIP-RR-66 APPENDIX 1 Comunication' Specialist A. Personnel Assignment Primary (Job Title) By Recovery Manager designation Alternate (Job Title) By Recovery Manager desination B. Reporting Location Emergency Operations Facility C. Reports To EOF Administration Supervisor

D. Supervisor / Coordinates 6 I N/A E. Primary Responsibility Provides support to set up, checkout, repair, and maintain all available comunication systems in the Emergency Operations Facility.

l F. Basic Duties

1. Upon notification of Emergency Recovery Organization activation, l the primary and/or alternate Comunication Specialist designate (s) will report to their assigned location listed in Section B of this appendix and informs the E0F Administration Supervisor of his/her presence. After arrival this individual will place a call to the Comunications Support Coordinator and advise of location and phone extension.
2. Be prepared to provide around-the-clock operation.
3. Upon reporting to the EOF, checks out comunications equipment to ensure it is functioning properly.

l . ISSUED FC/EPIP/01 R1 04-30-86 l ,-. .

[ _._.. . . . . . . . _ . . . , . ~ EPIP-RR-66-3

                  .                                                        a-APPENDIX 1
           .-                                                                  (Continued)
4. Removes telephone sets stored in Room 2 from cabinet and places them at

_.prede.signated work locations throughout the EOF building. Ensures the ~~ telephones are operational when phone lines have been activated by ! Northwestern Bell. - 1 i 5. Provides for emergency repairs to the OPPD microwave, UHF radio, j Centrex, PABX systems and telephones. ~ l \

6. Provides instructions to members of the Emergency Recovery Organization on the capabilities and operation of the two conference networks if .

required. .

7. Telephones in Rooms 11 and 14 must be changed from normal (Training ( l

! Dept.) lines to emergency lines. To do this, perform the followGg i s teps: -  ! l b. CJ C. . d. e. 4 ! f. Installs other phones as required. Check telephones to verify procedure has been done correctly. g.

8. Checks or has checked, by means of TI 745 type terminal, the status
;                                                 cf Blair C.O. trunks from FCS Rolm CBX. If any two trunks become tied together, calls Plant Operator to have him/her release them by the Direct Select (##8) method. This is done during conference use at intervals not to exceed two hours.

l 9. Requests additional assistance from the Comunications Support Coordinator as nedded. , Ia3UCC . r-l R1 04-30-86 FC/EPIP/01 . APR 3 01986

2:  ? f, REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) ACCESSIOH NBR'. ENr44 dim 6449- DOd, DATE: 86/12/15 NOTARIZED: NO DOCKET # FACIL: 50-2BS Fort Calhoun Sta' tion, Unit 1, Omaha Public Power Dist 05 COO 2S5 AUTH.NAME AUTHOR AFFILIATION ANDREWS.R.L. Omaha Public Power District RECIP.NAME RECIPIENT AFFILIATION MARTIN, R. D. Region 4. OPfice of Director

SUBJECT:

Forwards central files version of changes to emergency plan implementing procedures, including proprietary Procedure RR-66. Withheld. DISTRIBUTION CODE: AX45D COPIES RECEIVED: LTR t_a ENCL 2 SI ZE:

                                                                      /            c2+/%

TITLE: Emergency Plan or Implementing Procedures (Proprietary) NOTES: RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL PWR-B PD8 LA I 1 1 PWR-B PD8 fpb M J 1 1 SELLS D ef 1 1 INTERNAL @ M/DRM f(sp 1 1 IE/DEPER/EPD $ 2-. 1 1 IE/DEPER/IRB qf y 1 1 REG FILES $5p 1 1 TOTAL NUMBER OF COPIES REGUIRED: LTTR 7 ENCL 7}}