05000266/LER-1998-002, Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements

From kanterella
Revision as of 04:06, 15 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements
ML20202D827
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/09/1998
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202D833 List:
References
NPL-98-0085, NPL-98-85, NUDOCS 9802180013
Download: ML20202D827 (1)


LER-2098-002, Forwards LER 98-002-00,re High Voltage Station Auxiliary Transformer Failure Due to Ground in Low Voltage Side Bus Duct.New Commitments within Rept Indicated in Italics Per 10CFR50.73(a)(2)(i)(B) Requirements
Event date:
Report date:
2662098002R00 - NRC Website

text