|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
b l UNITED STATES j
[/* **%g1 NUCLEAR REGULATORY COMMISSION j
-5 ,E REGloN IV )
l 6II RYAN PLAZA DRIVE, sulTE 400
,g
- ARUNGToN, TEXAS 760118064 APR I 41999
- Mr. C. L Terry TU Electric
- Senior Vice President und Principal Nuclear Officer l
ATTN: Regulatory Affairs Department j P.O. Box 1002 i Glen Rose, Texas 76043 L
SUBJECT:
SUMMARY
OF PUBLIC MEETING HELD ON MARCH 29,1999, AT THE COMANCHE PEAK STEAM ELECTRIC STATION TO PRESENT PLANT
! PERFORMANCE REVIEW RESULTS l
Dear Mr. Terry:
l This refers to the public meeting conducted on March 29,1999, at the Support Services Building - Training Room, Comanche Peak Steam Electric Station, Glen Rose, Texas. The purpose of the meeting was to discuss the results of the Plant Performance Review, which was completed on February 11,1999, and transmitted to you on March 19,1999' The meeting provided an opportunity for you, your staff, and the NRC to discuss the performance insights
. noted in the review and how they can be used to further improve operations at the Comanche
, Peak site. The meeting also provided a forum for local govemmental officials to meet with the NRC and to be familiarized with the new assessment process and the agency's preparation for Y2K.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any que's'tions conceming this matter, we will be pleased to discuss them with you.
Sincerely,
. an re%or ivision o ea or Projects Docket Nos.: 50-445;50-446 License Nos.: NPF-87; NPF-89
Enclosure:
Attendance List 9904290106 990414 r PDR ADOCK 05000445 Y PDR g
)
C l
TU Electric cc w/ enclosure:
Mr. Roger D. Walker TU Electric Regulatory Affairs Manager P.O. Box 1002 Glen Rose, Texas 76043 i Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 George L Edgar, Esq.
Morgan, Lewis & Bockius 1800 M. Street, NW Washington, D.C. 20036 G. R. Bynog, Program Manager /
Chief Inspector Texas Department of Ucensing & Regulation Boiler Division P.O. Box 12157, Capitol Station ,
Austin, Texas 78711 i County Judge l P.O. Box 851 Glen Rose, Texas 76043 l
Texas Radiation Control Program Director l 1100 West 49th Street Austin, Texas 78756 John Howard, Director Environmental and Natural Resources Policy Office of the Govemor P.O. Box 12428 Austin, Texas 78711 The Honorable Dale McPherson P.O. Box 851 Glen Rose, TX 76043 Mac Yocham, Sheriff P.O. Box 1000 Glen Rose, TX 76043
f.-
TU Electric The Honorable Bobbie Gladwell Mayor of Glen Rose P.O. Box 87 Glen Rose, TX 76043 L
The Honorable Don Cleveland County Court Room 7 Granbuy,TX 76048 R. L. Jeanis P.O. Box 967 Granbury,TX 76048 The Honorable David Southern Mayor of Granbury P.O. Box 969 l
Granbury,TX 76048 Federal Emergency Management Agency R. L Young, Regional Director Region VI, Federal Center 800 North Loop 268 Denton, TX 76201-3698 Office of the Governor ATTN: Andy Barrett, Director State liaison Officer Environmental Policy P.O. Box 12428 Austin,TX 78711 Bureau of Radiation Control Department of Health ATTN: Richard Ratliff, Director 1100 W 49th Street Austin, TX 78756-3189 .
. Public Utility Commission William 9. Travis Bldg.
1701 North Congress Ave.
Austin TX 78711-3326 l
1 l
l
r TU Electric -4 APR I 41999 bec to DCD (1 0) Q bec distrib. by RIV:
Regional Administrator Resident inspector (2 copies)
. DRP Director DRS Branch Chiefs (3 copies)
DRS Director MIS System Branch Chief (DRP/A) RIV File Projed Engineer (DRP/A) Chief. NRR/ DISP /PIPB Branch Chief (DRP/TSS) Chief, OEDO/ROPMS Project Engineer (DRP/C) B. Henderson, PAO C. Gordon W. D. Travers, EDO (MS: 16-E-15)
T. Boyce, NRR/ DISP /PIPB' Records Center, INPO C. Hackney, RSLO Associate Dir. for Projects, NRR Associate Dir. for insp., and Tech. Assmt, NRR PPR Program Manager, NRR/lLPB (2 copies)
Chief, inspection Program Branch, NRR Chief, Regional Operations and Program Management Section, OEDO S. Richards, NRR Project Director (MS: 13D1)
L Burkhart, NRR Project Manager (MS: 13D1) l'\
l DOCUMENT NAME: R:\_CPSES\CP3-29MS.DRP !
To receive copy of document, indica's in bor: *C* = Copy without enclosures *E* = Copy with enclosures *N* = No copy l RIV:DRP/A l C:DRP/A l D:DRP l l l I DBAllen; lib @ JITapia @ KEBrockman 4/:( /99 4/lu/99 l]7 4/ N /99 GFFICJAL FTECORD COPY 3100 3
C nt'By: AJriit:d States Nucisar Regulator; 2548973112; Apr-7-99 12:13PM; Page 2/4 ENCLOSURE I
l 3 Li ff 1
( 5
,f)*f$ 0 7b W 0 $ S- A9 AJ/ QA% Tfd rt) e
- da Saumw wee-e - e2rnee sec.
I .
. ..... j ..
n
'i e
- l e =v 4
1
e
. 1 1
e
+3 1
4
(
f.
nt By: Unite,d States Nuclesr Regulator; 2548973112; Apr.7-99 12:13PMl Page a,.t
.i
- ! l
,; l 7 M fp
- .; )
f$ [/R $ Q 2 $-/0N/ 24*]'Ya N
!!t:veEReMa Tr=cd.S@ott ha sa_.eAa. Eu%eac9as J
iBobb y Bn penar Sg Mca melen ops i
S796 ks14 .sMtt w or geti on G tz. inA s JfEan,Jq l
((BisI LOM nmWaw . My. %d
- Dod bed _'ha Lse.ws% fr w3 . E'cy.ts30cy Ahs ._
{ % y . % k S o k c.:p; D e , vat M CL N w/ur Orwn ud .
Ynrea Ms &. see.~ miur. .
!?M % x; h r.Aa
%s .L\w-Tk;aybc LJac %nw. gr N @ Q ... .. - . l 1%,
- dm Ke.lku. VP k % k auw 2naena l[f 9 w & % )k fey Jk G.9 $ 6 % > % & . . 'Teg.wmo ! A 'y M 4
- j c. c.~ % sk&thsdwaareo l tau hs # Waciy OpA tJ a. .
sg au ToLRClh' . 33.% .' .. .. Ao> r I Wo w gi. % a S s I t orez Meusea.
ii S c o a t . 1 6 e 1 . . .. . ., A s w r M A s !, .
, /%a> ,
. b yOh5.$66 A '7Mbe4 d.yM A kv<.kv % ATf*'5 9
eh
?
+ .
.i *
- s * . s s -,
t
, )
f.
nt.By: United States Nucletr Regulator; 2548973112; Apr 7-99 12:13PE; Page 4/4 3btfM Amf p rz e or4xsw 2 4 ryn hek kuMg olec MSM6 cit c o a .sa e rs u r-
. Qd o Ac "Em M STP AL%a =O _._
{ av Cac.aJ o te e n a is s e coasacrelf lMh.-. hr 0 @C %w.kA . A%.ll0-Callaway
.h L Nf/akt Sper rs ea/ne-i&y w} /Har e gl~ cI Tus, R V %9e ro n h ic-
. Diety /n 7'4,/(3smiv7 b? WWe. .
.: %9hrsa MMonu Grea trJl Co. h-dqc. . . ..
\
! %dy A Bak 1k .4w~bN"604 ..
. 7/* /Ifc ttc#o3 4vi' d).r W h M99ts L'c $mN TM-Co-Set Mr. Tu5 3Avc er ops acut. Tur ;
2nuw ns.ea syshn fxy Mce Tu6 nu wwwc, Monr w Hca 7vc
.. Moetey. k?/rpre- h ad sig irM &' Tu.6
.;lil 4 Gut.n w ao ArrpumasAua ,n YM. MAGS b~r Heer QaueaMr. Tur 9
9
.,,a TU Electric APR I 41999 bec to DCD (IE40) bec distrib. by RIV: t Regional Administrator Resident inspector (2 copies)
DRP Director DRS Branch Chiefs (3 copies) j DRS Director MIS System Branch Chief (DRP/A) RIV File Project Engineer (DRP/A) Chief, NRR/ DISP /PIPB Branch Chief (DRP/TSS) Chief, OEDO/ROPMS Project Engineer (DRP/C) B. Henderson, PAO
)
C. Gordon W. D. Travers, EDO (MS: 16-E-15)
T. Boyce, NRR/ DISP /PIPB Records Center, INPO i C. Hackney, RSLO Associate Dir, for Projects, NRR Associate Dir. for insp., and Tech. Assmt, NRR PPR Program Manager, NRR/lLPB (2 copies)
Chief, inspection Program Branch NRR Chief, Regional Operations and Program Management Section, OEDO S. Richards, NRR Project Director (MS: 13D1)
L. Burkhart, NRR Project Manager (MS: 13D1) l DOCUMENT NAME: R:\_CPSES\CP3-29MS.DRP To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N' = No copy RIV:DRP/A C:DRP/A D:DRP DBAllen; lib ACA JITapia @ KEBrockman 4/ ( /99 4/lu/99 l V 4/[4/99 0FFICIAL RECORD COPY