ML20198H981

From kanterella
Revision as of 12:07, 21 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 851216-20
ML20198H981
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/22/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20198H979 List:
References
RTR-REGGD-01.033, RTR-REGGD-1.033 50-369-85-44, 50-370-85-45, NUDOCS 8601310147
Download: ML20198H981 (1)


Text

I 1

i s,

. i

.l ENCLOSURE 1 NOTICE OF VIOLATION l

Duke Power Company Docket Nos. 50-369 and 50-370 McGuire License Nos. NPF-9 and NPF-17 1

The following violation was identified during an inspection conducted on  ;

December 16-20, 1985. The Severity Level was assigned in accordance with the j NRC Enforcement Policy (10 CFR Part 2, Appendix C). t i

Technical Specification 6.8.1 stated that written procedures shall be  ;

established, implemented and maintained for certain activities including i applicable procedures in Appendix A of Regulatory Guide 1.33-1978.

Appendix A of Regulatory Guide 1.33 required procedures for radiological i surveys.  :

F Station Health Physics Manual, Section 8.3, Radiological Status and Routine  !

Surveys, and its attached Exhibit 8.3-2, Routines and Their Frequencies, i stated the requirements for survey type, frequency and documentation. i Contrary to the above, from November 1 to December 13, 1985, approximately i ten percent of daily and five percent of weekly surveys were not performed. l This is a Severity Level IV violation (Supplement IV).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) -

or 10 CFR 73.21.

i Date: 2-G I

j 5

P B601310147 860122 I

{DR ADOCK 05000369 PDR, i

_ _ - . _ _ . _ _ _. . __ _ . _ _ _ .- _ _ _