MONTHYEARML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 LR-N980104, Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 1 ML20203B6741998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Hope Creek Generation Station,Unit 1 ML20198T3591997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Hope Creek Nuclear Generating Station,Unit 1 ML20203B6841997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 & Jan 1998 for Hope Creek Generation Station,Unit 1,summary of Changes,Tests & Experiments ML20198T4061997-11-30030 November 1997 Revised MOR for Nov 1997 for Hope Creek Nuclear Generating Station,Unit 1.Summary of Changes,Tests,Experiments & Refueling Info,Encl ML20203K3751997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Hcgs,Unit 1 ML20203K3821997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1 ML20199G5591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1 ML20199G5931997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for HCGS, Unit 1 ML20211Q6481997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Hope Creek Generating Station ML20212A5301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Hope Creek Generating Station,Unit 1,summary of Changes,Tests & Experiments ML20217A1491997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Hope Creek Generating Station,Unit 1 ML20217A6261997-07-31031 July 1997 Revised Monthly Operating Rept for Jul 1997 for Hope Creek Generating Station,Unit 1 LR-N970503, Monthly Operating Rept for Jul 1997 for Hope Creek Generating Plant Unit 11997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Hope Creek Generating Plant Unit 1 ML20149F2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for HCGS ML20149F3061997-05-31031 May 1997 Revised Monthly Operating Rept for May 1997 for Hope Creek Generating Station.Summary of Changes,Tests & Experiments Encl ML20140H6761997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Hope Creek Generating Station Unit 1.Summary of Changes,Tests & Experiments Implemented in Apr 1997 Included in Rept LR-N970321, Monthly Operating Rept for Apr 1997 for Hope Creek Generating Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Hope Creek Generating Station ML20137X7311997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Hope Creek ML20147F6051997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Hope Creek Generating Station ML20147F6111997-01-31031 January 1997 Revised MOR for Jan 1997 for Hope Creek Generating Station LR-N970110, Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 11997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 1 ML20133M9831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Hope Creek Generating Station ML20133B7901996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Hope Creek Generation Station Unit 1 LR-N966376, Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 1 ML20129A8271996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Hope Creek Generation Station Unit 1 ML20134C0941996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Hope Creek Generation Station ML20116P0181996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Hope Creek Unit 1 ML20117C3331996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Hope Creek Generation Station Unit 1 ML20134C1031996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 Hope Creek Generation Station ML20115E8491996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Hope Creek Generation Station ML20117C3701996-06-30030 June 1996 Revised Monthly Operating Rept for June 1996 for Hope Creek Generating Station ML20116P0381996-06-30030 June 1996 Summary of Changes,Tests & Experiments That Had Been Implemented During June 1996 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F1501999-10-12012 October 1999 Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20217M0211999-09-20020 September 1999 Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG ML20211N5531999-09-0808 September 1999 Safety Evaluation Supporting Amend 121 to License NPF-57 ML20211B3781999-08-13013 August 1999 Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8331999-07-26026 July 1999 Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History ML20216D8721999-07-26026 July 1999 Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 ML20210F3331999-07-22022 July 1999 Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8901999-06-30030 June 1999 IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206Q4731999-05-14014 May 1999 SER Accepting Response to GL 97-05, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8451999-04-30030 April 1999 Rev 1, Submittal-Only Screening Review of Hope Creek Unit 1 IPEEE (Seismic Portion). Finalized April 1999 ML20206C8481999-04-22022 April 1999 SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i) LR-N990157, Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced1999-04-12012 April 1999 Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20205G6051999-03-19019 March 1999 SER Accepting Relief Request Re Acme Code Case N-567, Alternate Requirements for Class 1,2 & 3 Replacement Components,Section Xi,Div 1 ML20205F8911999-03-18018 March 1999 Safety Evaluation Authorizing Licensee Requests for Second 10-year Interval for Pumps & Valves IST Program ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20202F6861999-01-26026 January 1999 Engine Sys,Inc Part 21 (10CFR21-0078) Rept Re Degradation of Synchrostat Model ESSB-4AT Speed Switches Resulting in Heat Related Damage to Power Supply Card Components.Caused by Incorrect Sized Resistor.Notification Sent to Customers ML18107A1871998-12-31031 December 1998 PSEG Annual Rept for 1998. ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With ML18107A1881998-12-31031 December 1998 PECO 1998 Annual Rept. LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With ML20198N4161998-11-12012 November 1998 MSIV Alternate Leakage Treatment Pathway Seismic Evaluation LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with ML20155J9861998-10-31031 October 1998 Non-proprietary TR NEDO-32511, Safety Review for HCGS SRVs Tolerance Analyses LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 ML20236E9491998-06-30030 June 1998 Rev 0 to non-proprietary Rept 24A5392AB, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8 ML18106A6821998-06-24024 June 1998 Revised Charting Our Future. ML18106A6681998-06-17017 June 1998 Charting the Future. LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 ML20248C7381998-05-22022 May 1998 Rev 0 to Safety Evaluation 98-015, Extension of Allowed Out of Service Time for B Emergency Diesel Generator LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML18106A5851998-03-0303 March 1998 Emergency Response Graded Exercise,S98-03. Nuclear Business Unit Salem,Hope Creek Emergency Preparedness, 980303 1999-09-08
[Table view] |
Text
_ - _ - - __ __ _- _ . _ . _ . . _ . _ _ _ _ _ _ . _ _ _ -_ _ _._
6 i
I DOCKET NO.: 50-354 i UNIT:. Hope Creek j DATE: '11/06/97 -
COMPLETED BY: R. Ritzman ;
TELEPHONE: (609) 339-1445 SUNNARY... 0F._ CHANGES , . 'I ESTS , _ AND_ EXPERIMENTS {
EQR..THE HOPE C MONW AKPIEMBER 1991 The following items completed during September 1997 have been evaluated.to determines ;
- 1. If the probability of occurrence or the consequences of- i an accident or malfunction-of equipment important to safety ,
. previously evaluated in the safety analysis report may be ;
increased; or j
- 2. If_a possibility for an a':cident or malfunction of a ,
-different type than any evaluated previously in the safety i analysis report may be created; or
'3. If the margin of safety as defined in the basis for any technical specification is reduced.
The 10CFR50.59 Safety Evaluations showed that these items did not create a new safety hazard to the plant nor did they affect the !
safe shutdown of the_ reactor. These items did not change the i plant effluent-releases and did not alter the existing t environmental impact. The 10CFR50.59 Safety Evaluations
-determined that no unreviewed safety or environmental questions
) are involved.
-Rasian Changis uS i ===ry of Safety Evaluations i SEC-0008, Pkg. 2, Hand Geometry A. cess Project. This design change removes the security badge issue and retrieval booths from the-security center. The design change involves a revision to
-the Security Plan,-which was submitted to the NRC for review on June 26, 1997. The security badge issue and retrieval booths -
were removed because hand' geometry was installed, and a waiver .
was granted allowing security badges to be takin home. }
The portion:ofEthis change that involves che Security Plan was made in accordance with 10CFR50.54 (p) , and was approved by the NRC on September 2,~1997. This design change does not involve an Unreviewed Safety Question.
R
_ . _ . - . .,m . .. _ . _ _ _ . _ . _ - _ . . . .. . . _ . . _ _ _ _ . _ , . _ . _ -
O 4 l
T_emporary Modificat % s S4Ba&Iy of Safety Evaluatio.ng THR*$7-012, Replacaer,t of Service Water Loop "B" Yard Dif fuser Beehive Grate with a Blind Flange. This temporary modification replaces the "B" Service Water Loop Yard Diffuser beehive grate with a blind flange to maintain secondary containment integrity. .
This temporary modification was installed in support of the "B" Service Water Loop outage. A valve and rupture disc were removed ,
for maintenance, which woulc Save allowed a direct path from the ;
reactor building to the outside environment if the blind flange !
had not been installed. l The blind flange is consistent with the Servi.:e Water piping in i both design and materials and exceeds the secondary pressure requirements. Secondary containment integrity will be maintained during all phases of the blind flange installation, operation, ,!
and removal. The blind flange will only be installed during the "B" Service Water loop outage. Therefore, this temporary i
~
modification does not involve an Unreviewed Safety Question.
Procedpros SugagIy_of Safety Evaluations ,
NC.NA-AP.ZZ-0002 (Q) , Revision 2, Nuclear Business Unit Organization. This procedure' revision shifts responsibilities within the Salem operations department, revises the Salem ;
operations organization succession of authority, and changes titles in both the Hope Creek and Salem operations departments. l These changes do not affect any systems, structures, or components, and do not reduce any qualification or training requirements. These changes are consistent with the intent of the Standard Review Plan. Therefore, this procedure revision does not involve an Unreviewed Safety Question. !
THC.OP-GP.EG-0001(Q), Revision 0, Safety Auxiliaries cooling System Flow Balanco Verification Procedure. This new procedure was written to obtain actual system flows and differential pressures after adjusting throttle valves and during various Safety Auxiliaries Cooling System component alignments. The purpose of the procedure is to validate analytical values obtained via a computer model.
The components that are affected by this procedure each have at least-one 100% redundant component. Each redundant component is physically and electrically separated from the other. The
- component being tested will be removed from service and declared. '
inoperable. The procedure taaintains a suf ficient number of operable components and does not affect the systems ability to fulfill the design requirements. Therefore, this new p.ocedure does not involve'an Unroviewed Safety Question.
l l
l
UFSAR Chance Notices Summary of Safety Evaluations '
CN 97-558, Nuclear Operations Department Organization Change.
This UFSAR change shifts responsibilities for the Nuclear Security and the Loss Prevention organizations within the Nuclear Operations Department. These groups reported to the General Manager - Nuclear Maintenance. As a result of this change notice, Loss Prevention will report to the General Manager _- Hope Creek Operations and Security wil? report to the General Manager Salem Operations.
These changes do not affect any systems, structures, or components, and do not reduce the any qualification or training requirements. These changes are consistent with the intent of the1 Standard Review Plan. Therefore, this UFSAR chance notice does not involve an-Unreviewed Safety Question.
Deficiency Rgoorts Summary of Safety Evaluation.g
'There were no changes in this category implemented during September 1997.
9ther Su- ery of Safety Evaluati2D HCR.8-008, Hopo Creek Reload Safety Evaluation for Cycle 7 Extension. This safety evaluation was written to document the justification to extend the previously defined cycle 7 reload core design end cc cycle condition. The extended operation of cycle 7 was evaluated by PSE&G. The analyses and evaluations were. based on NRC approved methods obtained from GE, and assumed re.ted power operation to a higher exposure than previously
-analyzed and assumed a power coastdown to a new end of cycle exposure.
The evaluation and analysis assumptions have been selected to provide a bounding bases relative to actual projected operation.
No new functions or conditions are required of systems, structures or components during the extension period. Operation was' conducted within the existing power / flow map and within allowable system configurations. The nuclear, thermal-hydraulic, and thermal mechanical characteristics of the reload core are within-the existing UFSAR bases. Therefore, this safety evaluation does not involve an Unreviewed Safety Question.
~
SCM0071, Use-of P1BACK Version 3.1 as a Backup to the Hope Creek Process Computer.- This safety. evaluation was written to document LtheLaddition of an independent off-line backup to the on-line process computer that is used to monitor process variables and to calculate plant parameters. The use of the backup computer provides greater redundancy to allow for more accurate monitoring of core conditions if the process computer is unavailable. Since
.the change is limited to changes to a backup computer, this safety evaluation does not involve an Unreviewed Safety Question.