Forwards Motor-Operated Valve Testing & Evaluation at Perry Nuclear Power Plant (IE Bulletin 85-003), Final Rept
ML20151A188
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/31/1988
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151A190 List:
References
IEB-85-003, IEB-85-3, PY-CEI-NRR-0835, PY-CEI-NRR-835, NUDOCS 8804060347
Download: ML20151A188 (1)


Text

-

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO BOX 97 m PERRY. OH'O 44081 e TELtPHONE (216) 259 3737 e ADDRESS to CENTER ROAD Semng The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan VICE PRESO(NT wcura caove March 31, 1938 PY-CEI/NRR-0835 L U.S. Nuclear Regulatory Commission Document Conf rol Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docke t Nos. 50-440 IE Bulletin 85-03 Final Report

Dear Gentlemen:

IE Bulletin 85-03 requires the testing and evaluation of high pressure ECCS motor-ope rated valve s. Perry responded to this bulletin with a program scope and completion schedule in PY-CL1/01E-0206 L dated May 14, 1986. The attached report completes our response to this bulletin, with the overall conclusion that the subject valves have been lef t in an operable condition in accordance with the bulletin's requirements.

The CE1 program f or testing and evaluating HOV operability also meets and exceeds the BWR Owners Group position as defined in letter BWROG-8645 dated September 2,1986, and in addition addresses operability of valves out of no rmal position.

Very truly your ,

Al Kaplan Vice President Nuclear Group l AK: cab Attachments cc: K. Connaughton T. Colburn Regional Administrator, USSRC Region Ill g

\

\

\

8804060347 000331 0 PDR ADOCK 050 0