ML20151D135

From kanterella
Revision as of 14:13, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Revised Monthly Operating Rept for May 1988 for Point Beach Nuclear Plant Unit 1
ML20151D135
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/31/1988
From: Krause C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20150F851 List:
References
NUDOCS 8807220374
Download: ML20151D135 (1)


Text

_

- ;gy UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 f-dh.1R M' .

UNIT NAME Paint Beach Unit-1.

DATE June 17, 1988

"$$ REPORT MONTH MAY 1988 COMPLETED BY C. W. Krause

"$ r; TELEPHONE 414/221-2001

> PJ

  • CO 7A c 00 o 9 tJ C3 c.a ce W Qo c 00 o to C o be E,

e co 04 - ee L4 o Os o

@{,@ No. Date c yg g 'g c g Licensee Event Sf gj Cause & Corrective Action rg g ::: g gye Report No. y ag To Prevent kecurrence a gjm m u

=

i 1 880409 S 470 C 4 N/A ZZ ZZZZZZ Shutdown for annual refueling and maintenance 2 880521 S .6 B 6 N/A ZZ ZZZZZZ Generator taken off line to complete post-outage turbine overspeed tests 1 F: Forced 2 Reason: 3 Method:

  • Exhibit G-Instructions S: Schedtaled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load LExhibit I-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)