ML20151D123

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for June 1988 for Point Beach Nuclear Plant Units 1 & 2 & Revised Monthly Operating Rept for May 1988 for Point Beach Nuclear Plant Unit 1
ML20151D123
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/08/1988
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20150F851 List:
References
CON-NRC-88-064, CON-NRC-88-64 VPNPD-88-353, NUDOCS 8807220368
Download: ML20151D123 (1)


Text

__

e

^

Wisconsin Electnc POWER COMPANY 231 W. Mechoort Po. Box 20% MAoAce.Wi 53201 (414)221-2345 VPNPD-88-353 NRC-88-064 July 8, 1988 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Washington, D. C. 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of June 1988.

Also attached is revised "Unit shutdowns and Power Reductions" report for the month of May 1988. Please substitute this copy for the one included with my letter of June 10, 1988.

Very truly yours, dufag C. W. Flay Vice President Nuclear Power Attachments Copies to R. S. Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector 8807220368 880708 DR ADOCKOSOOg6 I

l

.4 sum!i,qafilicwinEwarth7mtivt

.. - -. -